Attachment 2 Statement of Work.pdf
PDF 252 KB Posted
- Attached to
- Kitty Hawk Headhouse Shrub Sciences Lab Building and Site Work Federal contract opportunity
- Solicitation number
- 1240LT24Q0090
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Statement of Work for a federal contract opportunity to provide a pre-engineered metal building and associated site work to serve as a headhouse for greenhouses at the Rocky Mountain Research Station's Shrub Sciences Lab in Cedar City, Utah.
The key requirements include a minimum 22' x 16' building with galvanized steel exterior, insulation, lighting, concrete foundation, floor drain, and doors. The contractor must also connect the building to the site's utilities. Several optional bid items are identified, such as a mini-split HVAC system, outdoor soil storage, internet service extension, a commercial sink with water heater, a service panel, natural gas unit heaters, and an evaporative cooler for an existing greenhouse. The period of performance is 90 days after notice-to-proceed, with key deliverables including a construction schedule, material submittals, an operations and maintenance manual, and as-built drawings. The estimated contract value is between $100,000 - $250,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Map.pdf | ||
| Attachment 6 Kitty Hawk Geotech Report.pdf | ||
| 1240LT24Q0090.pdf | ||
| Attachment 7 Kitty Hawk Geotech Memo (1-23-2023).pdf | ||
| Attachment 3 Location Map.pdf | ||
| Attachment 5 Aerial Map.pdf | ||
| Attachment 4 Drawings signed.pdf | ||
| Attachment 8 Wage Determination Heavy.pdf | ||
| Attachment 9 Wage Determination Building.pdf | ||
| Attachment 1 Schedule of Items.xls | XLS spreadsheet | |
| 1240LT24Q0090.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards Attachment
Project Kitty Hawk Headhouse
General Information
1.0 Scope of Work
The contractor is responsible to provide all labor, equipment, supplies, and materials for the supply and installation of a pre-engineered metal building, and associated site work, to act as a headhouse for the greenhouses at Rocky Mountain Research Station’s Shrub Sciences Lab site. The contract shall also include optional items for bring an existing greenhouse at the same site up to operational condition. The Shrub Sciences Laboratory is located within the Color Country Interagency Fire Center at 1770 Kitty Hawk Dr, Cedar City, UT 84721.
2.0 Background
The Shrub Sciences Laboratory (SSL) was relocated to Cedar City in 2022. Site improvements to support the SSL at 1770 Kitty Hawk Dr were constructed in 2023. Improvements included the extension of water, sanitary sewer, and natural gas to two greenhouse sites and a future headhouse site. The utility stub-outs for the planned headhouse are located to the north of the greenhouses; locations as shown in the attached Drawings are approximate; contractor is responsible for locating utilities.
Contractor Requirements
3.0 Technical Requirements / Tasks
Space and installed equipment requirements: See the attached Drawings for reference floorplan.
• Minimum 22-ft x 16-ft building footprint
• Building’s exterior walls and roof shall be minimum 26-gauge galvanized steel. Interior finish of walls and ceiling shall be interlocking PVC panels.
• Minimum R-16 wall insulation, R-20 roof insulation
• Building shall meet IBC Section 1204 requirements for lighting, both natural and artificial. Prior to mobilization, contractor shall submit shop drawings showing proposed locations of glazing.
• Single-slope shed roof sloped to drain to the north, away from the greenhouses
• Building foundation sized appropriately to building loads and site conditions. The site contains a layer of collapsible soils in the first ~4ft from the surface, so foundation must sit upon competent soil. See attached Geotech Report (dated 8/23/2010) and Geotech Memo (dated 1/23/2023).
• Polished concrete floor
• Floor drain located to accommodate drainage from optional double-sink shown in Drawings
• Floor drain installed in center of room with floor slab sloped at minimum 1/8” per foot to drain
• One double door of minimum 60-inch width, located in the east wall of the headhouse
• One single door of minimum 30-inch width, located in the north wall of the headhouse
• All doors shall be able to be locked from the interior of the building.
• Electrical panel shall be capable of a 120/240V minimum 100-amp electrical service with sufficient breaker capacity to allow for interior lights, frequent 120 VAC wall receptacles with 20-amp breakers, HVAC equipment as detailed in optional bid item 1, point-of-use electric tankless water heater as detailed in optional bid item 4, and any dedicated circuits shown on the Drawings. The contractor shall submit an electrical plan layout showing the location of all receptacles, control panels, meters, and light fixtures, prior to mobilization.
• Approximately 162 SF of 4-inch, wire-reinforced concrete sidewalk as shown in the Drawings. Sidewalk must connect both doors of the proposed headhouse to the existing sidewalk.
• Contractor shall connect building systems to site water, sewer, and electrical.
• Final building must comply with local building codes, including:
o Cedar City, Utah adopted Plumbing Code o Cedar City, Utah adopted Building Code o Cedar City, Utah adopted Electrical Code o NFPA
Optional bid items are:
• Option 1: Single-zone mini-split heat pump of sufficient capacity for the workspaces to be kept between 65 and 75 degrees Fahrenheit year-round. Outdoor HVAC equipment may be either wall- or ground-mounted; indoor equipment may be wall- or ceiling-mounted. Contracting Officer to approve final location. Calculations showing sufficient temperature control capabilities shall be submitted.
• Option 2: Outdoor soil storage area composed of three 4’x4’ concrete-paved bays with 4’-high concrete dividers.
Dividers may be cast-in-place concrete or precast concrete blocks, but interior space of each bay must be at least 4’x4’. Contracting Officer to approve final location
• Option 3: Extend internet service from office/lab trailer to headhouse. Cat-6 cable may be run from server rack in the communications room of the office/lab trailer to the location within the headhouse shown in the Drawings, where a double-port date wall plate shall be installed. Cable may be run above office ceiling grid, surface mounted along building exterior in outdoor-rated conduit/raceway, or buried in conduit of appropriate size and material. Distance from existing server rack to proposed data ports is approximately 180 LF if run along building exterior.
• Option 4: Install stainless steel two-compartment commercial sink with point-of-use tankless electric water heater rated for 8kW. Install solids interceptor on sink drain line upstream of outfall to floor drain.
o Sink: Regency 76 1/2" stainless steel two compartment sink or approved equal o Water Heater: Rheem RTEX-08 or approved equivalent o Solids Interceptor: Drain-Tech Solids Interceptor Stand Alone Unit or approved equivalent
• Option 5: Furnish and install 200-amp service panel on the northern end wall of the East Greenhouse. Includes all materials and labor necessary for installation.
• Option 6: Install two GFM 121,500 BTU/h natural gas unit heaters in East Greenhouse. Contractor shall also furnish and install a heat distribution fan and 24”-diameter perforated fabric duct to distribute heat from the two unit heaters throughout the greenhouse. Contractor shall tie-in heaters to Argus controls system. See attached photos for required equipment configuration.
o Heat Distribution Fan: Acme RC/RCA24F or approved equivalent o Fabric Duct: Ductsox or approved equivalent
• Option 7: Furnish and install 20-ft “wet wall” evaporative cooler along southern end wall of East Greenhouse.
Includes installation of water service entry assembly per attached schematic and schedule 40 PVC required to run water to the cooler.
o Evaporative Cooler: Greenhouse Megastore model EV-SS4-01 plus EV-SS4-10 extension or approved equivalent. https://www.greenhousemegastore.com/collections/climate-control/products/stainless-steel-evap-system-for-4-pads
4.0 Government Furnished
Two Dayton 4LX56 150,000 BTU/h Input, 121,500 BTU/h Output natural gas heaters or equivalent if Option 6 is exercised.
5.0 Deliverables / Schedule
Period of performance shall be 90 days from notice-to-proceed (NTP). A partial NTP may be issued to allow for ordering of materials with significant lead times prior to mobilization.
Key Deliverables
Item No. Deliverable Objective Due 1 Construction Schedule Defining the responsibilities, timeline, risks, and milestones of contract objectives.
No later than the date of the prework conference
2 Material and Equipment Submittals
All material specifications, product data, manufacturer’s instructions, and material safety data sheets
No later than thirty (30) days after contract award https://www.greenhousemegastore.com/collections/climate-control/products/stainless-steel-evap-system-for-4-pads https://www.greenhousemegastore.com/collections/climate-control/products/stainless-steel-evap-system-for-4-pads
3 Operations & Maintenance (O&M) Manual
Binder including equipment manufacturer’s data, system schematics and descriptions, maintenance schedules, etc.
Prior to final inspection
4 As-built Drawings Drawings that recognize any changes in the plans, specifications, and/or approved submittal of equipment supplied
Prior to final inspection
6.0 Travel
Not Used
7.0 Contractor’s Key Personnel
Not Used
8.0 Security Requirements
Not Used
9.0 Data Rights
Not Used
10.0 Section 508 – Electronic and Information Technology Standards Not Used
Attachment
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 6.0 Travel |
| 7.0 Contractor’s Key Personnel |
| 8.0 Security Requirements |
| 9.0 Data Rights |
| 10.0 Section 508 – Electronic and Information Technology Standards |
| Attachment |