Attachment 2 - Statement of Work.pdf
PDF 1 MB Posted
- Attached to
- 2-Bay Self-Serve Carwash System (No Dry)
- Solicitation number
- FA460824QC017
About this file
This solicitation requests quotes for a 2-bay self-serve carwash system without dryers for Barksdale Air Force Base in Louisiana. The required system includes equipment for tire cleaning, presoaking, high-pressure soaping, rinsing, protective coating application, fluid controls, pumps, motors, plumbing, electrical work, coin collection, and payment processing. Quotes are due by February 1, 2024 and shall be submitted electronically to the identified contracting officers. The Air Force will award a contract for this nonappropriated fund requirement to the responsible offeror providing the most advantageous quotation in compliance with the statement of work. Installation is estimated at 3 to 8 weeks following order submission and equipment shipment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Auto Craft Shop Bldg. 4130 (Car Wash)
1.) The Contractor will provide a forklift, dumpster, and demo existing equipment that is outlined in the project, haul off and prepare bay(s) for new equipment installation. Contractor will unload truck(s), unpack boxes, layout the bay(s), and start installation of equipment. Contractor will complete a test wash on equipment and any adjustments will be made.
2.) The 2-bay Self-Serve System w/No dry includes Foaming Tire cleaner, Foaming Presoak, High Pressure Soap, Foam Brush with Weep, High
Pressure rinse, High Pressure Clearcoat, Weep Mizer Control, 5 Horse
Power/3 Phase Motors, SS Inlet Water Supply Manifold, Stainless Steel frame, dual belt drives on pumps, stainless steel tanks, hydrominder automatic fluid control, flojet tire cleaner and foam brush pump, stainless steel motor bases, U.L. listed motor control center, CAT 5CP2120W pumps, low water safety shut-off, automatic weep freeze system, foam brush weep, stainless steel manifolds, 3/8” HP Hose x 3/8” Poly Bay Equipment, 2
Bay 3/8” Hose Installation Kit of 3/8” HP Hose x 3/8” Poly, The Vault Bay
Meter Door Assy, The Vault Shell, The Vault Coin box with drawer and lock, control cables, 2 bay low pressure spot free delivery system, 2 bay wall pack triple foam conditioner, wall pack triple foam bay equipment, and
CRYPTO PAY coordinator.
3.) Contractor will provide minor training and operational instructions on site with facility/site manager.
4.) Self-serve Car wash bays dimensions are 14’ in width, 24’ in length, 15’ in height. Electric supply is 208v/3phase. Any new or additional electrical and plumbing work is to be accomplished by customer. The work must be coordinated between facility manager and CE, if needed. Contractor will terminate all electrical and plumbing from the building to the equipment as part of installation.
5.) All work shall be done by skilled workers in accordance with the best standard practice and in a manner acceptable to the facility manager. Any work not conforming to specifications shall be corrected at the expense of
Attachment 2 - Statement of Work the installing contractor. Contractor will certify equipment and work done during final walkthrough once install is complete.
6.) The contractor will be responsible for and including all labor and material cost required to repair any damages to government facilities that occurred during and as a result of the installation under contract. The damage will be identified as separate from the condition of the facility as identifiable during initial walk thru.
7.) Furnish to the contracting officer the following information for evaluation by using agency:
1. Trade Contractor: Full name or Corporation (to include all sub-contractors)
2. Address and phone numbers.
8.) Issue a statement signed by the owner or officer of the company or corporation accepting financial responsibility related to this project acceptable to the contracting officer and using agency.
9.) Installation shall comply with manufacturer’s guidance. The contractor will list all variations from contract document requirements.
10.) After execution, approval and payment is received to National Car Wash Solutions order will be submitted and at submission of equipment the estimated time frame until equipment is shipped to site is approximately 5 weeks.
11.) Installation completion is approximately 3 weeks but can have variable delays due to weather, plumber or electrician delays or access to building issues.
12.) The contractor shall provide product identification, including manufacturer’s name and address.
1. Product description
2. Reference standard
3. Performance and test data as applicable, including warranties.
END OF STATEMENT OF WORK
Attachment 2 - Statement of Work
File details come from the government source that posted it. Updated .