Attachment 2 Statement of Work Solicitation 1232SA26Q1197 .docx

DOCX document 89 KB Posted

Attached to
Remodel Room B1-433 - New Cabinetry, Sinks, and Countertops
Solicitation number
1232SA26Q1197
Issued by

About this file

This is a Statement of Work for a remodeling project at the USDA Agricultural Research Service facility located at 934 College Station Road, Athens, GA. The project scope requires installation of new cabinetry, sinks, and countertops in Room B1-433, specifically including eight base and apron units with phenolic tops, six wall units, three filler panels, two undermount epoxy/stainless steel sinks, one trespa epoxy stainless steel pegboard, and three reagent shelf uprights with 3-4 foot shelving sections. The contractor must provide all professional services, labor, equipment, materials, testing, and personal protective equipment necessary for completion. The facility will remain occupied during construction, requiring coordination with facility personnel and adherence to all COVID-related precautions. The project must be completed within 45 days from the notice to proceed, with work hours restricted to Monday through Friday, 7:00 A.M. to 4:30 P.M., excluding government holidays.

The contractor must comply with all applicable codes and standards including ANSI, ASME, NEC, NFPA 72, OSHA, ADA, and the International Building Code, as well as ARS Facilities Design Standards. Prior to construction, the contractor must submit a detailed cost breakdown, project schedule, Site Specific Safety Plan, and equipment/material submittals for approval by the Contracting Officer Representative. Key contractor requirements include site verification of dimensions and conditions, daily waste removal, daily work reports to the COR, weekly status updates, on-site superintendent presence, provision of their own restroom facility, valid federal or state identification for all personnel, and adherence to USDA biosecurity protocols. The contractor must provide a ten-year guarantee against faulty material and workmanship, with deficiencies corrected within 24 hours of notification. Project contacts include Facilities Operation Manager Walt Dennis and Maintenance Liaison Brandon Randall. A site visit is encouraged prior to bid submission, and contractors must be registered in the System for Award Management (SAM) prior to submitting a bid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work USDA, Agricultural Research Service

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Remodel Room B1-433

USNPRC, B1

934 College Station Road Athens GA, 30605

Prepared by:

Brandon Randall

Version 2.8, Page -
Page 10 of 10

Scope of Work The contractor must provide all professional services necessary to Remodel B1-433 with new cabinetry, sinks, and counter tops. located at the USDA, ARS, USNPRC B1 on 934 College Station Road Athens GA, 30605.

The contractor must include all services and field labor, equipment, materials, testing and personal protective equipment necessary to perform the work. No Government equipment will be available for use by the contractor.

Base Bid The contractor must provide a detailed proposal and cost breakdown for the entire project as specified in this statement of work.

Site Visit A site visit is encouraged while escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing first‑hand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.

Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid. Registration can be completed at www.sam.gov/portal/public/SAM

Codes and Standards Applicable Codes and Standards apply and are not limited to the following

ANSI -American National Standards Institute.
ASME -American Society of Mechanical Engineers.
NEC -National Electrical Code, NFPA 72.
OSHA -Occupational Safety and Health Administration
ADA –Americans with Disabilities Act

All work must meet ARS 242.1M “ARS Facilities Design Standards” for the defined scope of this project in addition to meeting all Local, State and Federal codes, and latest International Building Code (IBC).

Project Summary The project consists of the following elements:

1. Install new base and apron units, level and set with phenolic top x18

2. Install new wall units level and set x6

3. Install new front, end, and side filler panels x3

4. Install new undermount epoxy/stainless steel sink x 2

5. Install new trespa Epoxy stainless steel pegboard x1

6. Install new reagent shelf upright with shelf 3-4 Ft. Section x3

The facility will be occupied during construction activities. All work shall be scheduled in advance and coordinated with the facility representative to minimize the disruption to daily operations and research programs.

Utilization of Bio-Based Products The contractor must utilize products and material based from bio- based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at: www.biopreferred.gov

Safety The contractor will submit a Site Safety Specific Plan (SSSP)/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. The Government shall review the SSSP prior to the start any construction activities.

Safety and health matters, as they relate to the work, are the exclusive responsibility of the contractor. The contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions that may be required by law or local authorities for the protection and security of the grounds, facilities, and personnel. Contractor must coordinate with Lab Personnel and strictly always follow all Covid related precautions and procedures.

Contractor Requirements The contractor must provide a complete and functional installation, including all labor, supervision, tools, materials, equipment, apparatus, transportation, rigging and other equipment and services necessary to accomplish the work in accordance with the intent and meaning of this statement of work.

The project work must be performed per the following guidelines:

1) Contractor will verify all dimensions and existing site conditions prior to beginning work.

2) The contractor must always be responsible for protecting his work and ensuring the safety of his crew and ARS employees.

3) Contractor must remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site on a weekly basis.

4) Contractor is required to manage the project and consult with the Government prior to beginning all work phases.

5) Contractor must perform work in a manner that minimizes the impact to daily operations of the facility and its workers. The building will be occupied during construction work.

6) Contractor will provide daily reports of work performed to the COR and weekly status updates to the TPOC.

7) Contractor must have a superintendent on the jobsite when crews are performing the installation work.

8) Contractor will provide their own restroom facility.

9) All Contractor personnel will be required to show a valid Federal or State ID to enter the property.

10) Contractor will abide by all USDA Biosecurity protocols relevant to this project.

All work is to be performed according with building codes, ordinances and laws of the Authority having jurisdiction on the project. When the requirements of the building codes, ordinances, and laws conflict with any other part of the building codes, ordinances and laws, the most restrictive requirement shall prevail. The Contractor is responsible for obtaining all permits and construction approvals necessary to successfully complete the project.

Documentation Requirements

Material Submittals The contractor must submit for approval all documents/samples necessary to ensure requirements of project will be satisfied. Electronic submittals on all equipment and materials used on this project shall be submitted to the TPOC noted in this document.

Pre-Construction Submittals Prior to construction activities beginning the following submittals must be provided to the CO and TPOC for approval.

1. Project Schedule (including daily work start/stop time)

2. Site Specific Safety Plan (SSSP) / Accident Prevention Plan

3. List of contract personnel of the general and subcontractors

General Requirements

Damage to Property:

The Contractor must protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property must be repaired to pre-damaged condition to the satisfaction of the TPOC.

Inspection and Acceptance A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 2 days in advance with the TPOC.

Period of Performance The completion of this project shall not exceed 45 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.

Work Hours:

Contractor work hours must be Monday through Friday, 7:00 A.M. to 4:30 P.M. except on Government holidays. Any changes to work schedule must be submitted to Contacting Officer for written approval prior to schedule change.

Guaranty The contractor must provide and submit a single guarantee stating that all portions of the work are in accordance with Contract requirements. Guarantee all work against faulty and improper material and workmanship for a period not less than ten (10) years from date of final acceptance by the USDA, except where manufacturer guarantees or warranties are for longer terms. The contractor must correct any deficiencies which occur during the guarantee period within 24 hours after notification.

Project Contacts Facilities Operation Manager (TPOC):

Walt DennisWalt.Dennis@usda.gov
934 College Station RdPhone: 706-546-3715 x5222

Athens, GA 30605

Maintenance Liaison (TPOC/COR):

Brandon Randallbrandon.randall@usda.gov
934 College Station RdPhone: C 706-340-1818

Athens, GA 30605 image1.jpg