Attachment 2 - Statemt of Work (SOW).pdf
PDF 404 KB Posted
- Solicitation number
- 70Z03826QE0000004
About this file
This Statement of Work (SOW) details a United States Coast Guard (USCG) contract for Aircraft Jacks Teardown, Test, and Evaluation. The contract involves testing and potentially repairing multiple types of hydraulic and aircraft jacks with various national stock numbers and part numbers. The USCG will provide 78 total jacks for inspection, with contractors required to perform visual and functional inspections, determine if items are Ready for Issue (RFI) or Beyond Economical Repair (BER), and submit detailed repair quotations when applicable.
Key contract requirements include a 15-calendar day turnaround for initial test and evaluation, with 120-day turnaround for repairs once evaluation is complete. Contractors must be ISO 9001-2000 or AS9100 certified, provide comprehensive documentation including Component Repair Records, and follow strict packaging and shipping guidelines. The items will be shipped to the USCG Aviation Logistics Center in Elizabeth City, NC, with electronic invoicing encouraged. Payments will be made electronically, with invoices submittable five days after shipment, contingent on full item receipting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Terms and Conditions.pdf | ||
| Attachment 4 - Justification for Other than full and Open.pdf | ||
| Attachment 1- Schedule of Services.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Aircraft Jacks – Teardown, Test, and Evaluation
Attachment 2
Contractor Requirements
Teardown, Test and Evaluation (TT&E)
1. The United States Coast Guard (USCG) will furnish the items and quantities specified in the following table for TT&E during base period and any option year period:
Description Quantity National Stock Number Part Number Jack, Hydraulic 6 1730-01-060-4329 2979-010 Jack, Hydraulic 6 1730-00-516-2019 50J25178 Jack, Aircraft 12 1730-00-540-2343 53D22020 Jack, Aircraft 6 1730-00-516-2017 53J6268 Jack, Aircraft 12 1730-01-541-3186 9775-010 Jack, Tripod 6 1730-01-162-9308 16860
Jack, Aircraft 12 1730-01-013-4185 8704-010 Jack, Aircraft 12 1730-00-201-4849 CJ69J1270 Jack, Aircraft 12 1730-00-203-4697 53D22004
2. If, after visual and functional inspections, an item is found to meet manufacturer's minimum performance specifications and is considered to be Ready for Issue (RFI) or is considered to be Beyond Economical Repair (BER), the contractor will be allowed the firm fixed price for test and evaluation only. The contractor shall prepare a failure data report In Accordance With (IAW) Section 15 in these instances. This report shall be included with the returned component. The parts shall be marked "RFI” or “BER” and returned to the Aviation Logistics Center (ALC) as is.
3. If an item can be repaired, the Contractor shall submit a quotation for the repair to the Contracting Officer. The quotation shall be valid for thirty (30) days and shall include the following:
Description of each discrepancy found.
Number of man-hours per discipline required to complete each discrepancy.
Parts costs Total dollar amount for each discrepancy.
Total dollar amount for complete list of discrepancies.
Estimated repair turnaround time.
Contract Number / Task Order Number and applicable Line Item.
4. The Contracting Officer will be responsible for reviewing the list of discrepancies and either accept, negotiate or decline the contractor’s proposal. The Contracting Officer shall provide a response to the quotation within thirty (30) business days after receipt. Additional work shall not be performed until the quotation is accepted and a modification to the purchase order is provided by the Contracting Officer. The contractor will have turnaround time quoted for repair (plus the number of calendar days it takes the Contracting Officer to provide a response to the over and above quotation) to complete the repairs and return the items to the Government. In the event that a quotation is declined by the Contracting Officer, the contractor shall return the item “As-Is”. The contractor will be authorized the firm-fixed Test and Evaluation fees established in the order for items returned “As-Is”
Repair
1. Non-RFI jacks shall be repaired and returned to RFI condition IAW the Original Equipment
Manufacturer (OEM) minimum functional performance specifications this shall include, but is not limited to, replacement of missing or broken parts and the removal of any foreign matter or corrosion.
2. During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected.
Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part. Corrosion removal and treatment of affected areas will be accomplished IAW OEM specifications.
3. Work under this purchase order shall be performed at the contractor’s facility or USCG approved facility. The contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and repair the components listed in this purchase order at the firm-fixed prices listed in the schedule (or modification). The contractor shall perform all repairs IAW applicable OEM’s Component Maintenance Manuals (CMMs), other repair specifications in lieu of an applicable CMM, and/or applicable test/acceptance criteria. Any deviations must be approved by the USCG.
4. The contractor must have access to required CMMs, repair specifications and/or test/acceptance criteria and any other required data to ensure all components are tested and repaired IAW the OEM’s current specifications and procedures. The USCG may review repair manuals and performance/test/ acceptance criteria as required. Original design or functional capabilities of the end item and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.
5. The Contractor must have access to all applicable documents and obtain current editions of all applicable documents. The USCG does not own nor can it provide the technical documents specified herein. Neither the closing date for receipt of offers nor contract award will be delayed pending receipt of these documents for any offeror.
6. Parts of a component found to be in a serviceable condition as a result of functional testing shall be reused. Missing parts and parts found to be defective or that require replacement by manufacturer’s instructions shall be replaced with parts meeting the manufacturer’s specifications and drawings or as otherwise authorized in writing by the Contracting Officer. Replacement parts shall be new and accompanied with OEM traceability. The cost for parts that are replaced systematically during repair shall be included in the price listed in the schedule for these operations.
7. Jacks received which indicate obvious misuse or cannibalization may dictate an exclusion from the prices specified in the contract schedule. Such jacks shall be inspected, repair costs determined, and authorization to proceed obtained from the Contracting Officer prior to commencement of work. Once notified of a possible exclusion, The Contracting Officer will make a written determination within thirty (30) days as to exclusion validity. The Contracting Office may approve the quote, decline the quote and have the item returned as-is, or consider the item BER.
8. The USCG typically considers an item BER when the cost to repair exceeds 60 percent of the price of a new unit; however, the USCG is not bound by that number and will make all final BER determinations. The USCG will provide disposition instructions (either to scrap the item at the contractor’s facility or to return the item to ALC) for all items that are considered BER. The contractor shall not dispose of an item until they have been notified by a written modification to the order. When returning the item to ALC, the items shall be clearly marked as “BER” with the supporting evidence.
9. The Government shall not be liable for any amount expended by the contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the Contracting Officer.
10. The contractor shall submit a failure data report for each repaired jack. This report shall include
NSN, Part Number, Serial Number, nomenclature, date of repair, contract delivery order number, line item number, description of repaired failure, a listing of parts repaired and a listing of parts replaced. The contractor’s in-house work order may be used to satisfy this requirement if it includes the information requested above. This report shall be attached to the packing slip and shipped with the repaired component.
11. The contractor is required to be certified and maintain a quality system that complies with the requirements of ISO 9001-2000 Quality Management Systems – Requirements, AS9100, or equivalent. The contractor is responsible for performing or assuring all inspections, tests and calibration necessary to substantiate that the goods or services furnished conform to Government’s requirements. The contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements. Records of conformance shall be maintained on file at the contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at contractor’s facility to verify the existence, adequacy and effectiveness of the quality system. Upon request of the Government, the contractor(s) shall forward a copy of their current certification and Quality Assurance Manual for review.
12. ALC considers components ready for issue (RFI) upon acceptance. Components determined to be non-RFI upon installation may be returned to the contractor with deficiencies described in a Product Quality Deficiency Report (PQDR).
13. Ensure a placard or permanent tag is affixed to each jack notating the date the jack was proof-load tested, has Jack P/N on it and at what poundage the jack was tested at per the Navair Manual.
Certifications
1. When checked the Contractor shall:
The COC shall be signed by an authorized official of the approved source and must specify the nomenclature, manufacturer's part number and date of manufacture. For Production Approval Holder, a COC AND a copy of the FAA Parts Manufacturer Approval (PMA) or other manufacturing authority shall be provided. Contractors shall also provide documentation reflecting the complete unbroken history of ownership of the parts from purchase from the approved manufacturing source until delivery to the USCG.
Tracked Items
When checked the contractor shall comply with the following documentation requirements:
The components to be repaired under this Purchase Order are tracked in the USCG’s
Asset Computerized Maintenance System (ACMS). ACMS is the management information system used to schedule and record all USCG equipment maintenance actions and calibration intervals.
Tracked components will be shipped to the contractor with a Significant Component History Report (SCHR). The SCHR records the maintenance history of the serial number tracked components. It remains with its corresponding part until reinstalled on an aircraft or is annotated “BER” and scrapped.
(NOTE: written approval from the Contracting Officer is required prior to scrapping a serial number tracked component). The SCHR for scrapped components shall be returned with the component. The Contractor shall retain a copy of the SCHR for 90 calendar days.
The Contractor shall provide a Component Repair Record (CRR) with the repaired components. The CRR records the maintenance performed on a serial number tracked component and enrolls or dis-enrolls components from ACMS when those components are scrapped, added to, or removed from the USCG inventory. At a minimum, the CRR shall identify the equipment and contain a description of the maintenance action performed, parts replaced, service bulletins and modifications. The Contractor shall mail one (1) copy of the CRR to USCG ALC, ATTN: Aviation Engineering (AVENG) /ACMS, Elizabeth City, NC 27909-5001 no later than five (5) business days following completion of the rework effort. The original CRR shall be packed with the component. The Contractor shall retain a copy of each CRR for 90 calendar days. The Contractor may request that their in-house work order be accepted to fulfill the CRR requirement. The Contracting Officer will provide a written determination in response to the request.
Contract Requirements
1. The following table shows the required delivery for each priced line item listed in the schedule. Early deliveries, when appropriate, are desired and acceptable.
Line Item Item Description
Due No Later Than:
0001 thru
Test and Evaluation
Fifteen (15) calendar days after receipt of components
0010 Repair All items require 120-Day turn around once the evaluation has been completed. Early deliveries are accepted.
2. Items shall be shipped to the following address:
USCG Aviation Logistics Center Receiving Section, Bldg. 63 1664 Weeksville Road Elizabeth City, NC 27909-5001 Contract Number / Task Order Number
3. The F.O.B. point for shipments under this contract is F.O.B. Destination. Prices in the schedule include all applicable customs, duties, taxes and shipping charges; therefore, no additional charges for shipping will be allowed unless indicated by a bilateral modification to the order.
4. RFI Components shall be shipped in compliance with the applicable military standards that apply to the type of part being shipped. All shipping containers/packages shall be marked for delivery IAW the contract or delivery order. All components, which require special care during packing, handling or shipping shall be identified and marked appropriately. The exterior of the package or shipping container shall be legibly marked with the following information in such a manner that the marking shall not be rendered illegible when opened.
NSN
Part Number Nomenclature Serial Number Contract Number / Task Order Number Contractor’s Name and Address
5. Packaging and preservation shall include the following information:
The USCG Aviation Logistics Center (ALC) is a supply depot; therefore, material will be stored and transshipped to various users. The container shall be packed and labeled suitable for shipment via land, air, or sea. Packaging material shall NOT consist of the following:
popcorn, shredded paper, Styrofoam of any type, or peanut packaging.
Each part shall be individually packed in a separate envelope, box, carton or crate.
For bulk packages, packaging of material up to 100 each per package is acceptable.
Each individual container shall be labeled on the inside with the NSN, Part Number, Serial
Number, Quantity, Nomenclature, Purchase Order Number, and Purchase Order Line Item Number.
Packing List and Certification/Documentation shall be placed on the outside of individual containers.
The internal packing material shall be sufficient to prevent damage during shipment, handling and storage. Preservation and protection shall be provided to prevent corrosion, deterioration or decay during warehouse storage for a period of one year.
6. Inspection and acceptance of material under this contract, to ensure that equipment is in accordance with manufacturer's specifications, shall be performed at destination by local USCG personnel and consist of count and condition only. NOTE: All serial number tracked items will be inspected and accepted by local USCG Quality Assurance personnel. Full and clear traceability must be provided with delivery of each part. If full and clear traceability is not provided, ALC will not accept delivery of the part and invoicing may not be approved for payment.
7. The contractor’s invoice shall be submitted IAW FAR 52.212-4 to the designated billing office for payment as noted below. The Contractor is HIGHLY encouraged to submit invoices electronically to ALC-Fiscal@uscg.mil.
Chief, Fiscal Branch
USCG ALC
Fiscal Branch, Bldg. 63 1664 Weeksville Road Elizabeth City, NC 27909 Contract Number / Task Order Number
8. All payments will be made electronically IAW FAR 52.232-33. The contractor may submit invoice five (5) days after shipment of items. The invoice will not be approved until all items have been receipted.
File details come from the government source that posted it. Updated .