Attachment 2- Statement of Work-Specification.pdf

PDF 912 KB Posted

Attached to
Deck Preservation and Deck Covering Renewal Federal contract opportunity
Solicitation number
70Z080-23-R-MECP0001
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to Deck Preservation and Deck Covering Renewal, newest first.
File Type Posted
Amendment 0002.pdf PDF
Statement of Work-Specification-Rev1.pdf PDF
Amendment 0001.pdf PDF
Attachment 1- Price Schedule.xlsx XLSX spreadsheet
70Z08023RMECP0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC MEDIUM ENDURANCE CUTTERS (WMEC 210/270)

SPECIFICATION FOR DOCKSIDE DECK PRESERVATION AND DECK COVERING

RENEWAL

BASE YEAR FY2023

Developed By: Brett M. Gardner

Surface Forces Logistics Center, MECPL SES

(Rev-0, 08 August 2022)

DOCKSIDE DECK PRESERVATION AND DECK COVERING RENEWAL – FY2023

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ........................................................................................... vii Principal Characteristics ............................................................................................................................ viii General Requirements WORK ITEM 1: Decks, Helicopter Operating Areas, Preserve (WMEC 210) WORK ITEM 2: Decks, Helicopter Operating Areas, Preserve (WMEC 270) WORK ITEM 3: Fantail Deck, Preserve (WMEC 210) WORK ITEM 4: Fantail Deck, Preserve (WMEC 270) WORK ITEM 5: Forecastle Weather Deck, Preserve (WMEC 210) WORK ITEM 6: Forecastle Weather Deck, Preserve (WMEC 270) WORK ITEM 7: Weather Deck, Preserve (WMEC 210) WORK ITEM 8: Weather Deck, Preserve (WMEC 270) WORK ITEM 9: One-Step Epoxy Deck Covering, Renew (WMEC 210) WORK ITEM 10: One-Step Epoxy Deck Covering, Renew (WMEC 270) WORK ITEM 11: Quarry Tile Deck Covering, Renew (WMEC 210) WORK ITEM 12: Quarry Tile Deck Covering, Renew (WMEC 270) WORK ITEM 13: Electrical Grade Sheet (Dielectric) Deck Covering, Renew (WMEC 210) WORK ITEM 14: Electrical Grade Sheet (Dielectric) Deck Covering, Renew (WMEC 270) WORK ITEM 15: Carpeting Deck Covering, Renew (WMEC 210) WORK ITEM 16: Carpeting Deck Covering, Renew (WMEC 270) iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 618 WMEC 601-003, Rev J, General Arrangement-2nd and 3rd Decks

Coast Guard Drawing 618 WMEC 601-004, Rev K, General Arrangement Main & 01 Deck

Coast Guard Drawing 618 WMEC 601-005, Rev J, General Arrangement 02 Dk, Bridge Dk, & House

Top

Coast Guard Drawing 618 WMEC 634-001, Rev G, Deck Coverings

Coast Guard Drawing 627 WMEC 601-003, Rev E, General Arrangement-2nd and 3rd Decks

Coast Guard Drawing 627 WMEC 601-004, Rev D, General Arrangement Main & 01 Deck

Coast Guard Drawing 627 WMEC 601-005, Rev F, General Arrangement – 02 Dk, Bridge Dk, & House

Top

Coast Guard Drawing 627 WMEC 634-001, Rev D, Deck Coverings

Coast Guard Drawing 901 WMEC 634-001, Rev G, Deck Covering Schedule

Coast Guard Drawing 901 WMEC 801-003, Rev L, General Arrangement 02/Pilothouse & Above

Coast Guard Drawing 901 WMEC 801-004, Rev J, General Arrangement 01 Level

Coast Guard Drawing 901 WMEC 801-005, Rev K, General Arrangement Main Deck

Coast Guard Drawing 905 WMEC 634-001, Rev D, Deck Covering Schedule

Coast Guard Drawing 905 WMEC 801-003, Rev H, General Arrangement 02/Pilothouse & Above

Coast Guard Drawing 905 WMEC 801-004, Rev F, General Arrangement 01 Level

Coast Guard Drawing 905 WMEC 801-005, Rev F, General Arrangement Main Deck

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Sept 2020, Coatings and Colors

Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2020, Install Interior

Deck Covering Systems v (Rev-0)

OTHER REFERENCES

MIL-PRF-24613A, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric

MIL-PRF-24667C, March 2018, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering

Application

Naval Air Warfare Center (NAVAIR) Drawing 621055, Rev F, Visual Landing Aids Installation WMEC-

270 Class Ships

Naval Air Warfare Center (NAVAIR) Drawing 626348, Rev C, Visual Landing Aids Installation WMEC-

210 Class Ships

QPL-24667, April 2021, Qualified Product List (Military) of Products Qualified Under Detail

Specification MIL-PRF-24667, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering

Application vi (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

This section is not applicable to this package.

vii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4

(Inspection report particulars)):

Work

Item Title viii (Rev-0)

PRINCIPAL CHARACTERISTICS

1 (Rev-0)

00000_0521_FLT

REC_00000_FLT_Dockside (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting Vessel repairs performed for assets by Commercial Contractor at CG Facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Sept 2020, Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.1.1 NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents. Contractors can apply to NAVSEA headquarters directly for copies.

3.2 Contractor-provided fire extinguishers. The Contractor must provide portable fire extinguishers.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurements” for coating thickness is defined as follows:

SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5 inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3 (Rev-0)

3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC

Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable

Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility will be provided as necessary for each Coast Guard facility where work is to be performed.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor must be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, and must be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste

Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the

Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the

Environmental Records binder and required documentation, including environmental permits compliance and close-out.

4 (Rev-0)

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For

Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor must be aware of the following:

3.5.6.1 No Contractor or Subcontractor may sign a Hazardous Waste Manifest using the Coast Guard facility’s

EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without

COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. The Contractor must refer to site (e.g. Base) Regulations and Instructions for details regarding local policies (e.g. crane services, parking, or facility usage).

3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 8636. Add missing paragraphs between 3.2 and 3.5 of Std Spec 8636 as follows:

“3.3 Access cut boundaries. The Contractor shall ensure that access cuts comply with the requirements and restrictions detailed in the following and in SFLC Std Spec 0740, and referenced codes.

3.3.1 Location of boundaries. Boundaries of access cuts and closure plates shall, in general, be located between principal ship framing, bulkheads, and other structural members and shall be at least three inches from any of these members or from the toes of other welds. A reduction in this three inch minimum may be approved by the

KO on a case by case basis provided sufficient clearance is maintained for welding and inspection requirements.

The boundaries of access cuts and closure plates should land on existing butts or seams, wherever practicable. The boundaries of prior access cuts should be utilized wherever possible. Boundaries may extend across one or more frames as required for the size of the opening.

3.3.2 Access hole dimensions and arrangements. Holes or access cuts shall be the minimum size necessary and shall be in accordance with the following:

Rectangular access cuts and closure plates welded into primary hull structure shall be at least 12 inches wide in the lesser dimension.

For circular access cuts, the minimum diameter shall be 4T, where T = thickness of the involved structural member, but not less than three inches.

Circular closure plates for access cuts less than two feet in diameter shall be dished 1/16 to 1/8 inch to allow for shrinkage when welded.

Corners of rectangular access cuts and closure plates shall have a minimum radius of 6 inches except when a boundary lands on an existing hull longitudinal seam or transverse butt weld.

Corners at an existing seam or butt shall intersect at a 90 degree angle.

Cuts that are to cross existing butts or seams shall do so at an angle of 90 degrees plus or minus 15 degrees.

5 (Rev-0)

In primary hull structure, existing welds forming the boundary of a cut shall be cut back 3 inches beyond the toe of the access cut, except that the cut back shall not intersect or cross an existing weld, frame, or structural member. In which case, the cut back may be reduced to a minimum of two inches in length.

Existing welds crossed by the cut shall not be cut back.

3.3.3 Primary hull structure. Primary Hull Structure includes the shell, main strength decks, principal longitudinal bulkheads, vertical keel, deep web girders and stiffeners designed to withstand the ship bending stress.

3.3.4 Mechanically fastened joints. Welding closer than six inches to a mechanically fastened joint should be avoided. When access cuts cross or come within six inches of a mechanically fastened joint, the fasteners shall be checked for tightness and if necessary, loose fasteners shall be seal welded or removed, and replaced for a distance of 6 inches beyond the edge of the cut. When a cut crosses a mechanically fastened seam the cut plates shall be repaired using single V welds backed with glass tape (MIL-C-20079) to prevent fusion between the mechanically fastened plates.

3.4 Ship integrity maintenance. The Contractor shall maintain safety and ship integrity by installing temporary guarding and coaming, in addition to weathertight and watertight closures. Remove these temporary fabrications after closing the hull access, and grind surfaces flush in way of removals. For shell plating cuts made at or below the waterline where temporary closures are impractical, the Contractor shall secure each vulnerable compartment and subdivision to minimize potential damage to the extent permitted by the scope and urgency of the work.

3.4.1 Guarding. Install temporary guards in accordance with 29 CFR 1915.73.

3.4.2 Coaming. Ensure that in areas where flammable liquids may be stored, a 4 inch high metal coaming shall be installed on the surface of the deck with tack welds and fully sealed with caulking compound. The coaming shall encircle the access cut in the deck.

3.4.3 Weathertight and contamination closures. Fabricate temporary closures, using fire retardant material, before cutting access openings and install closures whenever access is not in use. Closures shall be:

Constructed to protect the access from inclement weather and entry of contaminants (shall include a coaming or dam on the deck to redirect rain runoff away from the opening).

Fitted with fasteners that permit rapid installation and removal.

Able to support a minimum of 150 pounds per square foot for horizontal deck closures.

Where the access opening is in way of a removed hatch, scuttle or door, the closure shall be configured to allow normal passage of ship’s personnel and equipment.

3.4.4 Watertight closures. Ensure that access openings created four feet or less above the maximum anticipated waterline shall include temporary watertight closures when the vessel is waterborne.

NOTE

NAVSEA S0600-AA-PRO-160/CH16 provides requirements for design, fabrication, and installation of temporary watertight closures.”

6 (Rev-0)

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

7 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

8 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

9 (Rev-0)

QA-3A - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

TIME

10 (Rev-0)

QA-3B - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading

(mils)

Mean Reading (mils) IAW ASTM DD4417).

11 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

12 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK ITEM

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic

Pull-Off (Type I/Banana) Gauge Is

Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

13 (Rev-0)

63120_DksHeloOps_0822_FLT

REC_63120_DksHeloOps_FLT_210' WMEC Class (ALL) (0822)

WORK ITEM 1: Decks, Helicopter Operating Areas, Preserve (WMEC 210)

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve the Helicopter

Operating (HELO Ops)/Flight Deck and adjacent areas (see 4.1 (Definition of HELO Ops Areas)).

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 618 WMEC 601-004, Rev K, General Arrangement – Main & 01 Deck

Coast Guard Drawing 627 WMEC 601-004, Rev D, General Arrangement – Main & 01 Deck

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

OTHER REFERENCES

MIL-PRF-24667C, March 2018, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering

Application

Naval Air Warfare Center (NAVAIR) Drawing 626348, Rev C, Visual Landing Aids Installation

WMEC-210 Class Ships

NAVSEA Standard Item 009-32, FY-22 CH-1, Feb 2021, Cleaning and Painting Requirements;

Accomplish

QPL-24667, April 2021, Qualified Product List (Military) of Products Qualified Under Detail

Specification MIL-PRF-24667, Coating System, Non-Skid, for Roll, Spray, or Self-

Adhering Application

The Society for Protective Coatings (SSPC)/NACE International (NACE), Joint Surface

Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP

11), 2020, Power Tool Cleaning to Bare Metal

14 (Rev-0)

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Flight deck safety net assemblies.

Talon grid cover.

Flight deck landing lights.

Deck drain gratings.

3.2 Visual Landing Aid (VLA) and safety marking sketch. Prior to commencing surface preparation tasks, the Contractor must develop and submit, to the COR, a sketch of all existing Flight Deck VLA and safety markings and their measured locations on the Flight Deck, using NAVAIR Drawing 626348 as guidance.

Obtain Coast Guard Inspector approval of the sketch, prior to applying new marking paint (see 3.6.4

(VLA and safety markings)).

3.3 Containment and ambient condition control. For exterior surface preservation, the Contractor must provide suitable fully-enclosed tenting for the purpose of maintaining satisfactory environmental conditions and containing generated dust, paint chips, and spent abrasives. Additionally, the Contractor must provide any and all equipment necessary to control the ambient conditions, throughout the entire surface preparation and preservation processes, satisfying the requirements specified in SFLC Std Spec

6310, Section 3 (Requirements) to include the recommended conditions provided by the coating system’s manufacturer. Equipment may include, but is not limited to:

A/C system

Heaters

Blowers

Dehumidifiers

3.4 Polyurethane coatings. The Contractor must be aware that two-part polyurethane primers, membranes, color toppings, and non-skid are not authorized for application on Coast Guard vessels, even if listed on

QPL-24667.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

15 (Rev-0)

3.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.6 Preservation requirements. The Contractor must prepare and coat the deck surfaces designated in paragraph 1.1 (Intent), using the system specified in Table 1. Non-skid systems (primer, non-skid topcoat, and color topping) must be installed in accordance with NAVSEA Standard Item 009-32 for Flight Deck

Certification. Ensure that the system is qualified as “UV/LSA”, as designated on QPL-24667.

TABLE 1 - FLIGHT DECK COATING SYSTEM

EXTERIOR

SURFACES TO

BE PRESERVED

SURFACE PREPARATION /

(ANCHOR PROFILE IN MILS)

COATING SYSTEM DFT (MILS) NOTES

Flight Deck SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 /

(3.0-6.0)

1) One Full Coat Primer

MIL-PRF-24667 Type I, Comp. G

2) Stripe Coat MIL-PRF-

24667 Type I, Comp. G

3) One Full Coat Primer

MIL-PRF-24667 Type I, Comp. G

4) One Coat Non-Skid

MIL-PRF-24667 Type I, Comp. G

Follow Manuf.

Instructions

1, 2, 3, 4,5

1. Color coating flight decks for other than required markings is not authorized. Non-skid material is rolled on over primer within 48 hours for best adhesion.

2. Power tool cleaning to bare metal (SSPC-SP 11) may be used in areas that cannot be accessed by abrasive blasting.

3. Waterjetting may be used only as a means of coating removal. Final surface preparation must be via abrasive blasting to the standard specified in Table 1.

4. Recyclable encapsulated abrasive media, such as Sponge-Jet, may not be used.

5. Flight decks are constructed of High Yield (HY) steel and must not be heated to remove the existing coating.

3.6.1 The Flight Deck coating system must be procured as a qualified system conforming to MIL-PRF-

24667 containing the following:

Anti-corrosive/primer coating.

Dark grey color (36076) non-skid top coating.

Dark grey color (36076) finish coating, for non-skid exempted areas.

White finish color (37875) coating, for VLA and safety markings.

3.6.2 Substrate inspection. After completion surface preparation and before application of primer coat, the

Contractor must perform a visual inspection of the prepared substrate; submit a CFR.

3.6.3 Non-skid exempted areas. Apply top/finish coating, in lieu of non-skid top-coating over the following non-skid-exempted areas:

Deck fittings, including, but not limited to: pad eyes, label plates, net supports/foundation, helicopter tie-down fittings, and lifting handles for aircraft fuel filling station.

Areas within two inches of deck fittings and protrusions.

Areas within six inches of adjacent bulkheads, deck coaming, and deck edges.

Waterways.

16 (Rev-0)

3.6.4 VLA and safety markings. The Contractor must accomplish the following tasks:

3.6.4.1 Remove Flight Deck landing lights in way of work. Visually inspect light assemblies and submit

CFR. Prepare and preserve light assemblies to match existing in accordance with SFLC Std Spec 6310.

Reinstall light assemblies to original configuration.

3.6.4.2 Stripe the Flight Deck with the same pattern sketched prior to surface preparation.

3.6.4.3 Paint new VLA and safety markings with a White color (37875) finish coating.

3.7 Low temperature cure system. If a Change Request has been authorized and released, the Contractor may apply a legacy low temperature cure system, conforming to MIL-PRF-24667 Type VIII, Composition G.

NOTE

The low temperature system is only authorized for application at temperatures between 35-45 degrees F.

3.8 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

NOTE

Surfaces being preserved are considered “critical-coated surfaces”.

3.9 Non-skid surface appearance and texture. The Contractor must ensure the non-skid surface shows a pattern of peaks and ridges. The ridge profile must be continuous and reasonably uniform. Peaks and ridges must be generally in the same direction (fore and aft), approximately 1/2 to 1 inch apart, and approximately 1/16 to 3/32 inches high. Aggregate must present a rough uniformly coarse appearance over the entire surface with no loosely bound clumps of particles. All weld seams must be cross-rolled from a minimum of 3 inches on either side of the weld.

3.10 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

4. NOTES

4.1 Definition of “HELO Ops Areas”/Flight Deck. “HELO Ops Areas” are defined as exterior 01 Level deck surfaces from Fame 59 aft, port and starboard,, as shown on Coast Guard Drawing 627 WMEC 601-

004, including boat decks, helicopter tie-down fittings, 01 Deck perimeter coaming, talon grid cover, raised “mushroom” type tie-down fittings, line-up light fixtures, flight deck net supports/foundations, and up to six inches on all adjacent vertical surfaces, where applicable.

4.2 Certification hot line action desk. The Naval Air Warfare Center Aircraft Division Lakehurst has the responsibility for inspection and certification of all air capable aviation ships which support and operate with helicopters. A Shipboard Aviation Facility hot line action desk has been established at the Naval Air

Warfare Center Aircraft Division Lakehurst, to provide a central point of contact for obtaining all

17 (Rev-0) information pertinent inspection and certification issues, including VLA and safety markings. The hot line action desk is in operation 24 hours a day and can be reached by contacting:

NAVAIRWARCENACDIVLKE

Lakehurst, N.J 08733-5000

Hot Line Action Desk (4.8.2.5)

Phone: (732) 323-2592

4.3 Unit’s responsibilities. The ship's force will be responsible for the following:

Removing and reinstalling all deck drain gratings.

Plugging deck drains.

Ensuring there is no engine operation and no stack emissions at any time during flight deck resurfacing.

Restricting access to the Flight Deck work area to only authorized personnel.

Contacting NAVAIR for inspection and certification of flight deck markings following work.

18 (Rev-0)

63120_DksHeloOps_0822_FLT

REC_63120_DksHeloOps_FLT_270' WMEC Class (ALL) (0822)

WORK ITEM 2: Decks, Helicopter Operating Areas, Preserve (WMEC 270)

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to preserve the Helicopter

Operating (HELO Ops)/Flight Deck and adjacent areas (see 4.1 (Definition of HELO Ops Areas)).

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 801-004, Rev J, General Arrangement 01 Level

Coast Guard Drawing 905 WMEC 801-004, Rev F, General Arrangement 01 Level

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

OTHER REFERENCES

MIL-PRF-24667C, March 2018, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering

Application

Naval Air Warfare Center (NAVAIR) Drawing 621055, Rev F, Visual Landing Aids Installation

WMEC-270 Class Ships

NAVSEA Standard Item 009-32, FY-22 CH-1, Feb 2021, Cleaning and Painting Requirements;

Accomplish

QPL-24667, April 2021, Qualified Product List (Military) of Products Qualified Under Detail

Specification MIL-PRF-24667, Coating System, Non-Skid, for Roll, Spray, or Self-

Adhering Application

The Society for Protective Coatings (SSPC)/NACE International (NACE), Joint Surface

Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP

11), 2020, Power Tool Cleaning to Bare Metal

19 (Rev-0)

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Flight deck safety net assemblies.

Talon grid cover.

Flight deck landing lights.

Deck drain gratings.

3.2 Visual Landing Aid (VLA) and safety marking sketch. Prior to commencing surface preparation tasks, the Contractor must develop and submit, to the COR, a sketch of all existing Flight Deck VLA and safety markings and their measured locations on the Flight Deck, using NAVAIR Drawing 621055 as guidance.

Obtain Coast Guard Inspector approval of the sketch, prior to applying new marking paint (see 3.6.4

(VLA and safety markings)).

3.3 Containment and ambient condition control. For exterior surface preservation, the Contractor must provide suitable fully-enclosed tenting for the purpose of maintaining satisfactory environmental conditions and containing generated dust, paint chips, and spent abrasives. Additionally, the Contractor must provide any and all equipment necessary to control the ambient conditions, throughout the entire surface preparation and preservation processes, satisfying the requirements specified in SFLC Std Spec

6310, Section 3 (Requirements) to include the recommended conditions provided by the coating system’s manufacturer. Equipment may include, but is not limited to:

A/C system

Heaters

Blowers

Dehumidifiers

3.4 Polyurethane coatings. The Contractor must be aware that two-part polyurethane primers, membranes, color toppings, and non-skid are not authorized for application on Coast Guard vessels, even if listed on

QPL-24667.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

20 (Rev-0)

3.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.6 Preservation requirements. The Contractor must prepare and coat the deck surfaces designated in paragraph 1.1 (Intent), using the system specified in Table 1. Non-skid systems (primer, non-skid topcoat, and color topping) must be installed in accordance with NAVSEA Standard Item 009-32 for Flight Deck

Certification. Ensure that the system is qualified as “UV/LSA”, as designated on QPL-24667.

TABLE 1 - FLIGHT DECK COATING SYSTEM

EXTERIOR

SURFACES TO

BE PRESERVED

SURFACE PREPARATION /

(ANCHOR PROFILE IN MILS)

COATING SYSTEM DFT (MILS) NOTES

Flight Deck SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 /

(3.0-6.0)

1) One Full Coat Primer

MIL-PRF-24667 Type I, Comp. G

2) Stripe Coat MIL-PRF-

24667 Type I, Comp. G

3) One Full Coat Primer

MIL-PRF-24667 Type I, Comp. G

4) One Coat Non-Skid

MIL-PRF-24667 Type I, Comp. G

Follow Manuf.

Instructions

1, 2, 3, 4,5

1. Color coating flight decks for other than required markings is not authorized. Non-skid material is rolled on over primer within 48 hours for best adhesion.

2. Power tool cleaning to bare metal (SSPC-SP 11) may be used in areas that cannot be accessed by abrasive blasting.

3. Waterjetting may be used only as a means of coating removal. Final surface preparation must be via abrasive blasting to the standard specified in Table 1.

4. Recyclable encapsulated abrasive media, such as Sponge-Jet, may not be used.

5. Flight decks are constructed of High Yield (HY) steel and must not be heated to remove the existing coating.

3.6.1 The Flight Deck coating system must be procured as a qualified system conforming to MIL-PRF-

24667 containing the following:

Anti-corrosive/primer coating.

Dark grey color (36076) non-skid top coating.

Dark grey color (36076) finish coating, for non-skid exempted areas.

White finish color (37875) coating, for VLA and safety markings.

3.6.2 Substrate inspection. After completion surface preparation and before application of primer coat, the

Contractor must perform a visual inspection of the prepared substrate; submit a CFR.

3.6.3 Non-skid exempted areas. Apply top/finish coating, in lieu of non-skid top-coating over the following non-skid-exempted areas:

Deck fittings, including, but not limited to: pad eyes, label plates, net supports/foundation, helicopter tie-down fittings, and lifting handles for aircraft fuel filling station.

Areas within two inches of deck fittings and protrusions.

Areas within six inches of adjacent bulkheads, deck coaming, and deck edges.

Waterways.

21 (Rev-0)

3.6.4 VLA and safety markings. The Contractor must accomplish the following tasks:

3.6.4.1 Remove Flight Deck landing lights in way of work. Visually inspect light assemblies and submit

CFR. Prepare and preserve light assemblies to match existing in accordance with SFLC Std Spec 6310.

Reinstall light assemblies to original configuration.

3.6.4.2 Stripe the Flight Deck with the same pattern sketched prior to surface preparation.

3.6.4.3 Paint new VLA and safety markings with a White color (37875) finish coating.

3.7 Low temperature cure system. If a Change Request has been authorized and released, the Contractor may apply a legacy low temperature cure system, conforming to MIL-PRF-24667 Type VIII, Composition G.

NOTE

The low temperature system is only authorized for application at temperatures between 35-45 degrees F.

3.8 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

NOTE

Surfaces being preserved are considered “critical-coated surfaces”.

3.9 Non-skid surface appearance and texture. The Contractor must ensure the non-skid surface shows a pattern of peaks and ridges. The ridge profile must be continuous and reasonably uniform. Peaks and ridges must be generally in the same direction (fore and aft), approximately 1/2 to 1 inch apart, and approximately 1/16 to 3/32 inches high. Aggregate must present a rough uniformly coarse appearance over the entire surface with no loosely bound clumps of particles. All weld seams must be cross-rolled from a minimum of 3 inches on either side of the weld.

3.10 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

4. NOTES

4.1 Definition of “HELO Ops Areas”/Flight Deck. “HELO Ops Areas” are defined as 01 Level deck surfaces, from Frame 103 aft, port and starboard,, as shown on Coast Guard Drawing 905 WMEC 801-

004, including 01 Deck inside hangar bay, boat decks, helicopter tie-down fittings, 01 Deck perimeter coaming, talon grid cover, raised “mushroom” type tie-down fittings, line-up light fixtures, flight deck net supports/foundations, and up to six inches on all adjacent vertical surfaces, where applicable.

4.2 Certification hot line action desk. The Naval Air Warfare Center Aircraft Division Lakehurst has the responsibility for inspection and certification of all air capable aviation ships which support and operate with helicopters. A Shipboard Aviation Facility hot line action desk has been established at the Naval Air

Warfare Center Aircraft Division Lakehurst, to provide a central point of contact for obtaining all

22 (Rev-0) information pertinent inspection and certification issues, including VLA and safety markings.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .