Attachment 2 - STATEMENT OF NEED 9 OG Det 4.docx

DOCX document 139 KB Posted

Attached to
Large Multi-Spectrum Curtain
Solicitation number
FA468626Q0002
Issued by

About this file

This is a Statement of Need for Full Spectrum Mitigation Netting required by 9 OG Detachment 4 located at Andersen Air Force Base, Guam. The procurement involves one complete full-spectrum mitigation netting system and a mold container to be delivered to Building 18110, Arc Light Boulevard, Andersen AFB, GU 96929. The required netting consists of four panels measuring 18 feet by 24 feet and seven panels measuring 36 feet by 24 feet, totaling 298 feet wide by 24 feet high. The netting must provide visual and acoustic protection with full-spectrum mitigation capability, block light transmission, include grommets installed every 12 inches around all four edges of every panel, feature one solid white side and the lightest possible color on the reverse side, be flexible enough to collapse into a 10-foot storage space, and not exceed 800 pounds total weight. The contractor must provide a current Radio Frequency Interference (RFI) Mitigation Certification issued under the Ultra-Lightweight Camouflage Net System (ULCANS) Increment 1 Program and must coordinate delivery at least two weeks in advance during standard operating hours of Monday through Friday, 8 a.m. to 4 p.m. Chamorro Standard Time.

Contractor personnel must obtain base passes or be listed on an Entry Authorization List (EAL) submitted to Pass and Registration within two weeks of delivery, with all vehicles entering via the North Gate and all personnel required to present two forms of identification or REAL ID for base access. All contractor employees must comply with installation traffic regulations and local base policies regarding cellular phone operation. Installation services are not required as part of this procurement.

View the file

Other files

File Type Posted
Attachment 1 - Solicitation - FA468626Q0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF NEED

FOR

9 OG Detachment 4 Full Spectrum Mitigation Netting

A. BACKGROUND:

9 OG Det 4 is located at Andersen AFB, Guam. Due to Det 4’s location the environment can be harsh on the facilities and equipment. Our mission is to execute operations and sustainment, Tactics, Techniques, and Procedure development, and employment of the Common Mission Control Center within the Indo-Pacific theater. Our assigned building is a SAPF with old equipment prone to breaking which causes a security risk. Det 4 requires a fully secure SAPF facility within security regulations. A Full-Spectrum Mitigation Netting is required in case of faulty equipment.

B. SCOPE:

The Government requires the procurement and delivery one Full Spectrum Mitigation netting and a mold container to the 9 OG Det Andersen AFB, Guam. Installation will not be required.

This requirement consists of:

· Four (4) 18’ x 24’ netting panels

· Seven (7) 36’ x 24’ netting panels

C. REQUIREMENT:

Certifications:

· The Contractor shall provide a copy of a current Radio Frequency Interference (RFI) Mitigation Certification that has been issued under the Ultra-Lightweight Camouflage Net System (ULCANS) Increment 1 Program..

The netting shall meet the following minimum specifications:

· The netting shall provide visual and acoustic protection

· Full Spectrum Mitigation capability

· Block light transmission

· Netting must be 298’ wide and 24’ high or a combination of sizes to reach that goal

· Grommets need to be installed every 12 inches around all four edges of every panel

· One side must be solid white with other side being the lightest color possible

· Flexible enough to collapse into 10’ storage space

· Not exceed 800 pounds total

D. DELIVERY:

The contractor shall coordinate a delivery time with the Government Point of Contact (POC) identified in the inspect and accept information section of the contract at least two (2) weeks prior to anticipated delivery. Products shall be delivered within the hours listed below.

E. LOCATION & HOURS OF OPERATION:

The units standard operating hours are Monday-Friday 8 am – 4 pm Chamorro Standard Time. The location of operations will be Bldg 18110 Arc Light Blvd, Andersen AFB, GU 96929. The following Federal holidays are observed: 9 OG Det 4, Monday-Friday 8 am – 4 pm Chamorro Standard Time, Bldg 18110 Arc Light Blvd, Andersen AFB, GU 96929

F. ACCESS:

Contractor Manager or alternate shall complete an entry authorization list (EAL) for access to Andersen Air Force Base. The request shall be submitted within two (2) weeks of delivery to Pass and Registration via the Government Point of Contact (POC) identified in the inspect and accept information section of the contract. All contractor vehicles must enter the base via the North Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List (EAL) throughout duration of work performance. Any persons in the EAL are required to bring two (2) forms of identification or REAL ID to access the base.

G. TRAFFIC LAWS:

The contractor and their employees shall comply with all installation traffic regulations.

H. CELLULAR PHONE OPERATION POLICY:

The contractor shall comply with local base policies regarding cellular phone operation.

image1.png

File details come from the government source that posted it. Updated .