Attachment 2 - Statement of Work .pdf
PDF 108 KB Posted
- Attached to
- 71 - Office Furniture Federal Workstations
- Solicitation number
- N0018925QFRNT
About this file
This document is a Minimum Requirements document for office furniture procurement for the Surface and Mine Warfighting Development Center (SMWDC) in Dahlgren, VA. The solicitation requires the procurement and installation of 34 workstations across multiple rooms, including two sign-in areas, two coffee areas, and one copy area. Specific requirements include L-shaped desks approximately 6'0" x 8'6", 66" high grey laminate panels, storage systems/filing cabinets, and panel dry erase boards.
Key contract details include a mandatory site visit scheduled for 22 July 2025, with a two-person vendor limit and base access requirements. The contract performance period is 30 calendar days from notice of award, with work to be performed during normal working hours (0700-1700, Monday to Friday). The contractor must remove existing furniture, install new furniture, complete electrical runs within desk systems, and perform a final walk-through with an SWTD Facilities representative. The delivery location is 528 Fourth Street, Bldg 1700, Dahlgren, VA 22448, with a required delivery date of 1 September 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - SWTD Renovation Floor Plans.pdf | ||
| Attachment 1 - Clauses and Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Minimum Requirements
Surface And Mine Warfighting Development Center (SMWDC) 5280 Fourth St BLDG 1700 SWTD Office Furniture
RY074425RC003NF
1. Scope:
The purpose of this document is to procure furniture in support of SMWDC, Surface Warfighting Technical Division (SWTD), in Dahlgren, VA 22448, US Navy Base. The office that this furniture will be delivered is on the second floor and will need to be fully installed and given a quality assurance inspection by the supervisor of the contractor. All furniture items currently installed in the office space will need to be dismantled, removed, and disposed of by the contractor. Requires to be outfitted with functional and operational equipment to conduct daily business and maintain personnel support for maritime operations.
Furniture shall be delivered at agreed upon date with SWTD Facilities:
ITC Bettles Tina Hagens
2. Minimum Requirements (description-size, color, features, etc.):
SWTD Facilities requires the procurement of thirty-four (34) workstations, two (2) sign in areas, two (2 coffee areas, one (1) copy area . Additionally, the Contractor shall remove and dispose of all current office furnishings, and shall provide, deliver, and install all requested items as described below. The contractor shall provide qualified personnel, services, materials, equipment, supplies, and facilities necessary to perform purchase and installation of furniture. Installation will include breakdown, removal, and hauling away of all current furniture, including delivery of all furniture parts and assembly on sight, to include electrical runs within the desk systems. Contractor will haul away all associated packing materials. All tools and any special handling equipment required for installation will be provided by the contractor. The contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract. SWTD Facilities personnel will ensure spaces are clean and accessible prior to installation, this does not include the breakdown, removal, or hauling away of current install furniture.
Once installation is complete the company will complete a walk through with a designated representative of SWTD Facilities of at least an E-7 or above for final acceptance. To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, at no additional cost to the government, during the Period of Performance agreed upon.
Contractor shall provide all labor and equipment to install all furniture identified below. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contract who, in turn is responsible to the Government.
Main Office: One (1) Workstations as described below:
• Workstation shall include an L shaped desk with one (1) storage system/filing cabinet that fits below the desk.
• Workstation will be approximately 6’0” x 8’6”.
• Workstation will include 66” H laminate. Grey in color.
• Desk shall be laminate and/or wood colored.
• Panel Dry Erase Board
Main Office: One (1) Copy Area:
• Copy area will include 66” H laminate. Grey in color.
• Lower storage with upper shelf / Cabinet
Room 243: Two (2) Workstations as described below:
• Each workstation shall include an L shaped desk with one (1) storage system/filing cabinet that fits below the desk.
• Each workstation will be approximately 6’0” x 8’6”.
• Each workstation will include 66” H laminate. Grey in color.
• Each desk shall be laminate and/or wood colored.
• Panel Dry Erase Board
Room 247: Four (4) Workstations as described below:
• Each workstation shall include an L shaped desk with one (1) storage system/filing cabinet that fits below the desk.
• Each workstation will be approximately 6’0” x 8’6”.
• Each workstation will include 66” H laminate. Grey in color.
• Each desk shall be laminate and/or wood colored.
• Panel Dry Erase Board
Room 248: Two (2) Workstations as described below:
• Each workstation shall include an L shaped desk with one (1) storage system/filing cabinet that fits below the desk.
• Each workstation will be approximately 6’0” x 8’6”.
• Each workstation will include 66” H laminate. Grey in color.
• Each desk shall be laminate and/or wood colored.
• Panel Dry Erase Board
Room 270: Eight (8) Workstations as described below:
• Each workstation shall include an L shaped desk with one (1) storage system/filing cabinet that fits below the desk.
• Each workstation will be approximately 6’0” x 8’6”.
• Each workstation will include 66” H laminate. Grey in color.
• Each desk shall be laminate and/or wood colored.
• Panel Dry Erase Board One (1) Coffee Mess as described below:
• Coffee Mess will include 66” H laminate. Grey in color.
• Coffee Mess shall be laminate and/or wood colored.
• Storage system cabinet/shelf that fits above/below the surface
One (1) Sign in/storage areas described below:
• Sign in/storage will include 66” H laminate. Grey in color.
• Sign in/storage is needed above and below and must be able to hold 2 large primers
One (1) Display area as described below:
• Display area will back up against a cube have storage below.
Room 273: Eighteen (18) Workstations as described below:
• Six (6) workstations shall include an L shaped desk with one (1) storage system/filing cabinet that fits below the desk.
• Each workstation will be approximately 6’0” x 8’6”.
Six(6) single cubes Twelve (12) cubes set in Pods of four (4)
• Each workstations will include 66” H laminate. Grey in color.
• Each desk shall be laminate and/or wood colored.
• Panel Dry Erase Board
- 2 -
One (1) Sign in / Coffee Mess as described below:
• Coffee Mess will include 66” H laminate. Grey in color.
• Coffee Mess shall be laminate and/or wood colored.
• Storage system cabinet/shelf that fits above/below the surface.
• Sign in will be in the backside of coffee mess. Shelf and storage.
Site Visit
A site visit is scheduled for 22 July 2025 from 10:00 AM to 1:00 PM (EDT). Interested Vendors will meet the government point of contact at Main gate pass and ID to be escorted on: if the vendor does not have base access an escort will be required. The address is 17320 Dahlgren Rd, Dahlgren, VA. 22448. Interested Vendors that do not have an existing ID allowing access to the base must notify the government via email at Joseph.l.frech.civ@us.navy.mil so accommodations can be found to allow access to the site visit. There is a two (2) person limit for each interested vendor. Provide yourself with adequate time to arrive to the site visit location on time. The address is 17320 Dahlgren Rd, Dahlgren, VA. 22448. They are located directly to the right of Main gate.
All vendors interested in attending the site visit must contact Contract Specialist, Joseph Frech, by email at Joseph.l.frech.civ @us.navy.mil NO LATER THAN 12:00 PM (EDT) Monday, 21 July 2025.
Please provide the following:
1. Name
2. Company Name
3. CAGE Code
4. Able to enter base without an escort?
Clarifications of the Minimum Requirements must submitted in writing by email NO LATER THAN 3:00 PM EDT, 29 July 2025. All questions will be answered in writing and posted with the solicitation
3. Physical Location & Delivery Address for Supplies:
Surface And Mine Warfighting Development Center SWTD 528 Fourth Street, Bldg 1700 Dahlgren, VA 22448
4. Additional Information.
a) Work shall be performed during normal working hours, 0700- 1700, Monday to Friday. Work outside regular working hours requires Contracting Officer approval. Provide written request at least 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress.
During periods of darkness, the different parts of the work areas shall be lighted in a manner approved by the Contracting Officer. Work on Government holidays is considered as work outside regular working hours.
Government holidays are:
b) US Federal Holidays: New Year's Day, Martin Luther King Jr. Day, President's Day, Memorial Day, Juneteenth National Independence Day, Independence Day� Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.
c) Contractor shall remove and dispose all waste and excess materials in accordance with the final governing standard regulations. Sites shall be cleared of debris and cleaned on a daily basis.
d) Contractor shall repair any damage to existing facilities caused by execution of the work and shall return all work areas to the same condition as when the work began.
e) Contractor shall submit for approval the specification of the materials and equipment to be installed.
- 3 -
f) Contractor shall provide a schedule with distinct definable features of work (DFOW) to complete the entire Scope of Work within the number of calendar days allowed in the next paragraph. If in the contractor's professional opinion, the work cannot be completed in the allotted time, the contractor shall submit an alternate schedule with justification for additional time.
g) The contract performance period for this project is within 30 calendar days from notice of award. Period of performance is completed upon item delivery, installation, and acceptance.
- 4-