Attachment 2_TE 2 Snow removal check off sheet.pdf

PDF 102 KB Posted

Attached to
Snow Removal Services at Coast Guard Academy
Solicitation number
70Z08426QDL950021
Issued by

About this file

This is a Technical Exhibit serving as a Snow Plowing Check-off Sheet (Revised January 2023) that establishes procedures and documentation requirements for snow removal contractor mobilizations at an Academy facility.

The document outlines four primary procedural requirements: contractors must check in at the main gate upon arrival, logging actual arrival time and number of plow trucks; clear and treat the Child Development Center and Deshon Street Gate 1 hour prior to anticipated base opening; clear and treat the Flagpole parking area prior to 0730 AM and at sunset; and provide a completed check-off sheet to the Academy Snow Removal Officer or designated representative before departure. The check-off sheet requires contractors to document the date, arrival time, number of drivers onsite with individual arrival times, and time of completion. Contractors must initial all areas confirming they have been plowed, cleared, and/or treated, including main roads and parking lots per contract drawings, Chase Hall Center Quad area, U-Lot parking, multiple loading docks (Chase B Galley, Michel Hall, Chase C Clothing Locker, Johnson Hall), Hamilton Hall East Side Garage Door and parking, trash storage areas, Billard Garage door, housing unit back roads and garage areas, Lower Base Railroad Crossings, Boiler Plant front and back parking, MCOE Garage doors and storage, Yeaton Hall Consolidated Club trash area, Munro Parking Circle, Cadet Memorial Field (when applicable), and Access Gates. Special requirements prohibit blocking trash hauler access to dumpsters and piling snow around access gates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 2

SNOW PLOWING CHECK OFF SHEET – Revised January 2023

The following procedures shall be followed during all Snow removal Contractor mobilizations:

1. Check in with the main gate upon arrival, log actual arrival time and number of plow trucks on scene.

2. Clear and treat Child Development Center and Deshon St Gate 1 hour prior to anticipated base opening.

3. Clear and treat the Flagpole parking are prior to 0730 AM and sunset.

4. Prior to checking out with the Academy Snow Removal Officer or his designated representative, provide the completed check-off sheet: Initial all areas identified below insuring these areas have been plowed, cleared and/or treated prior to departure.

Date_________ Arrival Time _____

Number Drivers Onsite and arrival Times_____/_____/_____/_____/_____/_____/_____/

Time Complete_______

All Main Roads and Main Parking lots as identified on the contract drawing, Technical Exhibit 1

Chase Hall Center Quad area (off Bear Dr): ____

U-Lot parking area: ____

Chase B Galley Loading Dock: ____

Michel Hall Loading Dock: ____

Chase C Clothing Locker Entrance, Loading Dock and North Quad areas: ____

Hamilton Hall East Side Garage Door and Parking area: ____

Trash Storage areas – Do Not Block Trash Hauler’s Access to Dumpsters: ____

Billard Garage door: ____

Housing Units - Back Road and Garage Parking areas: ____

Lower Base Railroad Crossings (2): ____

Boiler Plant Front and Back Parking areas: ____

Johnson Hall Loading Dock: ____

MCOE Garage doors and Storage areas: ____

Yeaton Hall, Consolidated Club Trash area: ____

Munro Parking Circle: ____

Cadet Memorial Field, when applicable: _____

Access Gates – Do Not Pile Snow Around Gates: ____