Attachment 2 Statement of Work - 1240LU23R0019 CWZ Toilet Rep Projects 1DT_1BF_1DX.docx

DOCX document 233 KB Posted

Attached to
CWZ Toilet Rep Projects 1DT, 1BF, 1DX
Solicitation number
1240LU23R0019_
Issued by

About this file

This statement of work document outlines the scope of work for a construction contract to replace and install vault toilets at five recreation sites on the Custer Gallatin National Forest. The contract will involve demolishing and disposing of existing toilets, excavating and backfilling for new toilets, installing aggregate surfacing and wood edging for accessible pathways, placing boulders and signage, and other site work. Specific tasks include removing one double and four single toilets, installing two single toilets at West Boulder Campground, two at Battle Ridge Campground, and one each at three other locations. The contract is valued between $100,000-$250,000 and has a 90-day period of performance allowing one 14-day work window per site starting in fall 2023. The solicitation was issued by the US Department of Agriculture Forest Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Forest Service-Region One Custer Gallatin National Forest Bozeman and Yellowstone Ranger Districts

STATEMENT OF WORK

GAOA Central West Zone Toilet Replacement Projects 1DT, 1BF and 1DX

Cottonwood-Trespass Trailhead

PROJECT LOCATION

Bracket Cr. Trailhead

PROJECT LOCATION

Battle Ridge Campground

PROJECT LOCATION

Wapiti Cabin

PROJECT LOCATION

West Boulder Campground

PROJECT LOCATION

C.1 PROJECT SCOPE

C.1.1 Intent of Contract – The intent of the contract is to provide for the construction and completion of the work described below. The precise details of performing the work are not stipulated, except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

C.1.2 Description of Work – This project is for the demolition and installation of vault toilets at recreation sites on the Custer Gallatin National Forest, and associated earthwork, pathways, aggregate surfacing, boulder placement, demolition and disposal.

Remove toilets:

-One double toilet at West Boulder Campground -Four small single toilets at Battle Ridge Campground -One single toilet at Wapiti Cabin Install toilets:

-Two single toilets at West Boulder Campground -Two single toilets at Battle Ridge Campground -One toilet at Cottonwood Trespass Trailhead -One toilet at Bracket Cr. Trailhead -One toilet at Wapiti Cabin.

Schedule of Items Definitions:

MOBILIZATION - Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site.

TOILET DISPOSAL - Removal and disposal of existing concrete or wood toilet structure, vaults, and concrete walkways (concrete vaults shall be pumped before removal) TOILET SUPPLY - delivery and placement of new toilets in holes, (see plans; to be staked by Government prior to installation) TOILET INSTALLATION – Excavation, placement of base aggregate, and backfill of excavation after toilet installation.

WOOD EDGING – Work includes placement of pressure-treated 6” by 6” wood edging to retain gravel per plans, including installation of #6 rebar spikes and soil or aggregate placement outside of wood edging to secure wood edging in place. Perform an angle cut at 45 degrees on the ends of the wood edging toward the parking/roadway, and paint that cut face with preservative.

AGGREGATE SURFACING – Work will include linking the toilet to the campground road with an accessible compacted gravel path. Use Crusher Fines [Section 33 36 50, Section 2.02 (C)], gravel that is finely/well graded ½” minus, with some plasticity, so it can be compacted well. (Do not use sand or road chips – those cannot be compacted). Remove all surface vegetation and organic material and compact subbase. Compact gravel pathways to be at least 4” deep on top of compacted subsoil.

24" BOULDER INSTALLATION (GOV. PROVIDED) – Work includes scavenging boulders from within ½ mile of the site and placement of boulders set into the ground per plans. Government will designate boulders to be used and locations for placement.

TIRE STOP – Work includes installation of one blue-colored tire stop in front of toilet, as shown in the plans.

ACCESSIBLE RESERVED PARKING SIGN – Work includes installation of accessible parking sign and treated wood post as shown in the plans.

Contractor is responsible for all labor, materials, equipment, tools, etc. necessary to complete the work. All waste and excess materials generated from construction shall be disposed of off of Forest Service lands and in compliance with governing federal, state, and local laws.

C.1.3 Location: (See attached maps)

WEST BOULDER CAMPGROUND TOILET REPLACEMENT

Location: W Boulder Road, Mc Leod, Park County, Montana Coordinates: 45°32'50.4"N 110°18'26.9"W

WEST BOULDER CAMPGROUND NEW TOILET

Location: W Boulder Road, Mc Leod, Park County, Montana Coordinates: 45°33'01.1"N 110°18'27.6"W

BATTLE RIDGE CAMPGROUND TOILET REPLACEMENT

Location: Battle Ridge Campground Road, Bozeman, Gallatin County, Montana Coordinates: 45°52'58.20"N, 110°52'47.06"W

BATTLE RIDGE CAMPGROUND NEW TOILET

Location: Battle Ridge Campground Road, Bozeman, Gallatin County, Montana Coordinates: 45°52'53.15"N, 110°52'49.89"W

COTTONWOOD TRESPASS NEW TOILET

Location: Upper Cottonwood Creek Rd., Wilsall, Park County, Montana Coordinates: 46°00'52.0"N 110°25'13.5"W

BRACKET CREEK TRAILHEAD NEW TOILET

Location: Bracket Creek Rd., Bozeman, Gallatin County, Montana Coordinates: 45°51'30.6"N 110°52'45.2"W

C.1.4 Magnitude: $100,000 - $250,000

C.1.5 Site Tour - No site tour of the project will be conducted.

Prospective bidders wishing to visit the site on their own may obtain direction information by contacting Zac Hiedeman at the Forest Supervisor's Office, Custer-Gallatin National Forest, Bozeman, Montana, telephone (406) 587-6729.

C.1.6.Start Work - It is estimated that work will begin in Fall 2023.
C.1.7Period of Performance – Contract Time: Onsite work will be completed within in a 90-day. Contractor allowed one 14-day work window per site.
C.1.8Government Furnished Materials – Boulders shall be scavenged from within ½ mile of each site by contractor. Government will designate boulders for use.
C.1.9Submittals - The contractor shall submit copies of manufacturer’s installation instructions, plans and specifications, shop drawings, and warranty information to Contracting Officer prior to ordering material and start of work.

The contractor shall submit Work Schedule.

The contractor shall submit aggregate source, gradation / sieve analysis, and weed-free certification.

C.1.10Disturbances – No work shall be permitted on weekends or Federal Holidays, unless previously agreed to in writing.
C.1.11Staging Area - The Contractor shall coordinate with the COR on a staging area location. The Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing roads, parking lots, and landscaping.
C.1.12Potable Water- Potable water on-site at West Boulder Campground, Memorial Day – Labor Day. No potable water is available at Battle Ridge Campground and Cottonwood Trespass Trailhead. Potable water in the East Rosebud area can be found at the campground, Memorial Day – Labor Day.
C.1.13Wastewater Facilities – No facilities on site.
C.1.14Electrical – No electrical on site.

C.2 – CLEANUP AND DISPOSAL

C.2.1 Cleanup and Disposal – The Contractor shall be responsible for solid waste disposal. The Contractor shall at all times keep the area in a clean, neat, and orderly condition. Construction related debris, including but not limited to used motor oil, oil cans, grease cartridges and refuse shall be removed promptly from the site and disposed of in a lawful manner off National Forest System lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge.

C.3 – SECURITY AND PROTECTION

C.3.1 Security and Protection – Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The Contractor shall be responsible for all costs required to provide such protection.

The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.

C-4 – OTHER RELATED DOCUMENTS AND DRAWINGS

C.4.1The following CSI formatted specifications are part of this solicitation and any resulting contract.
Section
Description
01000
Mobilization
01025
Measurement and Payment
01400
Quality Control and Quantity Measurement
01 33 00
Submittal Procedures
01 77 00
Toilet Disposal and Site Cleanup
33 66 00
Concrete Vault Toilet
33 36 50
Excavation

image1.jpeg