This Statement of Work (SOW) details a contract opportunity for removing and replacing an exterior roll-up door at Building 6227 on Barksdale Air Force Base. The project requires a contractor to remove the existing rolling steel door, reuse the existing motor operator, and install a new rolling steel door with specific characteristics: approximately 30'X20'-2", single guide weathering, lintel Z brush seals, right hand drive, and front of hood mounting motor bracket. The LiftMaster Logic 5.0 motor operator system will be utilized, and the contractor must ensure all work meets federal and local building codes, including NFPA, Uniform Building Code, and Occupational Safety and Health Act standards. The contractor will be required to be escorted while working on the flight line roadside of the facility and must conduct a site visit prior to installation to ensure correct sizing.

The solicitation (FA460825QS038) is a 100% small business set-aside with a NAICS code of 332321 and a small business size standard of 750 employees. The period of performance is from 16 July 2025 to 16 August 2025. Key dates include a mandatory site visit on 8 July 2025, question submissions due by 9 July 2025, and quote submissions due by 11 July 2025 at 12:00 PM CST. The contract will be awarded through the Department of the Air Force Global Strike Command, 2d Contracting Squadron at Barksdale AFB, Louisiana. The government will make the award based on a best value determination considering price and technical factors, with an expectation of using initial responses for the evaluation.

View the file

Other files for this federal contract opportunity

Other files attached to Hangar Roll Up Door Replacement, newest first.
File Type Posted
Combined Synopsis-FA460825QS038 Amendment 01.pdf PDF
Amendment 01- FA460825QS038.pdf PDF
Attachment 1-Provisions and Clauses-FA460825QS038 .pdf PDF
Combined Synopsis-FA460825QS038 .pdf PDF
Attachment 3-Wage Determinations-FA460825QS038.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work For

Opportunity FA460825QS038 ServiceRequest 4879229

Remove & Replace Exterior Roll up Door for Bldg. 6227

Background Remove and replace an existing roll up door with suitable replacement that meets all fire and safety codes.

Scope of Work The contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to accomplish the task of removing existing hangar door and installation of new door, while utilizing existing new motor operator. *This job will require a Lift/Man Lift equipment.

Service Delivery

1. This requirement will consist of the:

a. Remove and disposal of existing rolling steel door

b. Reuse existing new motor operator.

c. Install new rolling steel door

2. Rolling Door Salient Characteristics

a. Rolling steel door approximately 30’X20’-2”

b. Single Guide Weathering

c. Lintel Z Brush Seals

d. Right Hand Drive

e. Front of Hood Mounting Motor Bracket

3. Motor Operator System

a. LiftMaster Logic 5.0

4. Upon completion of this entire repair, all applicable construction and area debris shall be removed/cleaned.

5. Code Compliance:

a. Where applicable, all work performed under this contract shall meet all federal and local codes and standards including but not limited to NFPA, Uniform Building Code, MIL-HDBK-1190, Facility Planning and Design Guide, Occupational Safety and Health Act of 1970, Air Force Technical Letters (ETLs), Southern Standard Building Code, National Electric Code, ASHRAE Standards, SMACNA Standards, National Plumbing Code, etc. Where any ambiguity exists between standards, the most stringent shall apply.

b. Any work performed by the contractor that, in the opinion of the Government Technical Representative, does not comply with the manufacturer’s installation/performance instructions or does not meet industry standards, shall be removed and replaced by the contractor at no additional cost to the government.

FA460825QS038

Attachment 2-Statement of Work

07/02/2025

6. General Notes:

a. This door is on the flight line roadside of the facility. Contractor must be escorted for the duration of work.

7. Hazardous material The Statement of Work does not require the contractor to deliver, store, use, or handle hazardous material at this government activity.

8. Recommend Contractor to come for a site visit prior to contract installation for sizing before order to provide the correct closure of the space.