STATEMENT OF WORK SUMMARY

This is a Statement of Work (SOW) for the Tatanka Hotshots Base Fire Alarm Upgrades project issued by the U.S. Department of Agriculture (USDA), dated December 10, 2025. The project is located at 12266 Tatanka Drive, Custer, South Dakota 57730, and involves upgrading the fire alarm system at the Tatanka Hotshots Quarters, a 6,300 gross square foot single-level building constructed in 2002. The contractor is responsible for providing all design, labor, materials, equipment, and freight for the complete removal and replacement of the fire alarm system, including fire alarm panel, pull stations, detection devices, notification devices, supervisory devices, and ongoing fire alarm monitoring. Associated work includes ceiling tile removal and reinstallation, patching, painting, electrical work (requiring a licensed electrician), and communication cabling. The existing system, designed per NFPA 13D and 13R standards, includes ionization detectors for HVAC fire detection with manual reset features that shut down air handling units and activate the building fire alarm when triggered.

The contractor must submit materials submittals, an Accident Prevention Plan, Quality Control Plan, Construction Schedule (within 10 calendar days of Notice to Proceed), and Operations and Maintenance Manuals at least 15 working days before final inspection. Work may not be performed during holidays, weekends, or between 6:00 PM and 7:00 AM without written approval from the Contracting Officer. The contractor must maintain a Project Supervisor/Superintendent on-site daily, provide temporary sanitary facilities and telephone service, implement fire protection measures complying with NFPA 241, obtain temporary field office space within the staging area, and comply with environmental regulations and Red Flag Warnings. The contractor bears all travel expenses, and the government will permit use of existing water and electric services without metering or charges. All electronic deliverables must be accessible to persons with disabilities and comply with Section 508 standards. No government-furnished materials are provided, and no data is produced through this project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work Tatanka Hotshots Base Fire Alarm Upgrades, Custer, South Dakota

Date: 12/10/2025

CONTENTS

Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards Attachment

PROJECT

TATANKA HOTSHOTS BASE FIRE ALARM UPGRADES

GENERAL INFORMATION

1.0 SCOPE OF WORK

Work for this project requires the Contractor to be responsible for supplying all design, labor, materials, equipment, miscellaneous items, freight and delivery for the removal and replacement of the fire alarm system including fire alarm panel, pull stations, detection devices, notification devices, and supervisory devices; provide associated ceiling tile removal and reinstallation, patching, painting, electrical, and communication cabling. Work also includes providing for on-going fire alarm monitoring.

The Tatanka Hotshots Base is located at 12266 Tatanka Drive, Custer, Custer County, South Dakota, 57730.

The Tatanka Hotshots Base hosts two buildings which were both constructed in 2002: The Tatanka Hotshots Quarters is a 6,300 gross square foot (gsf) single level building.

2.0 BACKGROUND

The Fire Sprinkler system was designed for Dwelling Units per NFPA 13D and constructed in 2001-2002. The sprinkler head locations and types were part of the original design. Area and densities were designed to conform to NFPA 13R.

A. The original design Sequence of Operations of the Sprinkler System is as follows:

1. The entire piping system above the air and water valve shall be charged with air. Gages will indicate the pressure.

2. A small air compressor will maintain the required pressure, operating off a pressure switch. The compressor will recharge the system if very small leaks occur.

3. When the air pressure in the system reaches a preset pressure, before the pump is actually started, an alarm will be sounded indicating low air pressure.

4. If the pressure continues to drop, as it would if a sprinkler head is open, a pressure switch will sense the low pressure and start the fire pump, the air and water valve will open and supply water to the open sprinkler head.

5. A flow switch will sense the flow and activate the phone dialer, alerting the local fire department and the person so designated.

B. HVAC System Fire Detection original design information:

1. The original system includes ionization detectors for the air handling system. One detector for each unit is located in the return air stream prior to being diluted by outside air. When fire detector is activated, the unit shall be shut down and the building fire alarm system activated. Ionization detectors shall have manual reset feature.

2. Room ionization detectors shall be wired to shut down all air handling units when activated.

3. Smoke ionization detectors shall shut down air handling units, close dampers, and activate building fire alarm systems.

The elevation at the site is approximately 5,600 feet above mean sea level. The site generally experiences moderate snowfalls beginning in November and ending in March or April. The average temperature is 70 ℉ in July and 25° F in February. Access to the project site is open year around. The building will be occupied by Government Personnel during the period of performance.

CONTRACTOR REQUIREMENTS

3.0 TECHNICAL REQUIREMENTS / TASKS

Technical Specifications in CSI format are included in the Solicitation Package.

The Contractor is required to provide all design, labor, materials, equipment, miscellaneous items, freight and delivery for the removal and replacement of the fire alarm system including fire alarm panel, pull stations, detection devices, notification devices, and supervisory devices; provide associated ceiling tile removal and reinstallation, patching, painting, electrical, and communication cabling. Work also includes providing for on-going fire alarm monitoring. A licensed electrician is required for performing electrical work.

Contractor shall not perform work during holidays, weekends or between 6:00 PM and 7:00 AM unless approved in writing by the Contracting Officer.

Contractor shall provide signing and barricades and appropriate safety measures to protect the public and adjacent site improvements during all construction operations.

Contractor shall provide temporary sanitary facilities for the duration of the project.

Contractor is responsible for providing telephone service deemed necessary for the duration of the project.

Use of existing water services and electric power and lighting service by the contractor will be permitted without metering and without payment of use charges as long as equipment and facilities are cleaned and maintained in a condition acceptable to the Contracting Officer Representative.

Contractor shall provide waste-collection containers in sizes adequate to handle waste generated from the project. Contractor shall clean up construction debris at the completion of each day’s work.

Contractor shall comply with Fire Restrictions as identified in NFPA 241 and as necessary for the types of materials used and with Red Flag Warnings issued by the National Weather Service or Forest Service.

Contractor shall examine existing conditions before beginning work; take field measurements as required to fit the work properly; locate the work and components of the work accurately, in correct alignment and elevation. Make vertical work plumb and horizontal work level. Conceal wiring in finished areas unless otherwise indicated. Contractor shall comply with manufacturer’s written instructions and recommendations for installing products.

Contractor shall use products. Cleaners, and installation materials that are not considered hazardous.

Contractor shall clean project site and work areas daily and dispose of materials lawfully.

Contractor shall provide complete Operation and Maintenance Manuals for the completed project.

Refer to Specification Section 010150 “General Requirements” for Contractor and full Project Specifications and Drawings for the entire project.

4.0 GOVERNMENT FURNISHED

This Project does not involve Government Furnished Materials.

5.0 DELIVERABLES / SCHEDULE

Deliverables for this Work include materials submittals prior to start of work, Accident Prevention Plan, Quality Control Plan, Construction Schedule, and Operations and Maintenance Manuals. All written deliverables shall be phrased in layperson language.

All Submittals shall be prepared in accordance with requirements of Section 010150 “General Requirements” and as detailed in Specifications for other materials and disciplines.

Contractor shall provide an assembled Operation and Maintenance Manual in final form at least 15 working days before final inspection. Operations and Maintenance Manual shall comply with requirements of Section 010150 “General Requirements.”

At the time of the preconstruction conference, submit for approval a written Contractor Quality Control (CQC) plan. Maintain Quality Control Daily Reports and Daily Test Report

Information Sheets (samples attached) of quality control activities and tests.

Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.

Within 10 calendar days of Notice to Proceed, submit a detailed Construction Schedule. Provide Schedule in electronic format. Refer to Specification Section 010150 “General Requirements” for additional requirements for Construction Schedule.

6.0 TRAVEL

Travel is responsibility of the contractor; the U.S. Forest Service will not reimburse travel expenses.

7.0 CONTRACTOR’S KEY PERSONNEL

Contractor shall have a Project Supervisor/Superintendent on-site for each workday.

Contractor shall provide properly trained and skilled craftsman as needed to perform the Work.

Licensed Electrician is required for performing electrical work of this Project.

8.0 SECURITY REQUIREMENTS

An area within the staging area can be used for locating a temporary field office. Temporary facilities to this office can remain on site during construction. Coordinate size and location of office with CO prior to bringing in field office. Security and clean-up of temporary facility location is the responsibility of the Contractor.

Contractor shall not have access to interior of existing buildings. If interior access is needed to perform specific tasks such as door painting, Contractor shall arrange for access through the Contracting Officer at least 2 working days in advance.

Use of Government existing water and electric service facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.

Contractor shall provide temporary sanitary facilities for the duration of the project.

Contractor is responsible for providing telephone service deemed necessary for the duration of the project. Cell phone service is generally available at the Site, however, may be limited at times.

Contractor is responsible for providing appropriate telephone service

Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects

Contractor shall comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber

Contractor shall comply with the following Fire Protection requirements:

A. Comply with NFPA 241 requirements unless otherwise indicated.

B. Store combustible materials in containers in fire-safe locations.

C. Remove and keep area free of combustibles, including rubbish, paper, waste, and chemicals, unless necessary for the immediate work. If combustible materials cannot be removed, provide fire blankets to cover such materials.

D. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas. Supervise cutting and welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

E. Comply with all Red Flag Warnings issued by the National Weather Service.

F. Fire Control Devices: Provide and maintain fire extinguishers and rag buckets for disposal of rags with combustible materials. Maintain each as suitable for the type of fire risk in each work 1. Ensure that personnel are trained in fire extinguisher use.

9.0 DATA RIGHTS

No data is produced, furnished, or acquired in or through this Project

10.0 SECTION 508 – ELECTRONIC AND INFORMATION TECHNOLOGY STANDARDS

Contractor shall provide Construction Schedule, Accident Prevention Plan, Quality Control Plan, Operations and Maintenance Manual and other required submittals in electronic format.

All electronic information provided shall be accessible to persons with disabilities. And comply with Section 508.

ATTACHMENTS

Tatanka Fire Drawings Tatanka Fire Alarm Upgrades Specifications

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards