Attachment 2 - Statement of Work.docx

DOCX document 66 KB Posted

Attached to
HH65 Hover Landing Light Repair Service
Solicitation number
70Z03821QB2000001
Issued by

View the file

Other files

File Type Posted
70Z03821QB2000001 - QA.doc DOC document
Attachment 3 - Terms AND Conditions.docx DOCX document
Attachment 1 - Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

HSCG38-14-R-200009

70Z03821QB2000001

Attachment 2

HOVER LANDING LIGHT REPAIRS

STATEMENT OF WORK

1.0 SCOPE

1.1 The United States Coast Guard (USCG) Aviation Logistics Center (ALC) Short Range Recovery (SRR) product line has a requirement for Hover Landing Lights to be repaired. The contractor shall provide all necessary parts, materials, labor, tooling, test equipment, and facilities to evaluate and repair the components listed in the Schedule. The contractor shall provide technical support services, support product improvement efforts, and provide updates to Component Maintenance Manuals (CMMs) and Technical Orders. Work under this contract shall be performed at the contractor’s facility.

2.0 APPLICABLE DOCUMENTS

2.1 Applicable Commercial Documents.

2.1.1 Original Equipment Manufacturer (OEM) CMM and other applicable technical specifications for the components set forth in the Schedule.

2.1.1.1 The contractor must have access to required CMM, repair specifications, and/or test and acceptance criteria and any other required data to ensure all components are tested and repaired in accordance with (IAW) the OEM’s current specifications and procedures. The USCG may review repair manuals and performance/test/acceptance criteria as required. Original design or functional capabilities of the end item and parts thereof shall not be changed unless authorized or directed by the requirement of this Statement of Work (SOW).

2.1.1.2 OEM documents are not available from the USCG and may be obtained from the applicable OEM, Grimes Aerospace Company (CAGE 72914). The contractor must have access to all applicable documents and the ability to obtain updated editions. The USCG does not own nor can it provide the technical documents specified herein. Neither the closing date for receipt of quote nor contract award shall be delayed pending receipt of these documents.

2.2 Government Documents. The following specifications, standards, and handbooks of the latest revision at the date of the original release of this specification listed below form a part of this specification to the extent specified herein.

2.2.1 USCG Documents

2.2.1.1 USCG Technical Orders that support components set forth in the Schedule. Copies may be obtained by written request and approved by the Contracting Officer (KO).

2.2.2 Federal Aviation Administration (FAA) Advisory Circulars (AC)

AC 43-4B Corrosion for Aircraft 11 Sep 2018

2.2.2.1A copy of these circulars are available at www.faa.gov.
2.3Military Standards
MIL-STD-2073-1Department of Defense Standard Practice for Military23 May 2008
Packaging

2.4 Occupational Safety and Health Standards

1910.1025 Lead

1910.1026 Hexavalent Chromium

1910.1027 Cadmium

2.4.1 A copy of these standards are available at www.osha.gov.

2.5Precedence. In the event of a conflict or ambiguity, the following order of precedence among documents shall govern:
a. USCG specifications and procedures, including this SOW and referenced documents
b. OEM specifications and procedures

2.6 Section References. Within this SOW, references to a given section number shall imply reference to all subsections. Where a group of sections is referenced, such as Section 3.1.1 through 3.5, the word inclusive after Section 3.5 is implied whether or not actually stated.

3.0 REPAIR REQUIREMENTS

3.1 Repair of Hover Landing Lights. Non-Ready for Issue (Non-RFI) components shall be repaired and returned to RFI condition IAW the OEM’s CMM. The Contractor shall perform all repair activities IAW with the OEM’s technical requirements. The Contractor shall perform an inspection and correct deficiencies found. This shall include, but is not limited to, replacement of missing or broken parts and the removal of any foreign matter or corrosion.

3.1.1 Work under this contract shall be performed at the contractor’s facility or USCG approved facility. The contractor shall provide all necessary parts, materials, labor, tooling, test equipment, and facilities to evaluate and repair the components listed at the firm-fixed prices listed in the Schedule. The contractor shall perform all repairs IAW applicable OEM CMM, other repair specifications in lieu of an applicable CMM, and/or applicable test/acceptance criteria. Any deviations must be approved by USCG.

3.1.2 All parts must be thoroughly cleaned IAW applicable CMMs or FAA AC 43-205 to ensure they are as free as practicable of all hazardous dust to include hexavalent chromium, cadmium, lead, etc., prior to being returned to ALC. ALC may take random samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025, 1910.1026, and 1910.1027.

3.2 Test and Evaluation (T&E) / No Fault Found. If, after visual and functional inspections, an item is found to meet manufacturer's minimum performance specifications and is considered to be RFI the item shall be classified as “No Fault Found.” The Contractor will be allowed the firm fixed price for T&E only identified as CLIN 0002 and subsequent Option Period CLINs in the Schedule. If the component is considered to be Beyond Economical Repair (BER) it shall be IAW with section 3.3. The parts shall be marked "RFI” or “BER” and returned to ALC.

3.3 BER. If an item is determined BER, the KO shall make a unilateral decision as to component disposition. The Contractor shall return all BER items to ALC. The Contractor shall not return any BER item until they have been notified by a written modification to the order. The Contractor shall prepare a failure data report IAW section 4.2 in these instances. This report shall be included with the returned component. When returning the item to ALC, the items shall be clearly marked as “BER” with the supporting evidence. The Contractor will be authorized the firm-fixed T&E fee established in CLIN 0002 and all respective option year CLINs.

3.4 Corrosion. During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part. Corrosion removal and treatment of affected areas will be accomplished IAW manufacturer's specifications. If not addressed in the manufacturer's specifications, the Contractor shall use FAA AC 43-4A.

3.5 Certification. The Contractor shall maintain at a minimum one of the following: FAA, European Aviation Safety Agency (EASA), Department of Defense (DOD), OEM, Industry Standard Certification (i.e., National Aerospace and Defense Contractors Accreditation Program) and/or USCG certifications for the repair of components identified in the Schedule throughout the duration of the awarded contract. The Contractor shall provide immediate notification to the KO upon loss of any required certifications. The Contractor shall provide their certifications with their submitted quote.

3.6 Airworthiness. The Contractor shall furnish a Certificate of Conformance IAW Federal Acquisition Regulation (FAR) Clause 52.246-15 (Apr 1984) and a Certificate of Airworthiness for all components. The Certificate of Airworthiness shall be provided in the form of a FAA Form 8130-3, EASA Form 1, or DOD equivalent. For repairs accomplished IAW USCG approved procedures and not included in a FAA repair station authorization, each component returned after repair shall be tagged with a DD Form 1574 Serviceable Condition Code Tag, completed in its entirety. Each repaired component returned to ALC must be tagged with a FAA Form 8130-3 Airworthiness Approval Tag, EASA Form 1, or DD Form 1574 Serviceable Condition Code Tag, completed in its entirety. This form shall be packaged with each component. FAILURE TO SUBMIT THE APPROPRIATE CERTIFICATES WILL RESULT IN NON-ACCEPTANCE OF THE DELIVERED ITEM. All non-accepted items will be returned to the Contractor at the Contractor’s expense.

3.7 Replacement Parts. Parts of a component found to be in a serviceable condition as a result of inspection and functional testing shall be reused. Missing parts and parts found to be defective or that require replacement by manufacturer’s instructions shall be replaced with parts meeting the manufacturer’s specifications and drawings. Replacement parts shall be new. Repair of all items shall be IAW the CMM. The cost for parts that are replaced systematically during repair shall be included in the fixed repair price listed in the schedule as contract line item number (CLIN) 0001 and subsequent Option Period CLINs.

3.8 Separately Priced Replacement Parts. The Contractor may designate certain high cost infrequently used parts as separately priced replacement parts prior to contract award. If these parts require replacement during repair authorization will be made by modification to the task order for use of the Separately Priced Replacement Part(s) or provide disposition instructions as necessary. The Contractor shall notify the KO within ten (10) calendar days after receipt of the components(s) when any of the separately priced replacement parts specified in the Schedule are required. The Government reserves the right to provide separately priced replacement parts as Government Furnished Material on an as-needed basis. The delivery schedule will be adjusted accordingly for any delay associated with requesting and obtaining the approval to utilize the specified separately priced replacement part(s). The separately priced replacement parts for these Hover Landing Light repairs are listed under CLIN 0003 and subsequent option period CLINs.

4.0 DOCUMENTATION

4.1Contractor Verification of Receipt of Components. Within five (5) working days following receipt of component(s), the Contractor shall provide written notification of the following to D05-DG-ALC-SRR-SUPPLY@uscg.mil:
a. Date of receipt of components(s);
b. Confirmation of serial number(s) (S/N) received; and
c. Applicable Task Order and line item number

4.2 Failure Data Report. The Contractor shall submit a failure data report for each repaired component (including when no fault is found), which shall be attached to the packing slip and shipped with the repaired component. This report shall include National Stock Number (NSN), P/N, S/N, nomenclature, date of repair, contract number, task order number, line item number, description of the repair failure, the Government’s reported failure, and a listing of parts replaced. The Contractor’s in-house work order may be used to satisfy this requirement if it includes the information requested above.

4.3 Replacement Parts Summary. Upon request by the KO, the Contractor shall submit electronically a summary listing all replacement parts utilized in the repair of each component. The replacement parts listing shall include the contract number, task order number, Contractor's work order number, component S/N, nomenclature, replacement parts listed in numerical order and quantity of each used.

4.4. Significant Component History Report (SCHR). The SCHR records the maintenance history of S/N tracked components. The SCHR remains with its corresponding part until reinstalled on an aircraft or annotated “BER” and returned to the address specified in section 12.1. The SCHR for scrapped components shall be returned with the component. The Contractor shall retain a copy of the SCHR for ninety (90) working days.

4.5 Component Repair Report (CRR). The CRR records the maintenance performed on S/N tracked components by the Contractor and enrolls or removes components from ACMS when those components are scrapped, added to or removed from the USCG parts inventory. The Contractor is required to use the CRR provided with the component. Within five (5) working days following issuance of a Certificate of Conformance, one (1) copy of the CRR shall be emailed to the Contract Specialist administering the contract. The original copy of the CRR shall be packed with the component for return to the USCG. The Contractor shall retain electronic copies of the CRRs for the life of the component. The Contractor may request that their failure data report, described in section 4.2, be accepted to fulfill the CRR requirement.

4.6 Publications/Updates. Contractors must be able to prove possession of an updated copy of all applicable OEM-approved CMMs for components listed in the schedule as part of their quote. The CMMs shall reflect the latest procedures used in the repair of components. If the contractor determines that current procedures detailed in the CMM should be changed, two (2) copies of recommended changes shall be submitted to the USCG for review and approval/disapproval. The Contractor shall continuously update all applicable CMMs during the life of the contract. The Contractor shall submit revisions to CMM to the USCG within thirty (30) working days of receipt.

5.0 UNUSUAL DAMAGE

5.1 The USCG intends that all components specified in the schedule will be shipped for repair within the firm-fixed prices established in the resulting contract. Occasionally, components may be received in a condition outside the confines of the CMM. Those components may be determined Unusually Damaged. In order to be determined Unusually Damaged, a component must be received for repair and upon evaluation any one of the following conditions are discovered:

Obvious misuse Missing piece parts

Crash damage
Acts of God

Only components meeting one or more of the above criteria may be considered as Unusually Damaged. Missing piece parts does not include the parts that are to be systematically changed out per the CMM; the USCG shall not be charged for these parts. All other components shall be repaired IAW the fixed repair price established in CLIN 0001 of the Schedule.

5.2 Unusual Damage Reporting Requirement. When a component is processed for Unusual Damage Evaluation, the Contractor shall notify the KO in writing within fifteen (15) working days.

5.3 Unusual Damage Evaluation. The Government may request the Contractor to submit an inspection condition report, pictures of the damage, and a repair quote listing all parts and labor needed to return the component to serviceable condition that meets CMM specifications. The quote shall include the task order number, line item number, NSN, P/N, and S/N of the component. The hourly labor rate shall be charged at the firm-fixed rate established in the Schedule under CLIN 0004 and subsequent Option Period CLINs. The quote shall not include the work involved in the teardown and inspection, which will have already occurred, as this is covered by the firm-fixed price specified under CLIN 0001 and subsequent Option Period CLINs in the Schedule.

The Contractor’s delivery obligation shall stop from the date of notification that an item has been determined to be a candidate for “Unusual Damage Evaluation.” The delivery obligation will be specified in the task order modification and will apply only to those items specifically addressed by the modification. The Contractor is obligated to deliver all other components not individually addressed by the modification under the original delivery date specified on the task order.

The KO shall either initiate negotiations for a firm-fixed repair price with the Contractor or if repair is not desired provide disposition instructions for the component. Authorization to proceed with repair work or disposition instructions if repair is not authorized shall be given via issuance of a task order modification. If a component is returned to the USCG in a disassembled condition, the Contractor shall be entitled only to the T&E Fee established in the Schedule of Supplies/Services under CLIN 0002 and subsequent Option Period CLINs.

6.0 TECHNICAL SUPPORT

6.1 Technical Support. The Contractor shall maintain a permanent presence in the United States, staffed with qualified, English speaking technical support personnel. The Contractor shall provide answers to basic questions from Government engineers at no additional cost to the Government. The Contractor shall provide up to ten (10) man-hours per quarter of technical support labor at no additional cost to the Government. In the event that a requested task cannot be completed within ten (10) man-hours per quarter, the Contractor shall immediately notify the KO and provide a preliminary estimate of the time and costs required for completion. This support shall be required throughout the contract period of performance. The Contractor will be responsible for tracking man-hours each quarter.

6.2 Technical Support Services. Upon receipt of a request for quote for a specific task, the Contractor shall prepare and submit a quote to the KO. This quote shall include a breakdown of hours, materials, and other costs associated with performance of the task. The labor rate in the Schedule (CLIN 0005 and subsequent Option Period CLINs) for technical support services will apply. Specific deliverables will be identified on individual task orders.

6.3Product/Engineering Changes. The Contractor may develop designs and/or processes that will improve the reliability, maintainability, or operational performance of the Hover Landing Light components. These may be provided to the KO for consideration and approval. A quote shall also be provided that reflects the contractor’s costs and an incremental charge to be assessed each time the product change is incorporated into the component. The quote shall include a breakdown of labor hours, material, and other costs. The labor rates will be as specified in CLIN 0006 and subsequent Option Period CLINs. Authorization for the contractor to incorporate the change will be by a modification to the contract and applicable task orders. The Contractor shall not incorporate proposed product changes prior to receipt of written authorization from the KO.
6.4Parts Manufacturer Approval (PMA). A certificate of conformity shall be required for all prototypes and spares provided Delivery Orders against this contract. The certificate shall be signed by an authorized official of the approved source and shall specify the nomenclature, manufacturer’s P/N, and date of manufacture. For Production Approval Handler, a certificate of conformity AND a copy of the FAA PMA or other manufacturing authority shall be provided. Their certificate shall be signed by an authorized official representing the approved source and shall specify the manufacturer’s P/N and date of manufacture. Final potential PMA authority must be submitted and approved to the USCG SRR Engineering Technical Services for approval before they will be authorized for use.

6.5 Service Bulletins. The Contractor shall provide an electronic copy of all service bulletins to the KO within three (3) working days of receipt of service bulletins (or other instructions) that may affect Government components. The KO will notify the Contractor in writing when incorporation of mandatory or optional service bulletins is required. Within thirty (30) working days following receipt of notification from the KO, the Contractor shall submit a detailed quote for incorporation of service bulletin(s). This quote shall include a listing of replacement parts and/or materials required, the time needed to effect the modification, a price breakdown of each part, and the number of labor hours required. The Government will normally incorporate all mandatory service bulletins. The labor rate will be as specified in the Schedule as CLIN 0007 and subsequent Option Period CLINs.

7.0 QUALITY ASSURANCE PROVISIONS

7.1 Responsibility for Inspections and Tests. The Contractor shall establish an inspection system IAW FAA and/or DOD procedures for all components. The Government reserves the right to review the Contractor operation and/or facilities at any time during the period of the contract.

7.2 Testing. The Contractor shall ensure that the acceptance testing required for repaired components include verification of repair of the fault for which it was returned and other testing as required to verify RFI status. The Contractor shall provide a copy of their ATP to the Government for review with their quote. Acceptance testing for repaired Hover Landing Light systems shall be conducted IAW the Government reviewed ATP. The Contractor shall make available to the Government all acceptance test results and, as applicable, discrepancy reports with corrective actions taken for each Hover Landing Light component. The ATP may be incorporated into the manufacturer’s publications.

7.2.1 Changes to Repair Test Procedures. The Contractor shall provide written notification to the KO no later than fifteen (15) working days following changes to applicable OEM Repair ATPs. The Government reserves the right to verify that the Contractor’s procedures are adequate to ensure the delivery of RFI parts.

7.3 Quality Control System. The Contractor is required to be certified and maintain a quality system that complies with the requirements of International Organization for Standardization (ISO) 9001 Quality Management Systems – Requirements, Aerospace Standard AS9110, or equivalent. The Contractor is responsible for performing or assuring all inspections, tests, and calibration necessary to substantiate that the goods or services furnished conform to USCG’s requirements. The Contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements. Records of conformance shall be maintained on file at the contractor’s facility and made available or provided for review by USCG upon request. USCG reserves the right to conduct surveillance at the Contractor’s facility to verify the existence, adequacy, and effectiveness of the quality system. Upon request of USCG, the Contractor shall forward a copy of their current certification and Quality Assurance Manual for review.

7.4 Inspection and Acceptance. Inspection and acceptance shall be performed at destination by Government personnel for count, condition and properly completed documentation. Components determined to be non-RFI upon installation may be returned to the Contractor with a Product Quality Deficiency Report (PQDR) for repair at no additional cost to the Government. Inspection and acceptance deficiencies may delay or cause rejection of invoice payments. Equipment found to have operational deficiencies will be reported on standard form "SF 368", PQDR, to the Contractor for investigation. The Contractor shall report findings of the investigation to the KO, within twenty (20) business days after receipt of the component.

7.5 PQDR. Repaired Hover Landing Light units found to have deficiencies will be returned to the Contractor for investigation under a no-cost warranty repair task order per CLIN 0008 and subsequent Option Period CLINs. The task order will include a copy of the PQDR outlining the component deficiency. The Contractor shall report findings of the investigation to the KO within fifteen (15) business days after receipt of the component. If agreed upon between parties that the component’s deficiencies are not related to previous repairs completed by the Contractor, the Contractor’s report of findings shall include a detailed quote that includes a complete breakdown of parts and labor necessary to return the component to serviceable condition. The KO will either initiate negotiations for the work or accept the Contractor’s quote and issue a modification to the task order authorizing and incorporating pricing for the repair work. The terms and conditions of the base contract including delivery obligations shall apply to all no-cost warranty repair task orders.

7.6 Requirements for Supplier Changes.

7.6.1 The Contractor shall, immediately upon discovery, notify and disclose conditions to the KO of any event, supply change, material change, supply malfunction, counterfeit/suspect parts or materiel, defect or non-airworthy condition of any product, component, or repaired item found to potentially cause non-conformity to the original specifications of this contract. The Government reserves the right to inspect any non-conforming product or component. Therefore, the Contractor shall obtain written approval from the KO prior to the disposition of any non-conforming product or component.

7.6.2 The Contractor’s quality control manual shall address in detail the Contractor’s risk management, test, inspection, non-conforming product and counterfeit/suspect parts processes.

7.6.3 The Contractor shall immediately notify the KO of any changes that potentially have an impact on the product. Changes may include but are not limited to products, processes, materiel, supplier sources, manufacturing facility location, or personnel qualifications.

Upon notification of the change, the KO will approve or deny the change. Facility location changes may require the Government to perform a facility inspection. The Contractor shall allow the Government access to all applicable areas of the Contractor’s facilities to ensure compliance with contractual requirements. In the event that the change is not approved by the USCG, the contract or task order may be cancelled/terminated IAW the FAR.

7.6.4 The Contractor shall retain all records IAW FAR 4.7, Contractor Records Retention. The Contractor shall be required to permit Government access to applicable records retained at any level of the supply chain.

7.6.5 Unless otherwise specified, the Contractor shall flow down all requirements in this contract to their supply chain, to include all subcontractors and suppliers.

8.0 SPECIAL INSTRUCTIONS

8.1 Accelerated Turn-Around-Time and Delivery. Only the KO may request and authorize an accelerated turn-around-time and delivery if needed by the Government for delivery to the USCG, ALC Receiving Department, Weeksville Rd., Elizabeth City, NC 27909. In the event an accelerated turn-around-time and delivery is needed, which the Contractor can meet, the Contractor shall be entitled to compensation for additional labor hours and expedited freight costs necessary to complete performance earlier than the turn-around-time and delivery schedule established in the Contract. After receiving a written request from the KO for an accelerated turn-around-time and delivery, the Contractor shall provide a written response within one (1) business day advising if an accelerated turn-around-time and delivery can be accomplished and include any additional costs necessary for the accelerated performance. Accelerated performance may be authorized in writing via a task order modification. If the Contractor accelerates turn-around-time and delivery on its own initiative in order to meet the delivery schedule established in the contract task order, the additional costs are not recoverable from the Government.

8.2 Aircraft on Ground (AOG) Situations. An AOG situation necessitates a special schedule and requires accelerated repair completion and expedited delivery to the applicable USCG Air Station. In the event an AOG status occurs as a result of a lack of any of the components specified in the schedule, the Contractor will be notified by the Government in email or by phone of the AOG situation and the applicable USCG Air Station and will be requested to provide a written response within twenty-four (24) hours of the request. The Contractor’s response shall provide 1) status of the component(s) needed to satisfy the AOG condition that includes what USCG items in-house for repair are closest to completion under normal working conditions and 2) an estimate of the labor hours needed to accelerate repair completion. The accelerated repair work will be authorized via a task order modification in conjunction with mutually agreed upon prices, delivery, and shipping costs reimbursement for next day delivery to the applicable USCG Air Station.

In the event of an AOG situation, the task order and applicable task order CLIN will be modified to reflect the USCG Air Station’s delivery address and the applicable USCG Requisition Number. The Contractor shall be required to ensure the Requisition Number is included on shipping/delivery tickets so that the Material Receipt can be processed by the applicable USCG Air Station receiving personnel.

8.3 Aircraft Accidents and Incidents. Disposition of evidence, including Hover Landing Light components, involved in aircraft accidents or incidents shall be IAW current Government investigation procedures. These procedures are IAW and at the direction of the National Transportation Safety Board whose rules and regulations delegate to the Government such authority as is appropriate. Contractor participation in these proceedings will be determined by the president of each accident or incident board and directed by the KO. Investigations of Hover Landing Light failures undertaken outside of formal proceedings will be a cooperative effort between Contractor and the Government.

9.0 WARRANTY

The Government may accept the Contractor’s standard commercial warranty for repairs. All assets returned under warranty shall be tested IAW Section 7.2. The warranty shall begin from the date the component is installed on the aircraft and extend for twelve (12) months after installation, unless corrosion or damage is found on the outside of the component.

10.0 PERIOD OF PERFORMANCE

The period of contract performance includes a one (1) one-year base period and, if exercised, four (4) one-year option periods.

11.0 FREIGHT ON BOARD (FOB) POINT

The preferred FOB point for shipments under this requirement is FOB Destination. Quotes submitting FOB Origin terms should include all applicable customs, duties, taxes, and shipping charges in their quote.

12.0 SHIPPING INSTRUCTIONS

12.1 Contractor Shipments. Unless otherwise specified on individual task orders issued hereunder, deliverable items shall be shipped to the following address:

USCG ALC
Receiving Section, Building 63
Elizabeth City, NC 27909-5001
Contract Number: (to be determined at time of award)
Task Order Number: (to be assigned at time of issuance)

12.2 Packaging and Preservation. All components and parts covered under this contract shall be stored and shipped in Contractor-provided shipping containers. Any damage sustained during shipment/handling/storage of the components due to Contractor's improper maintenance/packaging and preservation of the container, shall be the responsibility of the Contractor. Any exposed components shall be additionally wrapped for preservation.

12.2.1 Articles shall be packed and shipped per MIL-STD-2073-1 or American Society for Testing and Materials equivalent, in a manner that will accommodate shipping environments normally encountered within the commercial distribution system and ensure safe transportation at the lowest rate to the point of delivery. Each line replaceable unit shall have its own shipping container. Packaging material shall not consist of popcorn, shredded paper, Styrofoam or any type, or peanut packaging.

12.3 Marking Instructions. All shipping containers/packages shall be marked for delivery IAW the contract or task order. All parts and assemblies, which require special care during packing, handling or shipping shall be identified and marked appropriately. A copy of the packing slip shall be affixed to the exterior of the package or shipping container and shall contain the following information:

Nomenclature

NSN

Contract Number Task order/Item Number S/N Contractors P/N Contractor’s Name and Address Assembly date for new components

12.3.1 All items returned as BER IAW section 3.4 shall also be clearly marked “BER”.

13.0 DELIVERY REQUIREMENTS

13.1 Required Delivery Schedule. The required Delivery Schedule is as follows:

CLIN 0001 and respective option CLINs: no later than sixty (60) calendar days after receipt of task order and components.

CLIN 0002 and respective option CLINs: no later than thirty (30) calendar days after receipt of the task order and components.

CLIN 0003 and respective option CLINs: separately priced replacement parts shall be addressed as needed for each task order issued.

CLINs 0004-007 and respective option CLINs: Quotes as needed.

CLIN 0008 and respective option CLINs: no later than fifteen (15) calendar days after receipt or the task order and components.

Note: Early deliveries are accepted and encouraged at no additional cost to the Government.

14.0 CONTRACT ADMINISTRATION

14.1 Administration Information. This contract will be administered by USCG, ALC, SRR Contracting Branch, Elizabeth City, NC.

14.2 Ordering Office. The following activity is the only unit authorized to place task orders under this contract:

Contracting Officer

USCG ALC, SRR

Elizabeth City, NC 27909-5001

14.3 Contract changes. All requests for contract changes must be submitted in writing to the KO. Changes to the contract may be made only by written agreement of the parties via the form of a contract modification signed by the KO.

15.0 CONTRACTOR’S ADDRESS OF CORRESPONDENCE

All correspondence, except as otherwise specified, for the Contractor shall be directed to the following address:

TO BE DETERMINED AT CONTRACT AWARD.

16.0 INVOICE SUBMISSION

Invoices shall be submitted IAW FAR 52.212-4 to either ALC-Fiscal@uscg.mil or mailed to the designated billing office for payment as noted below. The Contractor is HIGHLY encouraged to submit invoices electronically to ALC-Fiscal@uscg.mil.

Chief, Fiscal Branch
USCG ALC
Fiscal Branch, Building 63
1664 Weeksville Road
Elizabeth City, NC 27909
Contract no. (To be assigned at time of award)
Task Order no. (To be assigned at time of issuance)

16.1 All payments will be made electronically IAW FAR 52.232-33. The Contractor may submit invoice five (5) business days after shipment of items. The invoice will not be approved until all items have been receipted.

File details come from the government source that posted it. Updated .