Attachment 1 Schedule of Items - 1240LU23R0019 CWZ Toilet Rep Projects 1DT_1BF_1DX.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
CWZ Toilet Rep Projects 1DT, 1BF, 1DX
Solicitation number
1240LU23R0019_
Issued by

About this file

This document contains a schedule of items for a federal solicitation from the Department of Agriculture Forest Service seeking construction services for toilet repair projects at five campground locations on the Caribou-Targhee National Forest. The solicitation is divided into a base item and four option items corresponding to each of the five campground locations: Battle Ridge, West Boulder, Wapiti Cabin, Cottonwood-Trespass, and Bracket Creek. The schedule lists the estimated quantities and unit prices for various construction tasks at each location including toilet disposal, supply, and installation, as well as aggregate surfacing and boulder installation using government-provided materials. Pricing is to be provided by prospective offerors for evaluation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS

CLIN 0001 (Base Item)
ItemItem DescriptionUnitEst. QtyUnit PriceItem Cost
1MOBILIZATIONLSQ1$0.00
2BATTLE RIDGE TOILET DISPOSALEA4$0.00
3BATTLE RIDGE TOILET SUPPLYEA2$0.00
4BATTLE RIDGE TOILET INSTALLATIONEA2$0.00
5BATTLE RIDGE AGGREGATE SURFACINGCY3$0.00
6BATTLE RIDGE 24" ROCK
INSTALLATION (GOV. PROVIDED)EA4$0.00
BATTLE RIDGE SUBTOTAL:$0.00
CLIN 0002 (Option Item)
7MOBILIZATIONLSQ1$0.00EA – Each
8WEST BOULDER TOILET DISPOSALLSQ1$0.00LS – Lump Sum
9WEST BOULDER TOILET SUPPLYEA2$0.00CY – Cubic Yard
10WEST BOULDER TOILET INSTALLATIONEA2$0.00LF – Linear Foot
11WEST BOULDER WOOD EDGINGLF80$0.00
12WEST BOULDER AGGREGATE SURFACINGCY3$0.00
13WEST BOULDER 24" BOULDER
INSTALLATION (GOV. PROVIDED)EA7$0.00
14WEST BOULDER TIRE STOPEA1$0.00
15WEST BOULDER ACCESSIBLE RESERVED
PARKING SIGNEA1$0.00
WEST BOULDER SUBTOTAL:$0.00
CLIN 0003 (Option Item)
16MOBILIZATIONLSQ1$0.00
17WAPITI CABIN TOILET DISPOSALEA1$0.00
18WAPITI CABIN TOILET SUPPLYEA1$0.00
19WAPITI CABIN TOILET INSTALLATIONEA1$0.00
20WAPITI CABIN AGGREGATE SURFACINGCY2$0.00
21WAPITI CABIN 24" ROCK
INSTALLATION (GOV. PROVIDED)EA2$0.00
WAPITI CABIN SUBTOTAL:$0.00
CLIN 0004 (Option Item)
22MOBILIZATIONLSQ1$0.00
23COTTONWOOD-TRESPASS TOILET SUPPLYEA1$0.00
24COTTONWOOD-TRESPASS TOILET
INSTALLATIONEA1$0.00
25COTTONWOOD-TRESPASS AGGREGATE SURFACINGCY2$0.00
26COTTONWOOD-TRESPASS 24” BOULDER
INSTALLATION (GOV. PROVIDED)EA3$0.00
COTTTONWOOD

TRESPASS

SUBTOTAL:$0.00
CLIN 0005 (Option Item)
21MOBILIZATIONLSQ1$0.00
22BRACKET CR. TOILET SUPPLYEA1$0.00
23BRACKET CR. TOILET
INSTALLATIONEA1$0.00
24BRACKET CR. AGGREGATE SURFACINGCY2$0.00
25BRACKET CR. 24” BOULDER
INSTALLATION (GOV. PROVIDED)EA3$0.00
BRACKET CR.
SUBTOTAL:$0.00

Total Cost: $0.00

File details come from the government source that posted it. Updated .