DEPARTMENTOFTHEAIRFORCE
56THCIVILENGINEERINGSQUADRON(AETC)

LUKE AIR FORCE BASE, ARIZONA

U N

ITED STATES OF A

ME

RI

CA

D E P A R

TM

ENT OF DEF

E N S E

STATEMENT OF WORK

Reseal Walls Bldg. 995

Luke Air Force Base, Arizona

June 23, 2020

1. OVERVIEW

The purpose of this project is to provide a water proof seal to building 995 so no water can enter the walls. This will prevent moisture entering from the wall that would cause mildew or possibly mold.

2. DESCRIPTION OF WORK

2.1. This project includes all necessary demolition, construction and testing to perform work as listed in description of work below.

2.2. Performance Period: all work shall be completed within 30 calendar days after the Notice to Proceed is issued.

2.3. Building 995 contractor will remove the fasteners in the metal siding to approximately 4 feet.

2.4. Contractor shall reseal termination bar using an approved urethane caulking and install a Z metal flashing over the termination bar.

2.5. Hazardous Material Abatement: Asbestos (ACM) report is provided in the response to RFP0001. Lead based paint (LBP) surveys will be provided when completed.

2.6. Structural

2.6.1. Pre-Application

2.6.1.1. Contractor shall remove all metal siding approximately 4 ‘ up

2.6.1.1.1. Contractor will re-seal termination bar using approved urethane caulking

2.6.1.1.2. Contractor will schedule work as to minimize and not disturb occupants in the building. Work hours are 0800-1600 Monday-Friday. All rooms shall be masked off so no material will interfere with workers that are present.

2.6.2. Application

2.6.2.1. Contractor shall remove all metal siding approximately 4 ‘ up

2.6.2.2. Contractor will re-seal termination bar using approved urethane caulking

2.6.2.3. Contractor shall install a Z metal flashing over the termination bar

2.6.2.4. Contractor shall verify all dimensions during the site visit.

2.6.2.5. For building 995 and peripheral structures indicated on site map:

2.6.2.6. Contractor shall provide at the minimum 2-year parts and labor warranty.

3. GOVERNMENT FURNISHED INFORMATION, PROPERTY, OR SERVICES

3.1. Upon the Contractor’s request, the Government will provide electronic and/or hard copies of available documents and correspondences pertinent to the work.

4. GENERAL INFORMATION

4.1. GENERAL

The contractor shall furnish all materials, equipment, and personnel necessary to design, manage, and accomplish the project. The Contractor shall thoroughly review the request for quotes for constructability and advise the contracting officer of potential problem areas prior to submitting an offer. No alterations, additions or deletions shall be made unless prior written approval is given by the contracting officer. Under no circumstances is the Contractor to begin any work on the project until a Notice to Proceed is issued by the Contracting Officer. The Contractor is responsible for any damage caused by the application of the paint, and shall take measures to minimize overspray.

4.2. SITE VISIT

The Contractor shall inspect the site where services are to be performed. This site review shall satisfy the Contractor’s need to identify all general and local conditions that may affect the cost of the contract. Failure to inspect the site will not constitute grounds for claims after contract award. This site visit will be conducted on 30 June 2020 beginning at 9:00am MST. The location is on Luke AFB, AZ, if the contractor does not possess a base pass then the contractor will need to coordinate an escort through the Contracting Officer no later than 30 June 2020 at 7:00am MST.

4.3. REQUIRED SUBMITTALS

4.3.1. The contractor shall provide an electronic copy of all warranty information to the Contracting Officer upon completion of performance.

4.3.2. Contractor shall submit on Luke AFB Form 317 Contractor’s Reporting Environmental Entry Form all products used on this project. These items will be tracked monthly and reports will be turned into Ms. Teri Wesley at the Hazmat office phone number (623) 856- 4748 or 4749.

4.3.3. The government reserves the right to request submittals on any product or service for duration of the contract.

END STATEMENT OF WORK

File details come from the government source that posted it. Updated .