Attachment 2 - Statement of Work.pdf

PDF 113 KB Posted

Attached to
John Deere Gator - Travis AFB
Solicitation number
FA442725Q1152
Issued by

About this file

This Statement of Work (SOW) details requirements for the 60 FSS/FSVS Sports Program, dated 04 September 2025. The document specifies that the Fitness Center must maintain outdoor athletic facilities year-round as a category A core program requirement, including preparation and maintenance of sports fields, particularly softball fields. All ballfields must pass a safety inspection prior to game play in accordance with DAFI 34-114 3.5.2.

The primary procurement is for a John Deer Gator HPX815E Model Year 2025 with specific equipment specifications, including High-Performance All-Purpose (HPAP) Tires, a Black Standard Bench Seat, Cargo Box with Spray In Liner, Park Position Transmission, Brake and Taillights, Cargo Box Manual Lift with Prop Rod, OPS with Nets, Black Poly Roof, and Front Brush Guard. The delivery timeframe for this vehicle is 60 days after receipt of order (ARO).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

For

60 FSS/FSVS– Sports Program

Date 04 September 2025

The Fitness Center is required by DAF134-114 to maintain all outdoor athletic facilities year-round as a category A core program requirement. The fitness and sports staff must conduct preparation of sports fields to include softball fields prior to the beginning of the season, daily prep during and after-season maintenance. All ballfields are required to pass a safety inspection prior to the start of game play IAW

DAFI 34-114 3.5.2.

The contractor shall provide:

John Deer Gator HPX815E Model Year 2025

*High-Performance All-Purpose (HPAP) Tires, *Standard Bench Seat – Black, *Cargo Box with Spray In Liner, *Park Position in Transmission, *Brake and Taillights, *Cargo Box Manual Lift with Prop Rod, OPS with Nets, Black Poly Roof, Front Brush Guard

Delivery timeframe: 60 days ARO

File details come from the government source that posted it. Updated .