Statement of Work Project: Remove Existing Steam Boiler and Replace with New Steam Boiler in
Building 6 for Seed House
GENERAL INFORMATION
1.0 Statement of Work:
The contractor shall provide all labor, equipment, supplies, material and coordination required to replace the natural gas-fired steam boiler in building 6, Asset ID 544700B006, for Seed house. The new boiler is 900,000 BTU, 80 percent efficiency, it is 61” long, 30.5” wide and 66” tall foot print, the new boiler will pull combustion intake air from inside room and 8 inch exhaust, check manufacturers requirements so amount of the combustion air is adequate for new boiler operation, operating gas pressure is field set at startup with manufacturer requirement. The new boiler should be a TRIAD steam boiler Series 900 or equivalent to. Work includes replacing the existing steam boiler with new steam boiler, piping shall be insulated after leak tested, boiler should functionality tested to provide the designed amount of steam for building demand and contractor shall perform any integration services necessary to insure functionality and compatibility with new equipment.
All work shall adhere to manufacturer guidelines. Also follow state, local and federal regulations and codes.
2.0 Background: Boiler has reached its expected life and needs replacement. Included some photos of the existing boiler below
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
A. Demo & remove old boiler B. Furnish and install new steam boiler C. Furnish and install new exhaust material for new boiler D. Furnish and install all new steam rated pipe for reconnection to existing steam lines E. Furnish and install new make-up water piping F. Furnish and install all gas materials to fuel new boiler G. Contactor should provide start-up report and provide warranty
4.0 Government Furnished:
Access to the Boiler Areas shall be coordinated with the Location Monitor
5.0 Deliverables / Schedule:
A. Submittals on the New Boilers shall be made to the Government to show the
Contractor’s Quality Assurance that the new boilers meet the specifications and requirements for a turnkey installation and operation, out of crop drying season.
Government has up to two weeks to review the Quality Assurance Complete Submittal, and the Contractor has one week for responses to the Government’s review comments
B. Submittal on Schedule of Boiler Deliveries, and Boiler Installations with Startups
Item No.
Deliverable
Objective
Due
1 Replace existing boiler with new high efficient boiler
Replace obsolete boilers with new boiler
365 days.
2 Weekly Status Report To coordinate building operations and occupants with the boiler shutdowns and startups.
Weekly when work on site is planned.
6.0 Travel: Not applicable
7.0 Contractor’s Key Personnel:
A. On site Superintendent’s name.
B. Operator’s certification or license on equipment that operates over buildings or personnel.
8.0 Security Requirements: All personnel shall have a U.S. photo ID, such as U.S.
Driver’s License, or U.S. passport.
9.0 Data Rights: Not Applicable.
10.0 Section 508 – Electronic and Information Technology Standards: Operations and Maintenance Manuals in adobe format.
| CONTRACTOR REQUIREMENTS |
| 3.0 Technical Requirements/Tasks: |
| A. Demo & remove old boiler |
| 6.0 Travel: Not applicable |