Attachment 2 Sun Shade PWS 2024.pdf
PDF 218 KB Posted
- Attached to
- Creech AFB Sunshade Maintenance
- Solicitation number
- F3G2DC4094AQ01
About this file
This document is a Performance Work Statement (PWS) for the maintenance and repair of aircraft sunshades at Creech Air Force Base. The contractor shall inspect, maintain, and repair the 17 existing sunshades located on the flight line, in the LOLA area, and near building 718. The scope includes inspecting and maintaining the structure, fabric, lighting, electrical systems, and other attached features. The contractor must develop a Preventative Maintenance Plan, submit maintenance documentation quarterly, and respond to urgent and routine maintenance requests within specified timelines. The PWS outlines contractor personnel requirements, hours of operation, and government-furnished property and services. This PWS supports a federal contract opportunity for sunshade maintenance services at Creech AFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 SUNSHADE QASP 2024 (DRAFT).pdf | ||
| Attachment 1 Price List.xlsx | XLSX spreadsheet | |
| F3G2DC4094AQ01 QA.pdf | ||
| F3G2DC4094AQ01 Combo.pdf | ||
| Attachment 1 Price List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRCRAFT SUNSHADE STANDARDIZED PERFORMANCE WORK STATEMENT
(PWS)
PERFORMANCE WORK STATEMENT (PWS)
FOR
CREECH AFB AIRCRAFT SUNSHADES
March 2024
TABLE OF CONTENTS
SECTION A DESCRIPTION OF SERVICES
1.0 SCOPE OF WORK
1.1 Background
1.2 Mission
1.3 Scope
2.0 PROGRAM MANAGEMENT
2.1 Responsibilities
2.2 Maintenance Documentation
2.3 Planned and Contract Work
3.0 SAFETY
3.1 Contractor Liability
3.2 Spill Notification
3.3 Safety and Health Program
3.4 Safety Notification and Reporting
4.0 SECURITY
4.1 Identification and Credentials
4.2 Government-Furnished Security Training
4.3 Escorting
4.4 Retrieving Identification Media
4.5 Traffic Laws
4.6 Weapons, Firearms and Ammunition
4.7 Reporting
4.8 Photography
5.0 PERFORMANCE MANAGEMENT
5.1 Performance Management
5.2 Quality Control Manager
5.3 Performance Evaluation
5.4 Performance Evaluation Meetings, Conferences and Workshops
SECTION B SERVICE SUMMARY
1.0 SERVICE SUMMARY
1.1 Purpose
1.2 Components
1.3 Quality Assurance Surveillance Plan (QASP)
1.4 Right to Surveil
1.5 Service Summary Table
SECTION C GOVERNMENT-FURNISHED PROPERTY AND SERVICES
1.0 GOVERNMENT-FURNISHED PROPERY AND SERVICES
1.1 General Information
1.2 Government-Furnished Training
1.3 Manufacturer’s Information
SECTION D GENERAL INFORMATION
1.0 TRANSITION
1.1 Assuming Functional Responsibility
1.2 Access to Facilities
1.3 Phase-In Plan
1.4 Joint Inspection
1.5 Existing Conditions
1.6 Phase-Out Plan
2.0 CONTRACTOR PERSONNEL
2.1 Contractor Employees
2.2 Employee Training
3.0 HOURS OF OPERATION
3.1 Duty Hours
3.2 Holidays
3.3 Additional Down-days
SECTION E APPENDICES AND INSPECTION CHECKLIST
Appendix A Definitions
Appendix B Deliverables
Appendix C Maintenance Documentation
Appendix D Inspection Report
Attachment 1 Aircraft Sunshade Inspection Checklist
SECTION A
DESCRIPTION OF SERVICES
1.0 SCOPE OF WORK.
1.1 Background. Preventative Maintenance is the basis of Air Combat Command’s policy for aircraft sunshade sustainment. The government’s objective is to maintain safe and reliable aircraft sunshades.
1.2 Mission. The contractor shall sustain aircraft sunshades through scheduled inspections, preventive maintenance, and repair of deficiencies. Scheduled inspections will be required quarterly for Creech AFB aircraft sunshades.
1.3 Scope. The scope of this service is to support already existing and expected aircraft sunshades on Creech AFB. The current 17 sunshades on Creech AFB are located on the flight line behind buildings 1000 & 1003 (8), LOLA area (4), and by Raven near building718 (5). The contractor shall inspect, maintain and repair aircraft sunshades, to include structure, fabric & netting (as applicable), lights, electrical, bird nesting mitigation, lightning protection, obstruction lighting, safety reflective devices, fall protection, and any other base-unique attached features, as applicable. The contractor shall provide documentation of inspection, maintenance, and repair.
The contractor must supply the appropriate equipment to perform all aspects of support, e.g., functioning lift systems, tools, trucks, etc.
2.0 PROGRAM MANAGEMENT
2.1 Responsibilities. At a minimum, accomplish the following, to support aircraft sunshade maintenance requirements.
2.1.1 Inspect, Report, Document. Inspect for, report, and document:
a) Any sign of corrosion and paint deterioration
b) Signs of loosening and cracking on or around structural anchorage points
c) Any defect of concrete or asphalt around anchorage points
d) Proper torque for cables and other applicable structural hardware
e) Evidence of stress/buckling/fatigue/etc.
f) Excessive movement
g) Inherent structural weakness or instability
h) Signs of electrical, structural or mechanical failure
i) Electrical defects (lighting systems, electrical panels, cables, solar panels, conduit, and receptacles, if installed)
j) Severed, cut, torn hardware or tarp
k) Fabric and netting for tears, rips, rot, scrapes, scuffs, slack, etc.
l) Loose, damaged, missing, corroded, and/or failed hardware
m) Damage to foundation bolts, attaching hardware, columns, beams, bracing, joists, welds
n) Proper torque of foundation bolts
o) Possible Foreign Objects and cleanliness
p) Destroyed components
q) Reflective device/tape deterioration
r) Improper installation and design defects
s) Improper use
t) Weather related damage form high winds, snow, or ice
u) Wildlife intrusion
v) Any other noteworthy discrepancies
w) Any criteria mentioned in Attachment 1, Aircraft Sunshade Inspection Checklist, or outlined in AFI21-101 Chapter 15, Aircraft Sunshade Sustainment, not included in the above items
2.1.2 Preventative Maintenance Plan (PMP). Submit a document that provides details for how the contractor shall address all sub-paragraphs in sections 2.2 and 2.3 of the PWS, to include how aircraft sunshade configurations shall be maintained, and perform preventive maintenance of aircraft sunshades in accordance with this plan. The PMP shall be submitted to the
Contracting Officer (CO) NLT 60 calendar days after contract award and shall be non-proprietary.
2.1.3 Requests. Respond to CO requests within CO-requested timeframe. Extensions to CO-requested timeframes shall be approved by the CO prior to the needed extension (Per unit-specified timeframe).
2.1.4 Problem Management. Identify, document, and notify the government of actual or potential contractor program management problems and deficiencies, and report unresolved problems to the CO. Report site-specific problems affecting maintenance accomplishment and/or contractor performance to CO or Contracting Officer’s Representative (COR).
2.1.4.1 Corrective Action Priority. Perform corrective action IAW paragraph 2.3.4.
2.1.5 Meetings. Support meetings convened at the direction of the CO. The government shall reimburse the contractor for any government-directed travel requirements to support conferences, meetings, and/or reviews outside of the local commuting area. All travel shall be reimbursed IAW the contract. Frequency and method of meetings shall be determined by the CO.
2.1.6 Significant Incident Notification Procedure. Inform the CO within 24 hours of becoming aware of an incident that involves a contractor’s employee that may subject the employee, the contractor, or the government to either potential civil or criminal liability.
2.1.7 Compliance. The contractor shall comply with all applicable base regulations/instructions.
2.1.8 Personnel. Ensure that only qualified personnel perform inspection, maintenance and repair of aircraft sunshades.
2.1.8.1 Site Management. Provide a single point of contact (POC) for management of all aircraft sunshade activities.
2.2 Maintenance Documentation.
2.2.1 Documentation. The contractor shall maintain and submit maintenance documentation to the Creech Aircraft Sunshade Manager(s), via Microsoft Excel spreadsheet format or equivalent, such as in Appendix C, Maintenance Documentation. Maintenance documentation shall include aircraft sunshade condition (serviceable/unserviceable – see definition), scheduled and unscheduled maintenance activities, discrepancies, corrosion control actions, repairs needed, corrective actions, identified trends in discrepancies, and metrics. All documentation shall be considered an integral part of this contract and shall be nonproprietary in nature. This documentation shall be submitted quarterly for Creech AFB sunshades. If any activities have been performed or changed that pertain to section 2.3 of the PWS, documentation will be submitted whether work has or has not been performed.
2.2.1.1 Metrics. Track and report, the number of aircraft sunshades serviceable, needing repairs, number of repairs performed and service call response times by category. The contractor may submit additional recommended metrics and improvement efforts.
2.2.1.2 Reference Material. Maintain copies of applicable aircraft sunshade manuals, drawings, specifications, etc., for use in preventive maintenance, inspections, and/or repairs. Provide copies to the CO, as requested.
2.2.1.3 Documentation of Paint and Coating Use. The contractor shall maintain a complete history of use of paint and any other protective coating. Documentation shall include the date of use, type and amount of product used, to include brand name, process used, specific location where product was applied, and the contractor that performed the work. Provide documentation to the CO, as requested.
2.2.2 Requirements. The contractor shall perform tasks IAW manufacturers’ recommended inspection, maintenance, and/or repair procedures, industry standards, or best practices, (in that order) and be IAW applicable federal, state, and local building code and regulations, or equivalent military standard Unified Facilities Criteria (UFC) and Unified Facility Guide
Specifications (UFGS). Advise the CO of any conflicts/ambiguities in the various documents before beginning any task.
2.2.3 Alternate Procedures. The contractor may propose alternate maintenance procedures as a cost saving initiative or enhancement to inspection and or maintenance accomplishment. These procedures include deviations from preventive maintenance requirements when supported by technical analysis, test results, and documented conclusions. The CO shall approve all contractor-proposed deviations from preventive maintenance requirements prior to implementation.
2.3 Planned Work.
2.3.1 Scheduled Inspections. Perform and report Scheduled and Quarterly Inspections IAW manufactures’ recommended inspection procedures and/or industry standards or best practices for the following (but not limited to): lightning protection systems, lighting, and aircraft sunshade structure. The contractor shall submit inspection documentation to the Creech Aircraft
Sunshade Manager(s), with Microsoft Excel spreadsheet format in Appendix D, Inspection
Report or similar documentation, or equivalent. Any necessary repairs with cost estimates will need to be submitted to the designated government representative prior to repair initiation to ensure sufficient funds are available/approved on the contract. This shall be submitted NLT 30 calendar days after the inspection is accomplished.
2.3.2 Maintenance and Repair (M&R). M&R shall be performed for planned and contracted work, to include customer-submitted work requests (format to be provided by contractor).
Execute all routine M&R work not exceeding $2,500 (Services micro-purchase threshold) per inspection, maintenance, or repair action. Any actions over this threshold should be proposed by the contractor and approved by the CO prior to execution.
2.3.3 Customer Service. The contractor shall incorporate customer-provided work requests within scheduled maintenance activities.
2.3.3.1 Scheduling. Schedule work with the Creech Aircraft Sunshade Manager(s) to minimize disruption to mission requirements. Coordinate inspections, maintenance, and/or repair work
NLT 30 calendar days before work is scheduled.
2.3.3.2 Disruption. Coordinate any disruptions with the Creech Aircraft Sunshade Manager(s) prior to starting work. Provide notification, at least ten working days, prior to disruption (e.g., power outage, blocked access, inspection process, maintenance process, repair process, cleaning, and/or spraying). Disruptions shall provide the least amount of customer inconvenience. Notify the Creech Aircraft Sunshade Manager(s) within 24-hours of expected downtime due to disruption.
2.3.4 Work Priorities. The contractor shall include, in maintenance documentation, procedures for assessing, scheduling and performing urgent and routine corrective maintenance (CM) as follows:
2.3.4.1. Urgent Maintenance. Urgent maintenance is classified as a condition that is likely to create an emergency maintenance situation and/or render a sunshade unusable or unsafe if not acted upon immediately. The contractor shall have the capability to assess the urgent condition within 48 hours. The contractor shall initiate urgent action repairs within 72 hours, and complete urgent work within five days of notification unless a waiver has been obtained from the CO.
2.3.4.2 Routine Maintenance. Routine maintenance is classified as all other maintenance actions. The contractor shall incorporate routine maintenance into a planned work schedule. The contractor shall remove and replace all damaged hardware and/or parts on aircraft sunshade structures as required. All repairs will be at the discretion of government and shall be in accordance with manufacturer’s recommended preventive guidelines for specific sunshades.
2.3.5 Estimated Time to Repair (ETR). Establish an ETR for aircraft sunshade repairs. Provide status as changes occur via telephone or e-mail to the Creech Aircraft Sunshade Manager(s) within 8 hours of a known change from the planned schedule.
2.3.6 Work Clearance and Permits. Coordinate work with the Creech Aircraft Sunshade
Manager as required. Obtain digging, welding, and/or paint spraying permits IAW base operating instructions.
3.0 SAFETY
3.1 Contractor Liability. The contractor shall be liable and responsible for non-compliance of environmental safety and health (ES&H) provisions and pay fines and fees resulting from improper contractor actions and/or process.
3.2 Spill Notification. Notify the CO and the Creech Aircraft Sunshade Manager(s) immediately of any pollution incident, as per base requirements.
3.3 Safety and Health (S&H) Program. Establish responsibilities and procedures required to effectively administer conformance with Air Force (AF) Occupational Safety and Health
(AFOSH), Occupational Safety and Health Administration (OSHA), and AF Safety Instructions.
3.4 Safety Notification and Reporting. Notify the CO and the Creech Aircraft Sunshade
Manager(s) of any mishap involving contractor personnel, AF assets, or AF operations, which result in injury, illness, or damage. Establish internal mishap notification procedures and brief all contractor personnel. Document the mishap notification briefing as part of initial safety orientation. Document and report any mishap using local base procedures. Provide a copy of all mishap reports to the CO and the Creech Aircraft Sunshade Manager(s). Injuries to contractor personnel shall be reported IAW OSHA requirements. Maintain copies of all mishap reports for one year.
4.0 SECURITY
4.1 Identification and Credentials. All on-site contractor employees shall wear clothing appropriate to the tasks assigned and display the name of the company. Employees shall wear reflective vests while operating on the flight line. The contractor shall ensure all employees have the legal right to perform work within the United States and can pass appropriate security checks.
4.2 Government-Furnished Security Training. All contractor personnel shall receive base-specific security training from the Creech Aircraft Sunshade Manager(s) and/or unit Security
Manager for restricted access areas prior to being granted access to restricted areas.
4.3 Escorting. Contractor personnel without appropriate security clearance shall be escorted by authorized personnel within controlled and/or restricted areas.
4.4 Retrieving Identification Media. Retrieve all identification media, including vehicle pass, from contractor employees upon termination of employment; provide security termination briefings IAW Department of Defense (DoD) 5200.1-R. section C9.5, and AF Form 2587 according to Air Force Instruction (AFI) 31-401, Section 8E.
4.5 Traffic Laws. Comply with installation traffic regulations.
4.6 Weapons, Firearms, and Ammunition. Contractor employees shall not possess weapons, firearms, or ammunition on themselves, or within any vehicle, while on a United States Air
Force Base/Installation.
4.7 Reporting. Report to the CO or Creech Aircraft Sunshade Manager(s) any information or circumstances that may pose a threat to the security of DoD personnel, contractor personnel, or government resources (format to be determined by the CO or aircraft sunshade Manager) within
24-hours of the incident.
4.8 Photography. Contractor shall ensure no photographic equipment is permitted on the flightline by their personnel. If needed in the performance of their duties, contractor shall follow local base policies prior to taking photographs.
5.0 PERFORMANCE MANAGEMENT.
5.1 Performance Management. The contractor shall develop, document, implement, maintain, and continuously improve a comprehensive Quality Control Plan (QCP) that assures compliance with all PWS requirements of the PWS in general and specifically the items identified in the service summary table (Section B, Table 1.5). The QCP shall address frequency/interval, numbers and types of quality control (QC) inspections, the qualifications of personnel accomplishing those tasks, and how the contractor shall control the quality of any subcontractors.
The contractor shall submit the QCP to the CO NLT 45 calendar days after transition start.
5.2 Quality Control Manager. The contractor’s Quality Control Manager shall lead the contractor’s quality control efforts in establishing and implementing the QCP. The contractor shall train personnel in effective methods and techniques for inspecting the contractor’s conformance to requirements. The contractor shall act as the focal point for inspections, analysis of inspection results, and corrective actions and reports.
5.3 Performance Evaluation. Contractor performance outputs are subject to surveillance by a government COR to ensure PWS compliance. At a minimum, the contractor shall:
5.3.1 COR/CO Access. Allow COR(s) access to work areas and data, provide support, and not interfere with the CORs, State, Federal, and other designated personnel in the performance of their official duties. Permit the CO or authorized representative access to all records, data, and facilities used in the performance of the contracted services. Access shall be provided, as soon as possible, but is not to exceed one workday of the request. Extensions shall be approved by the
CO prior to the needed extension.
5.3.2 Non-Conformances. Take effective corrective action(s) for any non-conformance identified during internal or government surveillance.
5.4 Performance Evaluation Meetings, Conferences, and Workshops. Meet with the CO, COR, and/or other government personnel, on a periodic basis or as deemed necessary. The contractor may request a meeting with the CO when it is believed that such a meeting is necessary. The government may require meeting with the contractor to discuss compliance, performance, improvement, quality, and/or training opportunities. The purpose of these meetings is to foster proactive continuous improvement by analyzing past performance problems, as well as exceptional performance levels. These meetings shall review the contractor’s Quality
Management System (QMS) effort and the government’s Quality Assurance (QA) function focusing on improving performance. The use of DOD and industry best practices and quality tools/methods should be explored and implemented whenever possible. The government shall provide meeting minutes.
SECTION B
SERVICE SUMMARY
1.0 SERVICE SUMMARY (SS). This SS identifies critical success factors for the contract. The
SS items are listed in Table 1.5, Service Summary Table.
1.1 Purpose. The SS lists performance objectives for the required services the government shall surveil. The absence of any contract requirement from the SS shall not detract from its enforceability nor limit the rights or remedies of the government under any other provision of the contract including the clauses entitled “Inspection of Services” and “Default”.
1.2 Components. The SS states the performance objective (required service), and threshold
(performance standard, accept and reject points, if applicable, in either a qualitative or quantitative fashion) for each critical success factor.
1.3 Quality Assurance Surveillance Plan (QASP). The QASP identifies the audit methods and procedures the government shall use to evaluate the contractor's performance.
1.4 Right to Surveil. The government reserves the right to surveil all PWS services and requirements to determine whether the contractor is conforming to requirements and meeting performance objectives, standards, and thresholds.
1.4.1 Major Non-conformance. A major non-conformance is one that adversely impacts (or has the potential) mission, safety of personnel and/or equipment, environment, performance
(quality), schedule (delivery), and/or cost. The CO shall communicate major non-conformances to the contractor on a Corrective Action Request (CAR) form with a suspense date for the contractor’s corrective action plan. As a minimum, the contractor’s action plan shall address:
a) Action(s) taken to fix the problem (correction)
b) Action(s) taken to prevent recurrence
c) Corrective action(s) on the cause of the problem
d) Root cause analysis of the problem
1.4.2 Minor Non-conformance. A minor non-conformance is a non-conformance, which by itself does not adversely impact mission, safety of personnel and/or equipment, performance
(quality), schedule (delivery), or cost. Minor non-conformances are communicated through notices. First notices are issued for any identified minor non-conformance, and second notices are issued for repeat minor non-conformances or failing to correct minor non-conformance issues within a reasonable amount of time. A formal corrective action plan is not required for notices.
1.5. Service Summary Table.
PERFORMANCE
OBJECTIVE
PERFORMANCE
STANDARD
PERFORMANCE
THRESHOLD
Maintenance:
a. Maintain aircraft sunshade
IAW original equipment manufacturer (OEM) specifications or industry standards
b. Scheduled Maintenance and Inspections
Repair:
c. Completed in budget as proposed
d. Urgent Assessment
Response
e. Initiate Urgent Repair
f. Urgent Repair Completion
g. Routine Repair
h. Estimated Time to Repair
(ETR)
IAW original equipment manufacturer (OEM) specifications or industry standards
Completed and documented
100% of the time
Completed in budget as proposed
48 hours
72 hours
5 business days
IAW contractor’s PMP
Contractor ETR/Proposed
Deadline
No major non-conformances allowed
No major non-conformances allowed
+ 10% of contractor Estimate
Assessment made within 48 hours of damage being reported
Maintenance initiated within
72-hours of Response
90% Success Rate/100%
Success Rate on Rework **
90% Success Rate/100%
Success Rate on Rework**
+2 days of Contractor
ETR/Proposed Deadline
** Per section 2.3.4
SECTION C
GOVERNMENT-FURNISHED PROPERTY AND SERVICES
1.0 GOVERNMENT-FURNISHED PROPERTY (GFP) AND SERVICES.
1.1 General Information. The government provides no equipment or vehicles.
1.2 Government-Furnished Training. Government-provided training shall be identified and provided by the unit (i.e., flight line driving certification), and per section 4.2 of the PWS. All documentation will be kept by the CO or authorized representative.
1.3 Manufacturer’s Information. The government shall provide available manufacturer's information related to aircraft sunshades; however, the contractor is ultimately responsible for care and maintenance of the aircraft sunshades.
SECTION D
GENERAL INFORMATION
1.0 TRANSITION.
1.1 Assuming Functional Responsibility. Assume responsibility for all executable functions, identified in the PWS IAW the contractor’s Transition/Phase-In Plan and Phase-Out Plan.
1.2 Access to Facilities. The contractor shall be allowed access to government facilities after the transition start date. Access shall not interfere with the work efforts of current contractor or government personnel. The CO shall arrange access to ensure interference does not occur. The contractor shall be able to familiarize personnel with aircraft sunshades.
1.3 Phase-In Plan. Submit a final Phase-In Plan to the CO NLT 15 business days after contract award. Changes shall be limited to unforeseen conditions that occur prior to transition start.
1.4 Joint Inspection.
1.4.1 Aircraft Sunshade. The contractor and CO appointed government representative shall conduct a joint inventory of all aircraft sunshades before contract start.
1.5 Existing Conditions. Identify substandard conditions or incomplete work to include, but not limited to, environmental, safety, health, equipment, and maintenance condition per individual aircraft sunshade. This documentation shall be submitted to the Creech Aircraft Sunshade
Manager(s) within 30 calendar days of contract award, and shall be in the same format as the
Inspection Report, in Appendix D.
1.6 Phase-Out Plan. Submit a Phase-Out Plan for contract completion tasks when directed by the CO. The requirements for the plan shall be detailed in CO tasking letter.
2.0 CONTRACTOR PERSONNEL.
2.1 Contractor Employees. The contractor shall not employ persons identified by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation or its populace.
2.1.1 National Agency Checks (NAC). Perform a credit check (utilizing commercial background and investigate entities) on all employees requiring a NAC. The results of the background and credit check shall accompany all NAC applications. Employees with unfavorable background or credit history may be denied a favorable NAC. In addition, a favorable/adjudicated NAC is considered a condition of employment. The contractor shall ensure employees that are denied a favorable NAC and/or security clearance are not working under this contract, due to the sensitive environment/location of the work being performed.
2.1.3 Laws, Directives, and Regulations. Comply with the laws, regulations, and directives of the appropriate Major Command (MAJCOM).
2.1.4 Terminations. Remove employees identified as potential threat to the health, safety, security, general well-being or operational mission of the installation or its population, or failure to comply with laws, regulations, and directives of the appropriate MAJCOM.
2.1.5 Conflict of Interests. Do not employ any person who is an employee of the government if the employment of that person would create a conflict of interest, or the appearance of a conflict of interest.
2.2 Employee Training. Develop, implement, and maintain procedures for training, qualifying, and certifying employees prior to performance of assigned duties under this contract (i.e., welding, electrical, etc.). Formulate and provide comprehensive training, qualification, and certification procedures for its employees for submission with the QCP.
2.2.1 Records. Develop and maintain individual training records to document training and test results. Document all initial and supplemental training accomplished in each employee’s training record. Maintain each training record at the individual’s work location and make available to government representative(s) upon request.
3.0 HOURS OF OPERATION.
3.1 Duty Hours. Provide required resources during normal duty hours. Duty hours will be 07:00
A.M. to 4:00 P.M. When/if extended/alternate hours are needed then coordination/approval must be obtained from the Creech Aircraft Sunshade Manager.
3.2 Holidays. If the holiday falls on a Saturday or Sunday, it may be observed on Friday or
Monday as directed. U.S. holidays include (per local base-level procedures):
New Year's Day
Martin Luther King Jr. Day
Presidents Day
Memorial Day
Juneteenth National Independence Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving
Christmas
3.3 Additional Down-days: Additional down days may be directed by higher headquarters. The
Creech Aircraft Sunshade Managers will notify the contractor of these unavailable days as the information becomes available.
////////////////////////////////////////////////END OF DOCUMENT///////////////////////////////////////////////////
APPENDIX A
DEFINITIONS
Configuration Management – physical attributes or characteristics. Installation of original hardware/equipment.
Corrosion – the electrochemical oxidation of metals in reaction with an oxidant such as oxygen.
Can occur in any environment.
Creech Sunshade Manager – The sunshade manager overseeing sunshades located at Creech
AFB.
Fatigue – the progressive and localized structural damage that occurs when a material is subjected to cyclic loading.
Fracture – the (local) separation of an object or material into two, or more, pieces under the action of stress.
Fraying – to strain; chafe. To wear away (the edges of fabric, for example) by rubbing. To become worn away or tattered along the edges. A frayed or threadbare spot, as on fabric.
Hardware – a general term for items such as fasteners, bolts, washers, wire, turn buckles, etc.
Performance Work Statement (PWS) – specifies the government's requirements for services to be performed.
Serviceable – safe for use and discrepancies do not pose a hazard to personnel, equipment and/or aircraft. Unit can expand upon specifics for this definition.
Structural Failure – loss of the load-carrying capacity below manufacturer’s design. Can refer to a component or member within a structure or of the structure itself.
Unserviceable – presents a danger to personnel, equipment and/or aircraft. Unit can expand upon specifics for this definition.
Wear – erosion or sideways displacement of material from its "derivative" and original position on a solid surface performed by the action of another surface. Wear is related to interactions between surfaces and more specifically the removal and deformation of material on a surface as a result of mechanical action of the opposite surface.
APPENDIX B
DELIVERABLES
DELIVERABLE PWS REFERENCE DUE DATE
Preventative Maintenance
Plan (PMP)
Maintenance Documentation
Work Schedules
Quality Control Plan (QCP)
Phase-In Plan
Phase-Out Plan
Section A.2.1.2
Section A.2.2.1
Section A.2.3.3.1
Section A.5.1
Section D.1.3
Section D.1.6
60 days after contract award
Quarterly
NLT 30 calendar days before work is scheduled
45 calendar days after contract award
15 business days after contract award
Per CO request
APPENDIX C
MAINTENANCE DOCUMENTATION
Aircraft Sunshade Maintenance Documentation Sheet Shelter
Spot #
Date
Inspected
Discrepancy Corrective Action/ Corrosion Control Actions/
Contractor Repair Needed
ECD Repair
Cost/Estimate
APPENDIX D
INSPECTION REPORT
Aircraft Sunshade Maintenance Documentation Sheet Shelter
Spot #
Date
Inspected
Discrepancy Corrective Action/ Corrosion Control Actions/
Contractor Repair Needed
ECD Repair
Cost/Estimate
ATTACHMENT 1
AIRCRAFT SUNSHADE INSPECTION CHECKLIST
1. Minimum Inspection Criteria. Physically inspect for and correct discrepancies as necessary for the following items outlined by AFI 21-101_ACCSUP:
1.1 Structural Supports for signs of corrosion, excessive movement, cracking or damage; lateral bracing for signs of corrosion, loosening, cracking, missing hardware, or fatigue damage, particularly at the connections; structural anchorage for signs of loosening and cracking around anchorage points on apron.
1.2 Foreign Object, cleanliness and serviceability of installed safety markings.
1.3 Lighting (if installed) for security and serviceability.
1.4 Electrical system equipment, including electrical panels, receptacles, lighting systems, solar panels and conduit (if installed) for security and serviceability.
1.5 Inspect all columns, beams, joists, girders, and lateral cross bracing for proper connections, faulty/cracked welds, loose, or missing bolts, and corrosion.
1.6. Inspect turnbuckles and cables for severe corrosion, fraying or breaks, tightness, proper connection, and security.
1.7 Inspect for loose/missing and damaged attaching hardware.
1.8 Inspect anchor plate attachment bolts for embedment, tightness, and severe corrosion.
1.9 Inspect anchor plate for levelness (i.e., ensure it is flat on the ground).
1.10 Inspect concrete around all anchor plates for cracking/spalling.
1.11 Metal Roofing (if equipped):
1.11.1 Inspect roof panels and fasteners for security.
1.11.2 Inspect for loose/missing and damaged attaching hardware.
1.11.3 Inspect metal roof for severe corrosion.
1.12 Fabric/Canvas roofing (if equipped):
1.12.1 Inspect fabric for proper tightness.
1.12.2 Inspect all bolts, nuts, cables, and lacing.
1.12.3 Inspect all fabric for holes, tears, scuffs, or scrapes.
1.13 Miscellaneous:
1.13.1 If installed, inspect gutters to ensure they are securely fastened.
1.13.2 If equipped, inspect bird netting and fasteners for security.
1.13.3 Ensure inspections are accomplished following unique weather events such as high winds, heavy snow, or icing conditions.
File details come from the government source that posted it. Updated .