Attachment 2 - TW 23 GUY Exhibit Line Item Sheet.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- W569QE-23-Q-0009 - Tradewinds 23 Tent Labor / Generators / HVAC / Electrical - Presolicitation
- Solicitation number
- W569QE-23-Q-0009
- Issued by
-
Department of the Army
About this file
This document outlines requirements for a federal contract to provide tent flooring, power generation, air conditioning, and electrical services. The contractor will furnish supplies, labor, transportation, equipment, and other items necessary to install and later uninstall twenty-eight tent floors, ninety-two HVAC units, three 200KW generators, and 564 electrical outlets at Camp Stephenson and Seweyo in addition to four tent floors and HVAC units at the Air Base in London. The performance period is from July 11, 2023 to July 2023 for setup and August 28 to August 3, 2023 for teardown. The contractor must also provide defense base act insurance from July 1 to August 3, 2023. The solicitation was issued by the Department of the Army under number W569QE-23-Q-0009.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CLIN | ELIN | SUPPLIES/SERVICES | LOCATION | Period of Performance | QUANTITY | UNIT OF ISSUE | UNIT PRICE | AMOUNT |
| CLIN 0001 | SET-UP | Camp Stephenson, Seweyo, Airbase London | 1 JUL-11 JUL2023 |
Fully Operationally Capable NLT 12 JUL 23
| 1001 | Provide and install twenty-eight (28) tent floors (24x Camp Seweyo, 4x Air Base London) | ||||||||
| Cost must include the use of these throughout contract period of performance. | 1 JUL-11 JUL2023 | ||||||||
| Fully Operationally Capable NLT 12 JUL 23 | 28 | EACH | |||||||
| 1002 | Provide and install Heating Ventilation Air Conditioning (HVAC) Units in tents with 24 hour repair services and daily service inspection of the generators | ||||||||
| Cost must include the use of these throughout contract period of performance. | 2 JUL-11 JUL2023 | ||||||||
| Fully Operationally Capable NLT 12 JUL 23 | 92 | EACH | |||||||
| 1003 | Provide and install 200KW Generators (Diesel) with 24 hour repair services and daily service inspection of the generators (110v capable) | ||||||||
| Cost must include the use of these throughout contract period of performance. | 3 JUL-11 JUL2023 | ||||||||
| Fully Operationally Capable NLT 12 JUL 23 | 3 | EACH | |||||||
| 1004 | Provide and install five hundred and sixty-four (564) 110v electrical outlets (6x per tent) | 4 JUL-11 JUL2023 | |||||||
| Fully Operationally Capable NLT 12 JUL 23 | 564 | EACH | |||||||
| 1005 | Install Government provided light set cases in tents (2x per tent) | 5 JUL-11 JUL2023 | |||||||
| Fully Operationally Capable NLT 12 JUL 23 | 184 | EACH | |||||||
| 1006 | Misc Fees (Provide details if needed) | 1 | EACH | ||||||
| TOTAL: | $ - 0 | ||||||||
| CLIN 0002 | TEAR-DOWN | Camp Stephenson, Seweyo, Airbase London | |||||||
| 2001 | Uninstall twenty-eight (28) tent floors (24x Camp Seweyo, 4x Air Base London) | 28 JUL-3 AUG 23 | |||||||
| 100% Complete NLT 3 AUG 23 | 28 | EACH | |||||||
| 2002 | Uninstall Heating Ventilation Air Conditioning (HVAC) Units in tents | 28 JUL-3 AUG 23 | |||||||
| 100% Complete NLT 3 AUG 23 | 92 | EACH | |||||||
| 2003 | Uninstall three (3) two-hundred (200) kilowatt power generators | 28 JUL-3 AUG 23 | |||||||
| 100% Complete NLT 3 AUG 23 | 3 | EACH | |||||||
| 2004 | Uninstall five hundred and sixty-four (564) 110v electrical outlets (6x per tent) | 28 JUL-3 AUG 23 | |||||||
| 100% Complete NLT 3 AUG 23 | 564 | EACH | |||||||
| 2005 | Uninstall Light Sets (Total of 184 lights sets with 2x Light Set Per Tent) | 28 JUL-3 AUG 23 | |||||||
| 100% Complete and packed NLT 3 AUG 23 | 184 | EACH | |||||||
| 2006 | Misc Fees (Provide details if needed) | 1 | EACH | ||||||
| TOTAL: | $ - 0 | ||||||||
| CLIN 0003 | DBA INSURANCE | Camp Stephenson, Seweyo, Airbase London | |||||||
| 3001 | Defense Base Act Insurance | 1 JUL to 3 AUG 23 | 1 | EACH | |||||
| TOTAL: | $ - 0 | ||||||||
| OVERALL TOTAL: | $ - 0 |