Attachment_2_Task_List.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Solicitation for Article 520 Radiological Release of the AS-41 Ex-Mckee
Solicitation number
N4215821R0003
Issued by

About this file

This solicitation seeks proposals for Article 520 Radiological Release support services aboard the ex-McKee. The Navy intends to award a firm fixed price contract for tasks including piping, ventilation, and equipment removal from radiological and support spaces to facilitate decommissioning. Prospective offerors must register in SAM.gov and not be suspended or debarred. The anticipated period of performance is September 2021 through September 2023.

View the file

Other files

File Type Posted
Attachment_3_Final_Berth_Location.pdf PDF
Exhibit_A.pdf PDF
Attachment_5_StaffingPlanWithoutCost.xlsx XLSX spreadsheet
Attachment_1_AS_41_Spaces.xlsx XLSX spreadsheet
Attachment_7_PastPerformanceQuestionnaire.doc DOC document
Attachment_11_QASP.docx DOCX document
N4215821R0003 EX MCKEE RFP.pdf PDF
Attachment_10_DD254.pdf PDF
Attachment_8_Past Performance_Information_Form.docx DOCX document
Attachment_6_StaffingPlanWithCost.xlsx XLSX spreadsheet
Attachment_9_Contractor_Performance_Customer_Input_Sheet_Questionnaire.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RADIOLOGICAL SPACE PIPING / VENTILATION / EQUIPMENT REMOVAL

PIPING REMOVAL
TILES AND CONCRETE NEED TO BE REMOVED FROM VARIOUS SPACES TO ALLOW THE REMOVAL OF RLW DECK PENETRATIONS. REMOVE THE TILES AND CONCRETE AROUND RLW DECK PENETRATIONS IN THE VESTIBULE (2-95-1-L), VESTIBULE (2-95-2-L), BOILER WATER CHEMISTRY ROOM (3-91-1-Q), REACTOR INSTRUMENT SHOP (3-92-4-Q) AND CONTAMINATED LAUNDRY (4-94-2-Q). REMOVE THE TILES AROUND RLW DECK PENETRATIONS IN THE RADCON OFFICE (3-96-5-Q). REMOVE THE TERRAZO AROUND RLW DECK PENETRATIONS IN THE CHANGE ROOM (CLEAN SIDE) (3-96-0-Q). A SECTION OF LAGGING IN THE CHANGE ROOM (CLEAN SIDE) (3-96-0-Q) NEEDS TO BE REMOVED TO SUPPORT THE REMOVAL OF RLW PIPING. REMOVE CONCRETE AND TILES FROM DECK. (14" DIA> REMOVED)
REMOVE 9 SECTIONS OF RLW TANK TOP PIPE FROM CONTAMINATED LAUNDRY TANK 7-95-1-W, 8 SECTIONS OF RLW TANK TOP PIPE FROM EFFLUENT TANK 7-93-1-W, 8 SECTIONS OF RLW TANK TOP PIPE FROM EFFLUENT TANK 7-95-3-W, 8 SECTIONS OF RLW TANK TOP PIPE FROM EFFLUENT TANK 7-96-1-W AND 14 SECTIONS OF RLW TANK TOP PIPE FROM OUTBOARD EFFLUENT TANK 7-94-1-W TO SUPPORT TANK REMOVAL. ELECTRICALLY DISCONNECT HIGH LEVEL ALARM FROM TANK EACH TANK. ALL PIPE PENETRATIONS ON THE TANK TOP WILL BE SEALED USING GRIP SEALS, FLANGES OR PIPE CAPS.
REMOVE 5 MUFFLERS FROM SHIELDED PIPING SECTIONS AND REMOVE FROM SHIP. REMOVAL BY UNBOLTING AND JACKING MUFFLERS ONTO SHIELDED PIPE SECTIONS. REMOVE LARGE CABLEWAY FOUNDATIONS AS REQUIRED FOR JACKING OF MUFFLERS. FOR EACH MUFFLER, A DRAIN AND VENT HOLE WILL BE DRILLED IN LOWER END OF EACH MUFFLER TO ALLOW FOR DRAINAGE OF ANY WATER IN MUFFLER. DRAINING DONE INTO RAD DRAPE. ALL MUFFLERS BOLTED. INSTALL SHIPFITTER PADEYES AS NEEDED FOR RIGGING.
MOVING 5 MUFFLERS ON SHIELDED PIPING SECTIONS TO UNCOVER UNSHIELDED PIPING JOINT. MOVING WILL BE DONE BY UNBOLTING AND JACKING MUFFLERS ONTO SHIELDED PIPE SECTIONS. REMOVE PIPE SUPPORTS/HANGER SUPPORTS AS REQUIRED FOR JACKING OF MUFFLERS. INSTALL SHIPFITTER PADEYES AS NEEDED FOR RIGGING.
AFTER MUFFLER REMOVAL PER ANOTHER PROCEDURE, REMOVE SHIELDED PIPING. THE DESIGN OF THE SHIELDED PIPE IS SUCH THAT ALL PIPING WILL HAVE TO BE REMOVED. 43 FT OF PIPING IN 6 SECTIONS WILL BE REMOVED FROM 3 SPACES. ALL PIPING WILL BE SHIPPED TO ENERGY SOLUTIONS. SPACES FOR REMOVAL INCLUDE ACCESS TRUNK (6-95-2-T), PURE WATER FACILITIES ROOM 5-94-2-Q AND CONTAMINATED LAUNDRY ROOM 4-94-2-Q. REMOVAL INCLUDES 3 BULKHEAD/DECK PENETRATIONS (1 SHIELDED, 2 UNSHIELDED), REMOVAL OF HANGERS AS NEEDED. HULL PENETRATIONS WILL BE PERFORMED BY ANOTHER TGI. ROUTING OF PIPING OFF SHIP WILL INCLUDE CUTTING A LARGE ACCESS BETWEEN PURE WATER FACILITIES ROOM AND CONTAMINATED LAUNDRY ROOM AND RIG UP AND OUT THROUGH THE HULL . OTHER BULKHEAD/DECK CUTS WILL BE PERFORMED FOR RIGGING PURPOSES. THESE CUTS WILL BE BETWEEN PURE WATER FACILITIES ROOM AND AT ACCESS TRUNK (6-95-2-T), AND BETWEEN CONTAMINATED LAUNDRY 4-94-2-Q AND PURE WATER FACILITIES ROOM 5-94-2-Q. INSTALL SHIPFITTER PADEYES AS REQUIRED FOR RIGGING. PIPING ENDS WILL BE SEALED WITH HEAT SHRINK/QUICK CAPS.
AFTER MUFFLER REMOVAL PER ANOTHER PROCEDURE, REMOVE SHIELDED PIPING. THE DESIGN OF THE SHIELDED PIPE IS SUCH THAT ALL PIPING WILL HAVE TO BE REMOVED. 60 FT OF PIPING IN 5 SECTIONS WILL BE REMOVED FROM 2 SPACES. ALL PIPING WILL BE SHIPPED TO ENERGY SOLUTIONS. SPACES FOR REMOVAL INCLUDE SD ISSUE ROOM 4-86-3-A and SD STOREROOM (REPAIR PARTS) 5-86-3-A. REMOVAL INCLUDES 2 BULKHEAD/DECK PENETRATIONS (1 SHIELDED, 1 UNSHIELDED), REMOVAL OF HANGERS AS NEEDED. NECESSARY BULKHEAD/DECK CUTS WILL BE PERFORMED ACCORDING TO ANOTHER TGI. A DECK CUT MAY BE PERFORMED FOR RIGGING PURPOSES BETWEEN SD STOREROOM (REPAIR PARTS) 5-86-3-A AND SD ISSUE ROOM 4-86-3-A.
REMOVE RAD PIPE FROM Change Room Contaminated Side Approx. 30 ft of piping to be remove. CHANGE ROOM (CONTAMINATED SIDE)-3-96-4-Q- REMOVE APPROX 30 FT OF PIPE, DOWNSTREAM OF VALVE RW-205 INCLUDING ONE DECK PENETRATION AND DRAIN PIPING IN OVERHEAD WITH ONE BLKHEAD PENETRATION. REMOVE TWO SINKS AND ASSOCIATED PIPING.
REMOVE RAD PIPE FROM Boiler Water Chem Room. BOILER WATER CHEMISTRY ROOM- 3-91-1-Q- REMOVE APPROX. 15 FT OF PIPE INCLUDING ONE DECK AND ONE BULKHEAD PENETRATION AND ONE PENETRATION THROUGH SINK. CUT DRAIN OUT OF SINK (DRAIN SEALED). REMOVE 1 UNSHIELDED DECK DRAIN.
REMOVE RAD PIPE FROM THE CONTAMINATED PARTS STOREROOM AND WASTE PACKING AREA 7-95-0-A. [38 PIECES TOTAL]. CONTAMINATED PARTS STOREROOM AND WASTE PACKING AREA 7-95-0-A- REMOVE APPROX. 90 FT OF PIPE WITH ONE PENETRATION AND ONE UNSHIELDED DECK DRAIN.
REMOVE RAD PIPE FROM THE CONTAMINATED PARTS STOREROOM AND WASTE PACKING AREA 7-95-0-A. [38 PIECES TOTAL]. REMOVE APPROX 15 FT OF LAGGING FROM PIPE.
REMOVE RAD PIPE FROM CONTAMINATED LAUNDRY ROOM 4-94-2-Q. CONTAMINATED LAUNDRY - 4-94-2-Q- REMOVE APPROX. 105 FT OF PIPE INCLUDING 7 PENETRATIONS AND 3 UNSHIELDED DECK DRAINS AND ONE SINK DRAIN PENETRATION THROUGH THE SINK. REMOVE APPROX. 15 FT OF LAGGED PIPE
REMOVE RAD PIPE FROM CLEAN ROOM-3-88-2-Q. CLEAN ROOM-3-88-2-Q. REMOVE 2 UNSHIELDED DECK DRAINS.
REMOVE RAD PIPE FROM CONTAMINATED TOOL ISSUE ROOM-3-96-6-A. CONTAMINATED TOOL ISSUE ROOM- REMOVE 1 VENT PIPE OPEN END
REMOVE RAD PIPE FROM CLEAN WELD ROOM-3-92-2-Q. CLEAN WELD ROOM-3-92-2-Q- REMOVE 2 UNSHIELDED DECK DRAINS
REMOVE RAD PIPE FROM SD ISSUE ROOM 4-86-3-A. REMOVE LAGGING FROM RAD PIPING
REMOVE RAD PIPE FROM SD ISSUE ROOM 4-86-3-A. REMOVE RAD PIPING FROM SD ISSUE ROOM 4-86-0-A : RLW deck drain & piping, 1 blkhd penetration, approx 6ft. RLW piping connected to test station, deck drain, 1 ceiling & 1 deck penetration, , approx 10ft. RLW pipe, 1 ceiling & 1 deck penetration, 1 ceiling & 1 deck penetration, approx 15ft.
REMOVE RAD PIPE FROM SD ISSUE ROOM 4-86-3-A. REMOVE RAD PIPING FROM SD ISSUE ROOM 4-86-0-A]: Rmv sample sink & RLW piping, 2 blkhd penetrations, , approx 12ft.
REMOVE RAD PIPE FROM SD STOREROOM (REPAIR PARTS) 5-86-3-A. No Lagging Removal required per C2380. REMOVE RAD PIPE FROM SD STOREROOM 5-86-3-A: Rmv approx 10 ft of pipe
REMOVE FIRE MAIN PIPE LOCATED IN THE DEMINERALIZER ROOM (6-95-0-Q) AND CONTAMINATED PARTS STOREROOM (7-95-0-A). THE LAGGING ON THE PIPE WAS PREVIOUSLY REMOVED. REMOVE FIRE MAIN PIPE FROM THE DEMIN ROOM (6-95-0-Q) AND CPS (7-95-0-A): RMV APPROX 30 FT OF PIPE.
REMOVE RAD PIPE FROM Vestibule 2-95-1-L. VESTIBULE 2-95-1-L: REMOVE APPROX. 15 FT OF PIPE INCLUDING A LARGE HEPA FILTER HOUSING (HEPA FILTER HAS BEEN REMOVED). BULKCOUNT A 2 FT SECTION OF PIPING DOWNSTREAM OF THE HEPA FILTER TO RELEASE REMAINING PIPING GOING UP TO MAST. ONE DECK PENETRATION.
REMOVE RAD PIPE FROM EQUIPMENT DECON ROOM 5-95-0-Q. DECON RM-5-95-0-Q- RMV. APPROX. 10 FT OF PIPE FROM SINKS, INCLUDING 3 SINK PENETRATIONS AND TWO UNSHIELDED DECK DRAINS. PENETRATIONS (SHIELDED )
REMOVE RAD PIPE FROM THE DEMINERALIZER ROOM 6-95-0-Q. [101 PIECES TOTAL]. A MINIMUM OF 24 BULKHEAD/DECK PENETRATIONS ARE TO BE REMOVED. ONE UNSHIELDED DECK DRAIN TO BE REMOVED.
REMOVE RAD PIPE FROM THE DEMINERALIZER ROOM 6-95-0-Q. [101 PIECES TOTAL]. DEMIN RM (6-95-0-Q)- REMOVE APPROX. 700 FT OF PIPE. PIPING REMOVAL INCLUDES NON-SHIELDED FILTERS, ALL SMALLER RLW COMPONENTS (PRESSURE SWITCHES ETC.). REMOVE AND BULKCOUNT 6 [2 FT] SECTIONS OF PIPING TO RELEASE TLI AND OTHER PIPING. BULKCOUNT FIREMAIN SPOOLPIECE AFTER CUTTING IN HALF TO RELEASE FIREMAIN SYSTEM. 6 RLW , 2 DECK, AND 2 SINK PENETRA
REMOVE NON-NUCLEAR PIPING FROM CONTAMINATED PARTS STOREROOM AND WASTE PACKING AREA 7-95-0-A. CONTAMINATED PARTS STRM & WASTE PACKING AREA 7-95-0-A RMV LP AIR DOOR OPERATOR ASSEMBLY PP, APPROX 150FT. RMV LP AIR DOR OPERATOR ASSEMBLY PP FOR ACCESS TRUNK, APPROX 60FT. RMV HYDRAULIC OPERATOR PP , APPROX 70FT
REMOVE NON-NUCLEAR PIPING FROM CONTAMINATED PARTS STOREROOM AND WASTE PACKING AREA 7-95-0-A.
REMOVE NON-NUCLEAR PIPING FROM CHANGE ROOM (CONTAMINATED SIDE)-3-96-4-Q. CHANGE ROOM (CONTAMINATED SIDE)-3-96-4-Q- RMV LUBE OIL SUPPLY/RETURN PP, RUNS INTO ADJACENT SPACE , APPROX 20FT. RMV HOT/COLD WATER LAGGED PP, RUNS INTO ADJACENT SPACE, APPROX 64FT. RMV OVERHD PP, APPROX 11FT. RMV COND DRAIN PP UP TO , APPROX 45FT. RMV FLUSHING LAGGED PP, APPROX 12FT.
REMOVE NON-NUCLEAR PIPING FROM PIPE CLEANING ROOM-3-88-0-Q. PIPE CLEANING ROOM-3-88-0-Q- RMV LP AIR PP, APPROX 25FT. RMV PLUMBING VENT PP, APPROX 20FT.
REMOVE NON-NUCLEAR PIPING FROM PIPE CLEANING ROOM-3-88-0-Q. PIPE CLEANING ROOM-3-88-0-Q- RMV SERVICE STEAM SUPPLY/RETURN LAGGED PP, APPROX 15FT. RMV FRESH WATER LAGGED PP, APPROX 30FT. RMV EYE WASH SINK & ASSOC PP, APPROX 18FT. RMV SERVICE STEAM SUPPLY/RETURN LAGGED PP, APPROX 20FT.
REMOVE NON-NUCLEAR PIPING FROM CLEAN ROOM-3-88-2-Q. CLEAN ROOM 3-88-2-Q- RMV LP AIR PP, APPROX 30FT. RMV PLMB DRN PP, APPROX 18FT. RMV LP AIR PP & ASSOC GAGE/VALVES, APPROX 8FT. RMV ARGON PP, APPROX 20FT. RMV NITROGEN VENT PP, APPROX 50FT.
REMOVE NON-NUCLEAR PIPING FROM CLEAN WELD ROOM-3-92-2-Q. CLEAN WELD ROOM 3-92-2-Q- RMV LP AIR PP ASSEMBLY DOOR OPERATOR, APPROX 50FT. RMV FLUSHING WATER LAGGED PP, APPROX 33FT. RMV STEAM SUPPLY LAGGED PP, APPROX 35FT.
REMOVE NON-NUCLEAR PIPING FROM CLEAN WELD ROOM-3-92-2-Q. CLEAN WELD ROOM 3-92-2-Q- RMV LP AIR PP & ASSEMBLY GAGE/VALVES, APPROX 70FT. RMV LP AIR FILTER ASSEMBLY PP, APPROX 6FT. RMV PLUMB DRAIN PP, APPROX 20FT.
REMOVE NON-NUCLEAR PIPING FROM CLEAN WELD ROOM-3-92-2-Q
REMOVE NON-NUCLEAR PIPING FROM CONTAMINATED LAUNDRY ROOM 4-94-2-Q. CONTAMINATED LAUNDRY 4-94-2-Q- RMV DRAIN LAGGED PP FOR DRYER#1, APPROX 24FT. RMV DRAIN LAGGED PP FOR DRYER#2, APPROX 24FT. RMV HOT FRESH WATER LAGGED PP TO SINK, APPROX 15FT. RMV COLD FRESH WATER LAGGED PP TO SINK, APPROX 20FT. RMV AC DRAIN, APPROX 11FT.
REMOVE NON-NUCLEAR PIPING FROM CONTAMINATED LAUNDRY ROOM 4-94-2-Q. CONTAMINATED LAUNDRY 4-94-2-Q- RMV LP AIR PP IN PASSAGE 4-97-2-L, UP TO 7FT ABOVE DECK , APPROX 5FT. RMV LP AIR PP TO WASHERS, APPROX 40FT. RMV PLUMB DRAIN LAGGED PP, APPROX 20FT. RMV SUPPLY STEAM LAGGED PP TO DRYERS, APPROX 35FT.
REMOVE NON-NUCLEAR PIPING FROM CONTAMINATED LAUNDRY ROOM 4-94-2-Q
REMOVE NON-NUCLEAR PIPING FROM SD ISSUE ROOM 4-86-3-A . REMOVE PIPING FROM SD ISSUE ROOM 4-86-3-A [28 PIECES]: Rmv all tank level indicator pipe, Rmv all service steam drain pipe. Rmv all solid drain pipe. Rmv all tank vent pipe.
REMOVE NON-NUCLEAR PIPING FROM SD ISSUE ROOM 4-86-3-A . REMOVE PIPING FROM SD ISSUE ROOM 4-86-3-A [43 PIECES]: Rmv all waste/plumb drain pipe. Rmv all fire main. Rmv all overflow pipe. Rmv pipe, (approx 50ft). Rmv all air escape pipe for tanks.
REMOVE NON-NUCLEAR PIPING FROM THE FOLLOWING GROUP 4 SPACE: REACTOR INSTRUMENT SHOP 3-92-4-Q. REACTOR INSTRUMENT SHOP 3-92-4-Q: RMV HOT/CHILL WATER LAGGED PIPING UP TO 7FT ABOVE DECK, ~45FT. RMV SPOT HEATER AND ASSOC. (STEAM SUPPLY) LAGGED PIPING UP TO 7FT ABOVE DECK, ~37FT. RMV PLUMB SOIL DRAIN PP, ~35 FT. RMV PLUMB VENT PP, ~15 FT. RMV EXHAUST VENT PP, ~15 FT. REMOVE SUPPLY VENT PP, ~34 FT, UP TO 7 FT ABOVE DECK.
REMOVE NON-NUCLEAR PIPING FROM THE FOLLOWING GROUP 4 SPACE: REACTOR INSTRUMENT SHOP 3-92-4-Q.
REMOVE NON-NUCLEAR PIPING FROM EQUIPMENT DECON ROOM 5-95-0-Q. EQUIPMENT DECON ROOM 5-95-0-Q- LP AIR DOOR OPERATOR ASSEMBLY PP IN DECON RM, APPROX 210FT. RMV LP AIR DOOR OPERATOR ASSEMBLY PP IN DECON RM (DOOR TO NUC TRUNK), APPROX 105FT.
REMOVE NON-NUCLEAR PIPING FROM EQUIPMENT DECON ROOM 5-95-0-Q. EQUIPMENT DECON ROOM 5-95-0-Q- RMV EYE WASH STATION WATER PP, APPROX 10FT. RMV SERVICE STEAM DRAIN/SUPPLY LAGGED PP, APPROX 42FT.
REMOVE NON-NUCLEAR PIPING FROM EQUIPMENT DECON ROOM 5-95-0-Q. EQUIPMENT DECON ROOM 5-95-0-Q- RMV LP AIR DOOR OPERATOR ASSEMBLY IN PASSAGE, UP TO 7FT ABOVE DECK, APPROX 50FT.
REMOVE NON-NUCLEAR PIPING FROM BOILER WATER CHEM RM 3-91-1-Q- BOILER WATER CHEM RM 3-91-1-Q- REMOVE SPOT COOLER & ASSOC. LAGGED CHILL WATER SUPPLY/RETURN PIPING, APPROX 15 FT, & DRAIN PIPING, APPROX 15 FT, REMOVE SPOT HEATER & ASSOC LAGGED STEAM SUPPLY/DRAIN PIPING, APPROX 30 FT.
BOILER WATER CHEM RM 3-91-1-Q- RMV LP AIR PP, APPROX 7FT. RMV TWO LAGGED PP BEHIND HATCH, APPROX 24FT. RMV VENT PP IN OVERHD, APPROX 20FT. RMV DECK DRAIN IN CEILING AND ASSOC PP IN OVERHD, APPROX 15FT.
DEMINERALIZER ROOM 6-95-0-Q- RMV LP AIR DOOR OPERATOR PP IN DEMIN RM, APPROX 70FT. RMV FM DRAIN LAGGED PP IN PASSAGE, APPROX 15FT. RMV EFFLUENT PP (P-4-29 THRU P-4-31, P-4-38 AND P-4-39), APPROX 445FT. RMV DECON RM SINK DRAIN PP, APPROX 75FT. RMV AIR RELIEF PP, APPROX 20FT.
EQUIPMENT DECON ROOM 5-97-0-Q- RMV HOT PDW PP IN DECON RM, APPROX 40FT. RMV COLD PDW PPRMV COLD PDW PP IN ACCESS TRUNK 5-95-2-T, UP TO 7FT ABOVE DECK, P-2-110, APPROX 30FT. RMV HOT PDW PP (LAGGED) IN ACCESS TRUNK 5-95-2-T, UP TO 7FT ABOVE DECK, P-2-113, APPROX 20FT.
DEMINERALIZER ROOM 6-97-0-Q- RMV HOT PDW (LAGGED PP IN ACCESS TRUNK 6-95-2-T, UP TO 7FT ABOVE DECK, APPROX 10FT. RMV COLD PDW PP IN ACCESS TRUNK 6-95-2-T, APPROX 10FT.
DEMINERALIZER ROOM 6-97-0-Q- RMV PDW PP INTO SUMP, APPROX 50FT.
PIPE CLEANING ROOM-3-88-0-Q- RMV COLD PDW PP, APPROX 60FT. RMV HOT PDW LAGGED PP, APPROX 60FT.
CLEAN WELD ROOM 3-92-2-Q- RMV HOT PDW LAGGED PP, APPROX 10FT. RMV COLD PDW PP, APPROX 10FT.
CONTAMINATED PARTS STRM (7-95-0-A)- RMV PDW PP, APPROX 20FT.
CHANGE RM CONTAMINATED SIDE (3-96-4-Q)-RMV PDW PP, APPROX 11FT.
CLEAN ROOM (3-88-2-Q)-RMV PDW PP, APPROX 15FT.
NUCLEAR TRUNK (7-92-0-T)- RMV PDW (HOT PDW-LAGGED/COLD PDW) PP, APPROX 25FT.
REMOVE RAD PIPE FROM COFFERDAM 7-92-3-V. REMOVE APPROX. 500 FT OF PIPE (MAXIMUM 5 FT SECTIONS). PIPE SIZES RANGE FROM 3/8" TO 6". REMOVAL BOUNDARY IS TO WHERE THE TANK TOP PIPE WAS REMOVED.
REMOVE PIPING FROM RADCON TRAINING ROOM 3-86-3-Q [42 PIECES]: Disconnect condensate and supply to ventilation cooling coil. Rmv 25ft of steam supply (lagged) and 15ft of condensate piping (up to 7ft above deck), . Rmv waste water and drain (lagged) piping, approx 95 ft. Rmv 70 ft soil drain piping.
RADIAC CALIBRATION ROOM 3-88-4-Q: REMOVE UNIT COOLERS AND ASSOC. DRAIN PIPING APPROX 15FT. RMV CHILL WATER SUPPLY/RETURN PP, APPROX 20 FT. REMOVE SPOT HEATER AND ASSOC. STEAM INLET/OUTLET LAGGED PIPING UP TO 7FT ABOVE DECK APPROX 15FT. REMOVE LP AIR PIPING AND ASSOC. VALVES/GAGES APPROX 10FT. REMOVE SUPPLY VENT UP TO 7FT ABOVE DECK APPROX 15FT
REMOVE PDW PIPE FROM COFFERDAM (7-92-3-V). 2" PIPE / 30' OF PIPE TOTAL
CLEAN PARTS STOREROOM 4-91-2-A: Rmv approx 10ft pipe & 1 unshielded deck drain, . Rmv approx 6 ft pipe & 1 unshielded deck drain, .
PASSAGE 4-92-2-L: Rmv approx 10ft of pipe
PURE WATER FACILITIES ROOM 5-94-2-Q: Rmv approx 30 ft of piping.
REACTOR INSTRUMENT SHOP 3-92-4-Q: Rmv approx. 40FT w/ 1 deck penetration . Rmv 2 unshielded deck drains.
REMOVE RAD PIPING FROM RADCON OFFICER'S OFFICE 3-96-5-Q [6 PIECES]: Rmv approx 10ft of RLW vent piping, 1 deck penetration and 1 ceiling penetration, Rmv approx 30ft of RLW overflow piping, 3 deck penetrations and 1 blkhd penetration .
PASSAGE 3-94-0-L: Rmv approx. 45FT w/ 2 blkhd & 1 deck penetration.
REMOVE RAD PIPING FROM SD STOREROOM (REPAIR PARTS) 4-86-2-A. Remove 3 overhead penetrations and 3 bulkhead penetrations with approx. 10 ft of piping attached.
REMOVE RAD PIPING FROM Passage 3-93-2-L. Remove approx. 5 ft of piping.
REMOVE RAD PIPING FROM Change Room Clean Side 3-96-0-L. Remove approx.15 ft of piping. Remove 1 deck drain penetration.
REMOVE RAD PIPING FROM Clean Locker Room 3-96-1-A. Remove approx. 7 ft piping.
REMOVE RAD PIPING FROM Health Physics Room 3-96-3-Q. Remove approx. 20 ft piping.
REMOVE RAD PIPING FROM Access Trunk 5-95-2-T. Remove approx. 10 ft. of piping.
REMOVE RAD PIPING FROM Access Trunk 6-95-2-T. Remove approx. 10 ft. of piping.
REMOVE APD PIPING FROM THE FOLLOWING GROUP 4 SPACES TO AID ART. 520 RELEASE [53 PIECES]: CONTAMINATED PARTS STOREROOM & WASTE PACKING AREA 7-95-0-A: REMOVE APPROX 30 FT IN OVERHEAD. DECON ROOM 5-95-0-Q: REMOVE APPROX. 50 FT. DEMINERALIZER ROOM 6-95-0-Q: REMOVE APPROX. 25 FT OF PIPING.
VENTILATION REMOVAL
REMOVE VENT AND EXHAUST UNITS FROM CLEAN WELD ROOM. REMOVE 15 FEET VENT SUPPLY, 3 EXHAUST UNITS AND 8 FT EXHAUST VENT
REMOVE VENT FROM CLEAN ROOM 3-88-2-Q. REMOVE APPROX. 15' MONITORED VENT, 12' SUPPLY VENT, 1 UNIT AND 10' EXHAUST VENT
REMOVE VENT FROM PIPE CLEANING ROOM 3-88-0-Q. REMOVE APPROX. 2 UNITS AND 32' EXHAUST VENT, 25' SUPPLY VENT IN
REMOVE VENT FROM CHANGE ROOM CONTAMINATED SIDE 3-96-4-Q. REMOVE APPROX. 15' EXHAUST VENT, 10' SUPPLY VENT CONDUIT, AND 8' SUPPLY VENT DUCT
REMOVE VENT FROM CONTAMINATED LAUNDRY 4-94-2-Q. REMOVE APPROX. 30' SUPPLY VENT, 30' DRYER EXHAUST, AND 25' EXHAUST VENT
REMOVE VENT FROM EQUIP DECON ROOM 5-95-0-Q. REMOVE APPROX. 19' (OVERHEAD) EXHAUST VENT
REMOVE VENT FROM DEMIN ROOM 6-95-0-Q. REMOVE VENT FACE AND EXHAUST SYSTEM IN AN AREA OF ABOUT 23' x 14'
REMOVE VENT FROM CONT PARTS STRM AND WASTE PACKING AREA 7-95-0-A. REMOVE APPROX. 25' SUPPLY VENT, 2' EXHAUST VENT
REMOVE VENT FROM S.D. STOREROOM (REPAIR PARTS) 5-86-3-A. REMOVE APPROX. 5 FEET VENT
REMOVE VENT FROM CONTAMINATED TOOL ISSUE ROOM (3-96-6-A). REMOVE APPROX. 10' OF VENT
REMOVE VENTILATION FROM REACTOR INSTRUMENT SHOP (3-92-4-Q).
EQUIPMENT / FURNISHING / MISC REMOVAL
WASTE PRESS ENCLOSURE MUST BE REMOVED. DRAIN OIL FROM CONTAMINATED WASTE PRESS. DRAPE CSCA CONTROLS NEED TO BE ESTABILISH. COVER INACCESSIBLE SURFACES WITH YELLOW.
LATHE IS WRAPPED IN YELLOW AND COVER MUST BE REMOVED. DRAIN OIL FROM CONTAMINATED LATHE. DRAPE CSCA CONTROLS NEED TO BE ESTABILISH. COVER INACCESSIBLE SURFACES WITH YELLOW.
CLEAN ROOM 3-88-2-Q: REMOVE (HOIST PARTS, SEWING MACHINE AND TABLE, CLAMP MOUNTED TO TABLE). RIGGING SERVICES NEEDED FOR HOIST.
CONTAMINATED LAUNDRY ROOM 4-94-2-Q: REMOVE (WASHERS, DRYERS, PUMPS MOTORS). RIGGING SERVICES, HOT WORK, GAS MONITORING, AND FIREWATCH NEEDED.
CONTAMINATED PARTS STOREROOM 7-95-0-A; REMOVE THE CONTAMINATED WASTE PRESS. RIGGING SERVICES NEEDED
EQUIPMENT DECON ROOM 5-95-0-Q; REMOVE LATHE RIGGING SERVICES NEEDED
BOILER WATER CHEMISTRY ROOM 3-91-1-Q: REMOVE UNIT COOLER. (UNIT COOLER-RIGGING SERVICES NEEDED)
CLEAN WELD ROOM 3-92-2-Q: REMOVE (HOIST PARTS, CLAMP, SEWING MACHINE - RIGGING SERVICES REQUIRED, PORTABLE TIG). RIGGING SERVICES NEEDED
EQUIPMENT DECON ROOM 5-95-0-Q: REMOVE (CLAMP, UT CLEANER, HOIST PARTS, DRILL PRESS, SINK, SINK CABINETS). RIGGING SERVICES NEEDED FOR PRESS, AND SINK. HOTWORK, GAS MONITORING, AND FIREWATCH NEEDED TO REMOVE SINK. SINK W/ CABINETS (CONTAINS FIXED CONTAMINATION).
NUCLEAR TRUNK 7-92-0-T: REMOVE (RAIL, BUCKET SUPPORT). RIGGING SERVICES NEEDED
PIPE CLEANING ROOM 3-88-0-Q: REMOVE (ULTRASONIC CLEANER, SINK, HOIST PARTS, DRIP PANS). RIGGING SERVICES NEEDED FOR ULTRASONIC CLEANER, SINK, AND HOIST. HOTWORK, GAS MONITORING, AND FIREWATCH NEEDED TO REMOVE SINK FOUNDATION.
DEMINERALIZER ROOM 6-95-0-Q: REMOVE (FILTERS, PUMPS, MOTORS, DEMINERALIZERS, OVERHEAD HOIST PARTS, SAMPLE DEMINERALIZER FILTER) . RIGGING NEEDED TO REMOVE ALL ITEMS LISTED.
CONTAMINATED PARTS STOREROOM (7-95-0-A): REMOVE 3 DEMINERALIZERS. RIGGING SERVICES REQUIRED.
REMOVE SPOT COOLER AND ELECTRIC HEATER FROM REACTOR INSTRUMENT SHOP (3-92-4-Q)
REMOVE FURNISHINGS FROM PIPE CLEANING RM. ALL FOUNDATIONS WILL ALSO BE REMOVED. ITEMS TO BE REMOVED INCLUDE BUT ARE NOT LIMITED TO CABINETS, WALL PLAQUES, TABLES, LARGE ALUMINUM CANS (used to store hoses), SHELVES, SINKS, DECK GRATING, AND LOCKERS
REMOVE FURNISHINGS FROM CLEAN RM : ALL FOUNDATIONS WILL ALSO BE REMOVED. ITEMS TO BE REMOVED INCLUDE BUT ARE NOT LIMITED TO CABINETS, WALL PLAQUES, TABLES, LARGE ALUMINUM CANS (used to store hoses), SHELVES, SINKS, DECK GRATING, AND LOCKERS
CHANGE ROOM CONTAMINATED SIDE 3-96-4-Q: REMOVE CURTAINS, WALL PLAQUES, SOAP AND TOWEL DISPENSER, EMERGENCY CABINET
CONTAMINATED LAUNDRY ROOM 4-94-2-Q: REMOVE LOCKERS AND CABINETS, LAUNDRY BINS ON WHEELS, SETS OF SHELVING, WALL PLAQUES
EQUIPMENT DECON ROOM 5-95-0-Q: REMOVE CABINET, CONTAINERS WITH SHELVES, WALL PLAQUES, METAL STORAGE BOX, TABLE, EMERGENCY CABINETS, WORK BENCH
CONTAMINATED PARTS STOREROOM AND WASTE PACKING AREA 7-95-0-A: REMOVE CABINET/LOCKER, STORAGE LOCKERS, STORAGE BINS/CABINETS, WALL PLAQUES, HOSE STOWAGE RAILS MOUNTED ON WALL AND VERTICAL SUPPORTS FOR TEMPORARY SHELVING
S.D. STOREROOM (REPAIR PARTS) 5-86-3-A: REMOVE SET OF SHELVING, DESK, DECK GRATING, SHELVING, WALL PLAQUES EMERGENCY CABINET
S.D. ISSUE ROOM 4-86-3-A, REMOVE (20 SHELVES)
REACTOR INSTRUMENT SHOP, 3-92-4-Q: REMOVE CABINETS, WALL PLAQUES, DESK
BOILER WATER CHEMISTRY ROOM 3-91-1-Q: REMOVE WALL PLAQUES, CABINETS, SHELF, SINK - RIGGING SUPPORT NEEDED, WALL SUPPORT
DEMINERALIZER ROOM 6-95-0-Q: REMOVE STORAGE BIN, WALL PLAQUES, EMERGENCY CABINET, SOUND POWERED PHONE BOX
REMOVE 2 DECONTAMINATION SHOWERS FROM THE CHANGE ROOM (CONTAMINATED SIDE) (3-96-4-Q).
DISPOSITION RLW TANK MODULE
REMOVE AND DISPOSITION SUMP IN DEMIN ROOM (6-95-0-Q)
REMOVE AND DISPOSITION SUMP IN CONTAMINATED PARTS STOREROOM (7-95-0-A)
REMOVE AND DISPOSITION SUMP IN COFFERDAM (7-92-3-V)
DISPOSE PORTABLE EFFLUENT TANK (PET).
REMOVE ALL FURNISHINGS FROM GROUP 3 SPACE RADIAC CALIBRATION ROOM 3-88-4-Q. FURNISHINGS TO BE REMOVED INCLUDES, BUT NOT LIMITED TO DESKS, CABINETS, DISPLAYS, WALL SIGN HOLDERS, WORK BENCHES, SINK, REFRIGETORS, AND SHELVES.
REMOVE 1/8" THICK CRES SHEATHING ON INTERIOR SHELL PLATE IN WAY OF HULL ACCESS CUT ( 2 mechanics X 9 days ) (angle grinder cutting only CRES controls access cut size 6' 10" X 9' approx.)
REMOVE 1" THICK FIBERGLASS BOARD TYPE INSULATION BEHIND CRES SHEATHING ( LOE= 4 MHRS SWLIN 865E01)
REMOVE 4 RLW SYSTEM HULL PENETRATIONS LOCATED ABOVE THE WATER LINE (3 SPACES). REMOVE PENETRATIONS LOCATED IN THE FOLLOWING SPACES RADIOLOGICAL CONTROLS OFFICE (3-96-5-Q)-REMOVE THE RW OVERFLOW HULL PENETRATION. CONNECTED PIPING WILL BE CUT AND HULL PIPING WILL BE SEALED BY ANOTHER PROCEDURE. CONTAMINATED LAUNDRY ROOM-4-94-2-Q: REMOVE THE RESIN RECEIPT HULL PENETRATION INCLUDING THE CONTAINMENT RING ON THE HULL. FIRST SECTION OF SHIELDED PIPE MAY REMAIN ATTACHED TO HULL PENETRATION AND BE REMOVED IN ONE SECTION. NO PIPE CUTS WILL BE MADE PER THIS PROCEDURE. REMOVE EDUCTOR DISCHARGE FOR OVBD DRYER LINT DISPOSAL SHELL CONNECTION. CONNECTED PIPING WILL BE CUT AND HULL PIPING WILL BE SEALED BY ANOTHER PROCEDURE. SD ISSUE ROOM-4-86-3-A: REMOVE RESIN RECEIPT HULL PENETRATION. FIRST SECTION OF SHIELDED PIPE MAY REMAIN ATTACHED TO HULL SECTION AND BE REMOVED IN ONE PIECE. NO PIPE CUTS ARE MADE PER THIS PROCEDURE. FOR EACH PENETRATION CUT PER THIS PROCEDURE, A PATCH WILL BE INSTALLED, PAINTED AND AN AIR TEST WILL BE PERFORMED. PAINT SAMPLES WILL ONLY BE TAKEN ON THE HULL EXTERIOR IF THE HULL IS NOT RELEASED. PAINT SAMPLES WILL BE REQUIRED ON THE INTERIOR OF THE HULL IN THE CONTAMINATED LAUNDRY ONLY. NOTE THAT INSULATION MAY REMAIN BETWEEN THE HULL AND FALSE BULKHEAD IN THE CONTAMINATED LAUNDRY ROOM. INSULATION IS REMOVED PER ANOTHER TGI. [4 HULL PENETRATIONS]
DISASSEMBLE AND REMOVE LEAD ITEMS IN THE FOLLOWING SPACE: BOILER WATER CHEMISTRY RM (CHEST SCANNER), BOILER WATER CHEMISTRY RM (LEAD SHIELDED SAMPLERS)
REMOVE SHADOW SHIELDING BOXES (TOTAL QTY=APPROX 5) IN THE FOLLOWING SPACES: 2 ACCESS TRUNKS (5-95-2-T, 6-95-2-T) (2 IN OVERHEAD, 1 ON DECK), DECON ROOM (5-95-0-Q) (1 IN FALSE OVERHEAD) AND SD STOREROOM (5-86-3-A) (1)

AS-41 es-McKee Radiological Release Potential Tasks listing

Below is a list of piping, ventilation, and equipment that would have to be removed from the radiological and support spaces. List is NOT all inclusive nor is it guarenteed to be accurate. All values are estimates only. all removed material to be disposed of acourding to Federal, State, or Local Laws