ATTACHMENT_2-_SPECIFICATIONS_MILL_CREEK_CAMPGROUND_1.pdf

PDF 1 MB Posted

Attached to
BLM-CO GFO MILL CREEK CAMPGROUND EXPANSION
Solicitation number
140L1725R0002
Issued by

About this file

These specifications detail the Mill Creek Campground Expansion and Improvement project for the Bureau of Land Management's Gunnison Field Office in Colorado. The project involves site work including road and parking area construction, precast concrete toilet installation, campsite construction, and bridge deck maintenance at a campground located in Hinsdale County. Key specifications include installing two precast CXT Incorporated Cascadian single vault toilets (one right-hand, one left-hand), constructing tent pads, fire rings, picnic tables, and a culvert, with work to be completed within 365 days of the Notice to Proceed. The project has a total small business set-aside with an estimated value between $250,000 and $500,000, situated at approximately 9,500 feet elevation with potential weather-related work interruptions.

The comprehensive specifications cover detailed requirements for each project component, including concrete specifications, earthwork, site furnishings, drainage utilities, and bridge timber wearing surface replacement. Specific requirements include using Colorado Department of Transportation standard specifications for aggregates, installing ADA-compliant site elements, using specific manufacturers like Pilot Rock for fire rings and picnic tables, and ensuring proper bedding, compaction, and installation techniques for all project components. The project emphasizes environmental controls, quality management, and photographic documentation throughout the construction process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior Bureau of Land Management

Gunnison Field Office Colorado

Mill Creek Campground Expansion and Improvement

SPECIFICATIONS

BLM Gunnison Field Office Mill Creek Campground Expansion and Improvement

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 12 00 ACCESS BRIDGE WEIGHT RESTRICTIONS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 46 00 QUALITY CONTROL

01 57 60 SUPPLEMENTAL ENVIRONMENTAL CONTROLS

01 80 00 PHOTOGRAPHIC DOCUMENTATION

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 20 00 SURVEY AND PROJECT STAKEOUT

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 30 00 BRIDGE TIMBER WEARING SURFACE REPLACEMENT

DI VI SI ON 12 - FURNI SHI NGS

12 60 00 PRECAST CONCRETE TOILET BUILDING

12 93 00 SITE FURNISHINGS

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORM DRAINAGE UTILITIES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

The work includes, but is not limited to; site work, road and parking area construction, precast concrete toilet installation, campsite construction, and bridge deck maintenance.

1.2 LOCATION

The project is located in Hinsdale County, Colorado. From Lake City, CO, travel south on CO-149, Turn right on County Road 30, travel approximately 11 miles, project location is on the left.

The work location can be found by searching "Mill Creek Campground" in Google maps.

1.3 WORK SCHEDULE

Work shall occur Monday - Friday, excluding federal holidays.

Work shall be completed within 365 days of the Notice to Proceed.

The project elevation is around 9500 feet. Weather (snow or snowmelt) may prevent work for several months of the year. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site.

1.4 PUBLIC SAFETY

The project will expand an existing campground. The existing campground will remain open to the public during the work. Contractor shall take precautions, as necessary, to protect the public from construction hazards.

1.5 CAMPGROUND CLOSURE

Campground closure will only be allowed as specified in 06 30 00 BRIDGE

TIMBER WEARING SURFACE REPLACEMENT.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 12 00

ACCESS BRIDGE WEIGHT RESTRICTIONS

PART 1 GENERAL

1.1 BRIDGE WEIGHT RESTRICTIONS

The site access bridge has weight restrictions.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Vehicles Not On The Truck Weight Diagrams ; G

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 WEIGHT LIMIT RESTRICTION

Vehicles shall weight less than, or equal to the weights shown on the "truck weight diagrams" at the end of this specification.

3.2 VEHICLES NOT ON THE TRUCK WEIGHT DIAGRAMS

Any vehicle configuration, including a crane, not shown on the "truck weight diagrams" shall be submitted for approval prior to crossing the bridge. Include in the submittal a diagram similar to the "truck weight diagrams". Include the number of axles, weight per axle, and axle spacing. The BLM may take up to 30 days to review the vehicle.

SECTION 01 12 00 Page 3

Truck Weight Diagrams

Section 01 12 00, paragraph 3.1, WEIGHT LIMIT RESTRICTIONS

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1 MOBILIZATION AND DEMOBILIZATION

1.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization.

When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.

When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.

Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.

1.1.2 Unit of Measure

Unit of measure: job.

1.2 PROJECT STAKEOUT

1.2.1 Payment

Payment will be made for all costs associated with surveying and staking out the work.

1.2.2 Unit of Measure

Unit of measure: Job.

SECTION 01 20 00 Page 4

1.3 DEMOLITION

1.3.1 Payment

Payment will be made for all costs associated with demolition. Including transportation and disposal.

1.3.2 Unit of Measure

Unit of measure: job.

1.4 CLEARING AND GRUBBING

1.4.1 Payment

Payment will be made for all costs associated with clearing and grubbing.

Including transportation and disposal of materials.

1.4.2 Unit of Measure

Unit of measure: Job.

1.5 SITE GRADING

1.5.1 Payment

Payment will be made for all costs associated with site grading, including moisture conditioning, and compaction.

1.5.2 Unit of Measure

Unit of measure: Job.

1.6 AGGREGATE BASE COURSE

1.6.1 Payment

Payment will be made for all costs associated with providing aggregate base course. Including preparation, transportation, placement, moisture conditioning, and compaction. Submit weight tickets.

1.6.2 Unit of Measure

Unit of measure: ton.

1.7 PRECAST CONCRETE TOILET BUILDING

1.7.1 Payment

Payment will be made for all costs associated with providing a precast concrete toilet building. Including preparation, transportation, bedding

SECTION 01 20 00 Page 5 material, installation, and backfill compaction.

1.7.2 Unit of Measure

Unit of measure: Each.

1.8 STEEL PARKING DELINEATOR

1.8.1 Payment

Payment will be made for all costs associated with providing steel parking delineators.

1.8.2 Unit of Measure

Unit of measure: Each.

1.9 CONCRETE PARKING STOP

1.9.1 Payment

Payment will be made for all costs associated with providing parking stops.

1.9.2 Unit of Measure

Unit of measure: Each.

1.10 FIRE RING

1.10.1 Payment

Payment will be made for all costs associated with providing fire rings.

Including foundations, gravel, and site preparation.

1.10.2 Unit of Measure

Unit of measure: Each.

1.11 ACCESSIBLE FIRE RING

1.11.1 Payment

Payment will be made for all costs associated with providing accessible fire rings. Including foundations, gravel, and site preparation.

1.11.2 Unit of Measure

Unit of measure: Each.

SECTION 01 20 00 Page 6

1.12 PICNIC TABLE

1.12.1 Payment

Payment will be made for all costs associated with providing picnic tables. Including grading, foundations, and aggregate surfacing around picnic tables.

1.12.2 Unit of Measure

Unit of measure: Each.

1.13 TENT PAD

1.13.1 Payment

Payment will be made for all costs associated with providing and constructing tent pads. Including the crusher fines and grading.

1.13.2 Unit of Measure

Unit of measure: Each.

1.14 FOOD STORAGE LOCKER

1.14.1 Payment

Payment will be made for all costs associated with providing a food storage locker. Including the concrete slab.

1.14.2 Unit of Measure

Unit of measure: Each.

1.15 SIGN POSTS - CAMPSITE IDENTIFICATION

1.15.1 Payment

Payment will be made for all costs associated with providing sign posts.

1.15.2 Unit of Measure

Unit of measure: Each.

1.16 TIMBER STAIR STEPS

1.16.1 Payment

Payment will be made for all costs associated with providing timber stair steps. Including aggregate and site work.

SECTION 01 20 00 Page 7

1.16.2 Unit of Measure

Unit of measure: Each.

1.17 CORRUGATED METAL PIPE CULVERT

Payment will be made for all costs associated with providing corrugated metal pipe culverts, including bedding material, earthwork, and compaction.

1.17.1 Unit of Measure

Unit of measure: linear foot

1.18 BRIDGE TIMBER WEARING SURFACE REPLACEMENT

1.18.1 Payment

Payment will be made for all costs associated with replacement of the bridge wearing surface. Including removal and disposal of existing wearing surface.

1.18.2 Unit of Measure

Unit of measure: Job.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00 Page 8

SECTION 01 32 01

PROJECT SCHEDULE

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Initial Project Schedule ; G

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.

3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS

3.2.1 Level of Detail Required

Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution.

3.2.2 Mandatory Tasks

Include the following activities/tasks in the initial project schedule and all updates.

a. Submission, review and acceptance of submittals.

b. Long procurement activities

c. Contractor's pre-final inspection.

d. Government's pre-final inspection.

e. Final inspection.

SECTION 01 32 01 Page 9

3.2.3 Government Activities

Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.

3.3 WEEKLY PROGRESS MEETINGS

Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.

3.4 FAILURE TO ACHIEVE PROGRESS

Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.

3.4.1 Failure to Perform

Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.

3.4.2 Recovery Schedule

Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.

SECTION 01 32 01 Page 10

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

1.2 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.

This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.

1.3 GOVERNMENT APPROVING AUTHORITY

The Contracting Officer's Representative will:

a. Note the date on which the submittal was received.

b. Review submittals for approval within 10 days of receipt. Except for the vehicle submittal which will be reviewed within 30 days of receipt.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.

1.3.1 Review Notations

Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with

SECTION 01 33 00 Page 11 appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.

1.4 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.5 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals is not to be construed as a complete check.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 12

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES

01 12 00 SD-01 Preconstruction Submittals

3.2 GVehicles Not On The Truck

Weight Diagrams

01 32 01 SD-01 Preconstruction Submittals

GInitial Project Schedule

01 46 00 SD-01 Preconstruction Submittals

1.2 GQuality Control (QC) Manager

01 57 60 SD-01 Preconstruction Submittals

3.4 GSpill Prevention And Cleanup

Plan

SD-11 Closeout Submittals

3.3 GPhotographic Documentation

03 30 00 SD-03 Product Data

2.2 GStructural Macro Synthetic

Reinforcing Fibers

06 30 00 SD-01 Preconstruction Submittals

1.3 GTemporary Bridge Closure

1.2 GBridge Closure Safety Plan

12 60 00 SD-03 Product Data

2.1 GPrecast Toilet Building

3.1 GManufacturer's Product

Specifications and installation instructions

12 93 00 SD-03 Product Data

2.2 GPicnic Tables

2.1 GFire Rings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES

12 93 00 2.5 GParking Stops

2.3 GFood Locker

31 00 00 SD-03 Product Data

2.1 GAggregate Base Course

SD-07 Certificates

3.8Aggregate Weight Tickets

33 40 00 SD-03 Product Data

2.1 GCorrugated Steel Pipe

2.2 GJoint

SD-11 Closeout Submittals

3.3 GPhotographic Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SECTION 01 46 00

QUALITY CONTROL

PART 1 GENERAL

1.1 QUALITY CONTROL

Contractor shall establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction.

Quality control (QC) is comprised of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements.

1.2 QUALITY CONTROL MANAGER

Provide a quality control (QC) manager at the work site to implement and manage the QC program. The QC Manager may also be the project superintendent.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Quality Control (QC) Manager ; G

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 QUALITY CONTROL

Contractor shall ensure that the construction complies with the requirements of the contract. At a minimum, perform the following prior to beginning work on each definable feature of work:

Review each paragraph of the applicable specification sections.

Review the contract drawings.

Verify that appropriate submittals have been approved.

Verify that the required preliminary work has been completed and complies with the contract.

Do not build upon nor conceal non-conforming work.

SECTION 01 46 00 Page 13

SECTION 01 57 60

SUPPLEMENTAL ENVIRONMENTAL CONTROLS

PART 1 GENERAL

1.1 DEFINITIONS

Equipment: for the purpose of this specification, equipment shall include, but isn't limited to; dozers, backhoes, trackhoes, trailers, graders, compactors, or any other construction equipment used to accomplish the work. Passenger vehicles are not considered equipment.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Spill Prevention And Cleanup Plan ; G

SD-11 Closeout Submittals

Photographic Documentation ; G

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 EROSION CONTROL

In addition to the requirements of the State of Colorado stormwater permits, contractor shall take measures, as necessary to control erosion. Contractor shall inspect site after rain (or melt) events and mitigate areas where erosion or sediment runoff is occurring. Erosion includes wind. Contractor shall water exposed soils, as necessary, to prevent wind erosion.

3.2 FIRE PREVENTION

All equipment shall have a spark arrester installed. The Contractor shall have a fire extinguisher and shovel readily available to contain and extinguish fires.

3.3 EQUIPMENT CLEANING AND MAINTENANCE

Equipment shall be cleaned prior to arriving on site. Equipment shall arrive on site free from dirt, debris, weeds, and seeds. All equipment shall be inspected by the Contracting Officer's Representative, on site, and prior to unloading. Notify the Contracting Officer's Representative at least 7 days prior to equipment delivery to coordinate inspection. If equipment leaves the jobsite, and returns at a later date, then equipment shall be re-inspected before reentering the work site.

SECTION 01 57 60 Page 14

Equipment maintenance will not be allowed on site. Equipment leaking fluids shall be removed from site.

Provide photographic documentation in accordance with section 01 80 00 .

Provide pictures demonstrating equipment is clean while the equipment is onsite, and prior to unloading.

3.4 SPILL PREVENTION

The Contractor shall submit a spill prevention and cleanup plan. The spill prevention and cleanup plan shall identify foreseeable accidents, including spills while adding fluids to equipment, and identify an action plan to rapidly clean all accidents. Cleanup materials and equipment shall be on site during work.

3.5 WASTE CONTROL

All waste generated by the work shall be contained and removed from the site and disposed of in a legal manor.

SECTION 01 57 60 Page 15

SECTION 01 80 00

PHOTOGRAPHIC DOCUMENTATION

PART 1 GENERAL

1.1 SUMMARY OF WORK

Document that the work is in compliance with contract requirements.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 PHOTOGRAPHS

Provide photographs in sufficient detail and quantity to demonstrate compliance with contract requirements. Submit electronic photographs via email. Photographs sent via text message will not be accepted.

Photographs do not negate requirements for Contracting Officer's Representative's inspections and approvals on specified items of work.

SECTION 01 80 00 Page 16

SECTION 02 20 00

SURVEY AND PROJECT STAKEOUT

PART 1 GENERAL

1.1 SECTION SUMMARY

The contractor shall stake out the project as detailed on the drawings.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 PROJECT STAKEOUT

The contractor shall stake out the project as detailed on the drawings, or as required for construction.

3.2 STAKEOUT REVIEW

The Contracting Officer's Representative and the Contractor shall review the layout, as staked, together. The Contractor shall build 15 working days into the project schedule for coordination of a meeting date that works for both the Contractor and the Contracting Officer's Representative.

The Contracting Officer's Representative may make minor modifications to the layout in order to minimize the damage to existing vegetation, or for constructability. The contractor shall receive approval of the stakeout prior to clearing and grubbing, or other earth disturbing activities.

SECTION 02 20 00 Page 17

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

Provide all materials and labor necessary to demolish and remove items as specified and as shown on the drawings.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 DISPOSAL OF REMOVED MATERIALS

All materials removed, shall become the property of the Contractor and shall be removed from Government property and disposed of in a legal manor.

SECTION 02 41 00 Page 18

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 305.1 (2014) Specification for Hot Weather Concreting

ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting

ASTM INTERNATIONAL (ASTM)

ASTM C387/C387M (2017) Standard Specification for Packaged, Dry, Combined Materials for Concrete and High Strength Mortar

NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)

NRMCA QC 3 (2015) Quality Control Manual: Section 3, Plant Certifications Checklist:

Certification of Ready Mixed Concrete Production Facilities

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Structural Macro Synthetic Reinforcing Fibers ; G

PART 2 PRODUCTS

2.1 CONCRETE

Provide concrete composed of portland cement, aggregates, water, and admixtures as specified.

2.1.1 STRENGTH

Compressive strength (f'c) shall be 3500 psi at 28 days.

2.1.2 Air Entrainment

Attain air content at point of placement between 4 and 6 percent.

SECTION 03 30 00 Page 19

2.1.3 SLUMP

Slump of the concrete, at the point of placement, shall be 4 inches or less.

2.1.4 PORTLAND CEMENT

ASTM C150/C150M, Type II.

2.2 STRUCTURAL MACRO SYNTHETIC REINFORCING FIBERS

Structural macro synthetic reinforcing fibers shall be Sika Fibermesh 650, or approved equal. Structural macro synthetic reinforcing fibers shall have a diameter greater than 0.3 mm and a length between 1 inch and 3 inches.

2.3 PREPACKAGED CONCRETE MIXTURE

Prepackaged concrete mix shall be identified as conforming to

ASTM C387/C387M

2.4 READY MIXTURE

Ready-mix plant equipment and facilities must be certified in accordance with NRMCA QC 3.

PART 3 EXECUTION

3.1 STRUCTURAL MACRO SYNTHETIC REINFORCING FIBERS

Provide 4 pounds of reinforcing fibers per cubic yard of concrete.

Incorporate into concrete mix as recommended by the manufacturer.

3.2 PREPACKAGED CONCRETE MIXTURE

Use the minimum amount of water to make the mixture. Adding too much water to the mixture will greatly reduce the overall compressive strength. Average slump shall be between 2" to 4".

3.3 CONCRETE CONSOLIDATION

Concrete shall be adequately vibrated, rodded, or spaded into place to fill voids.

3.4 COLD WEATHER REQUIREMENTS

Perform cold weather concreting in accordance with ACI 306.1 . Use special protection measures if freezing temperatures are anticipated before the expiration of the specified curing period. The ambient temperature of the air where concrete is to be placed and the temperature of surfaces to receive concrete must be not less than 40 degrees F. The temperature of the concrete when placed must be not less than 50 degrees F nor more than 75 degrees F. Heat the mixing water or aggregates to regulate the concrete placing temperature. Materials entering the mixer must be free from ice, snow, or frozen lumps. Do not incorporate salt, chemicals or other materials in the concrete to prevent freezing.

SECTION 03 30 00 Page 20

3.5 HOT WEATHER REQUIREMENTS

When job-site conditions are present or anticipated that accelerate the rate of moisture loss or rate of cement hydration of freshly mixed concrete, including an ambient temperature of 80 degrees F or higher, and an evaporation rate that exceeds 0.2 lb/ft2/h, conform concrete work to all requirements of ACI 305.1 .

SECTION 03 30 00 Page 21

SECTION 06 30 00

BRIDGE TIMBER WEARING SURFACE REPLACEMENT

PART 1 GENERAL

1.1 CRITERIA FOR BIDDING

Plan dimensions of the replaced wearing surface shall be 80 feet length, and a minimum width of 11'-3".

1.2 BRIDGE CLOSURE TO PUBLIC TRAFFIC

The bridge must remain open to public traffic May 26 through September 30.

Bridge closures shall be adequately notified to campers, and properly signed for public safety. Submit a bridge closure safety plan for approval if Contractor plans to close the bridge.

1.3 TEMPORARY BRIDGE CLOSURE

A temporary bridge closure, maximum of four hours per day, may, or may not be approved. Approval will depend on campground use, the contractor's notification of closure plan, and closure hours.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Temporary Bridge Closure ; G

Bridge Closure Safety Plan ; G

PART 2 PRODUCTS

2.1 WEARING SURFACE BOARDS

Wearing surface boards shall be 3" depth, 11.25" width, and 20' length, actual dimensions, not nominal dimensions.

Wearing surface boards shall be HEM-Fir or Douglas-Fir, #2 or better.

2.2 HARDWARE

Hardware shall be galvanized.

PART 3 EXECUTION

3.1 EXISTING WEARING SURFACE BOARDS - REMOVAL

Remove the existing wearing surface boards. Unscrew and remove hardware prior to removing the boards.

SECTION 06 30 00 Page 22

3.2 BRIDGE DECK CLEANING

After removing the existing wearing surface, clean the bridge deck.

Pressure wash the deck. Remove all dirt, dust, and debris.

3.3 BRIDGE DECK WOOD TREATMENT

Apply copper naphthenate wood treatment to the existing timber bridge deck prior to installation of the wearing surface boards. Take extra care to treat the holes left in the deck after removal of the wearing surface.

Apply wood treatment in accordance with the manufacturer's instructions.

3.4 WEARING SURFACE BOARDS

Install wearing surface boards as shown on the drawings. Countersink bolts. Stagger the joints as shown on the drawings.

SECTION 06 30 00 Page 23

SECTION 12 60 00

PRECAST CONCRETE TOILET BUILDING

PART 1 GENERAL

1.1 SCOPE

This specification covers the installation of two precast toilet buildings as manufactured by CXT Incorporated.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Precast Toilet Building ; G

Manufacturer's Product Specifications and installation instructions ; G

PART 2 PRODUCTS

2.1 PRECAST TOILET BUILDING

The precast toilet buildings shall be manufactured by CXT Incorporated.

CXT Incorporated Spokane Industrial Park 3808 North Sullivan Road, Building 7 Spokane, WA 99216 Phone 800-696-5766

2.1.1 MODEL

Two similar toilets are required, one right hand, one left hand.

1. Cascadian, single vault, right hand.

2. Cascadian, single vault, left hand.

2.1.2 TEXTURES AND COLORS

Both toilets shall have the following textures and colors.

Ext er i or Locat i on Texture Color

Lower Wall Horizontal Lap Siding nuss brown

Upper Wall Board and Batt Siding nuss brown

Roof Cedar Shake charcoal grey

SECTION 12 60 00 Page 24

2.1.3 WALL VENT LOCATION

Right hand toilet shall have the vent on the right wall, upon entering the toilet room.

Left hand toilet shall have the vent on the back wall, upon entering the toilet room.

2.1.4 ADDITIONAL BUILDING REQUIREMENTS

Supply (2) 3 roll paper holders, for a total of 6 rolls. Note: (1) 3 roll holder is standard, (2) 3 roll paper holders will require additional coordination with the manufacturer.

Install solar vent fan for each vent.

Install unisex signage.

2.2 PRODUCT REQUIREMENTS

The precast toilet building shall meet the following criteria.

2.2.1 Manufacturer Criteria

The manufacturer supplying the precast concrete vault toilet must meet the following:

A. Manufacturer must be ISO 9001 certified.

B. Manufacturing plant must be PCI certified.

C. Manufacturer must provide stamped, engineered drawings prior to acceptance.

D. Manufacturer must show four (4) examples of Sweet Smelling Technology designed precast concrete vault toilet facilities produced, installed, and in use as an example of their ability to perform.

E. Manufacture shall provide a twenty (20) year warranty.

F. UL 752 Bullet Resistance on 4" thick concrete samples.

2.2.2 Design Criteria

2.2.2.1 Roof Snow Load

Vault buildings are designed to withstand a 350 pounds per square foot snow load.

2.2.2.2 Floor Load

Vault buildings are designed to withstand 400 pounds per square foot floor load.

2.2.2.3 Wind Load

Vault buildings shall withstand the effects of 150 miles per hour (3-second gust) wind exposure C.

2.2.2.4 Earthquake

Vault buildings will withstand the effects of a seismic design category E earthquake.

SECTION 12 60 00 Page 25

2.2.2.5 Sweet Smelling Technology (SST)

Vault buildings shall incorporate design aspects of SST as outlined by Briar Cook for the U.S. Forest Service. All wall to floor interior surface seams shall have a minimum 1" radius coving made of high strength grout. The vault shall have a bottom slope of 1" per foot from under the toilet riser out to the outside cleanout area. The vault shall have a 24" diameter (minimum) lightweight manhole cover installed to the rear or side of the building. The manhole cover should be raised, with the surrounding concrete sloped away using a minimum slope of ½" per foot. The depth of the vault shall be no deeper than 4½' to 5'. A 12" diameter round pipe will be installed to vent the vault and the pipe shall be raised a minimum of 3' above the highest point of the roof. Vent pipe shall be straight up from the vault. There shall be only one vent opening in the building.

2.2.2.6 Additional Design Standards

Single vault buildings shall be an all concrete design with a minimum 7/12 roof pitch. Vault buildings shall have a minimum 4" wall, 4½" roof, and 5" floor thickness. Vault buildings shall have a one-piece floor unit to prevent panels that migrate in different directions during periods of freeze/thaw stress. Vault buildings shall have a one-piece full length and width vault unit to support the building, screen area, and snow loads evenly.

2.2.2.7 Concrete - Colored

The roof panels, building walls, and screen panels shall be colored concrete. Color shall match the existing concrete toilet building on site.

2.2.2.8 Doors - Steel

Doors are flush panel type 1¾" thick, minimum 16-gauge galvanized steel, top painted with DTM ALKYD.

Door frames are knockdown or welded type, single rabbet, minimum 16-gauge prime coated steel top painted with DTM ALKYD, width to suit wall thickness. Three (3) rubber door silencers are provided on latch side of frame. Three hinges (3) per door with dull chrome plating 4½" x 4½", adjustable tension, and automatic closing for each door. Dome style doorstop stop meeting ANSI 156.16. Provide door sweep at the bottom of door with an adjustable brush.

2.2.2.9 Grab Bars

Grab ars shall be 18-gauge, type 304 stainless steel with 1½" clearance.

Able to withstand 300-pound top loading.

2.2.2.10 Riser

Riser shall meet ADA standards, be constructed of molded one-piece HDPE polyethylene, and have a smooth surface and have high impact resistance at extremely cold temperatures.

2.2.2.11 Toilet Paper Dispenser

Toilet Paper Dispenser shall be constructed of ¼" thick, type 304 stainless steel, hold three (3) standard rolls of toilet paper.

SECTION 12 60 00 Page 26

Fastening system able to withstand 300-pound top loading.

2.2.2.12 Polyethylene Vault Liner

Polyethylene Vault Liner shall be made of a Roto molded 8460 polyethylene. Hold up to 1,000 gallons of waste. Minimum thickness .100.

2.3 CONTRACTOR PROPOSED SUBSITUTIONS

Contractor proposed substitutions to the precast toilet building specified shall be submitted with the bid. If proposed substitution doesn't meet the specifications, the bid will not be considered. If a bid is submitted without a proposed substitution, then the contractor shall install the precast toilet building specified.

PART 3 EXECUTION

3.1 INSTALLATION

Install the precast toilet building in accordance with the manufacturer's product specifications. The entire manufacturer's specification will be incorporated, including the excavation, elevation, backfill, compaction, and material requirements. A sand or aggregate bedding material shall be installed. Submit the manufacturer's product specifications and installation instructions , which will supplement this specification section.

3.1.1 Finish Floor Elevation and Slope

The finish floor elevation will be provided by the BLM. The contractor shall install the precast toilet building within 0.05 feet of the elevation provided. The precast toilet building shall be sloped between 1% and 1.5% to allow water to drain out of the interior of the building, through the door.

3.1.2 Backfill and Compaction

Backfill and compact in accordance with the manufacturer's product specifications. In addition to the compaction specified in the manufacturer's product specifications:

Backfill adjacent to the precast toilet building shall be placed in 8 inch, maximum, lifts and compacted with a whacker-type mechanical tamper or equivalent.

SECTION 12 60 00 Page 27

SECTION 12 93 00

SITE FURNISHINGS

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Picnic Tables ; G

Fire Rings ; G

Parking Stops ; G

Food Locker ; G

PART 2 PRODUCTS

2.1 FIRE RINGS

2.1.1 Accessible Fire Rings

Accessible fire rings shall be compliant with the American with Disability Act (ADA). Accessible fire rings shall be as manufactured by Pilot Rock.

www.pilotrock.com

Pilot Rock Fire Ring Model: M-32/17/PA

2.1.2 Fire Rings

Fire rings shall be as manufactured by Pilot Rock. www.pilotrock.com

Pilot Rock Fire Ring Model: FSW-30/9/PA

2.1.3 Anchors

Fire rings shall be anchored with three steel pins per ring and encased in concrete as shown on the drawings.

2.2 PICNIC TABLES

Fire rings shall be as manufactured by Pilot Rock. www.pilotrock.com

Extreme load rated accessible picnic table:

WXT series, WXT-C* Black (B)-8H* Brown (W) 8 foot length standard height steel frame: powder coated, black table and seat top: perforated, brown

SECTION 12 93 00 Page 28

2.3 FOOD LOCKER

As manufactured by "BearSaver". Model number: FS30-UP.

https://bearsaver.com

2.4 STEEL PARKING DELINEATORS

Steel parking delineators shall be schedule 40 steel pipe. Used pipe may be supplied; however pipe must be clean of excessive oil, grease, rust, etc. Pipe must be straight and have no dents, bends, or obvious defects.

2.5 CONCRETE PARKING STOPS

Parking stops shall be reinforced concrete. With minimum dimensions of;

six foot length, eight inch width, and 5 inch height.

2.6 TENT PAD AND STAIR TIMBERS

Tent pad timbers shall be 6 inch by 6 inch, pressure treated for ground contact.

2.7 TENT PAD AGGREGATE

Tent pad aggregate shall meet the following gradation:

Sieve Size % passing

1/2 inch 100%

#4 70% - 100%

#16 30% - 60%

#200 5%-15%

2.8 SIGN POSTS - CAMPSITE IDENTIFICATION

U-Channel sign posts shall be steel, 6 foot total length, have a 1-3/8" channel depth, 3/8" holes on 1" centers, and be painted brown.

PART 3 EXECUTION

3.1 FIRE RINGS

Grade the ground surface level prior to placing fire rings. Secure the fire rings to the foundations, three foundations per fire ring. Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE CONCRETE. Fire rings shall be placed in locations staked by the Contracting Officer.

Location shown on the drawings is approximate.

3.2 PICNIC TABLES

Grade the ground surface level prior to placing picnic tables. Place aggregate under and around the picnic tables as shown on the drawings.

Secure the picnic tables to the foundations, four foundations per table.

Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE CONCRETE. Picnic tables shall be placed in locations staked by the

SECTION 12 93 00 Page 29

Contracting Officer. Location shown on the drawings is approximate.

3.3 FOOD LOCKER

Provide concrete slab in accordance with section 03 30 00 CAST-IN-PLACE CONCRETE. Verify dimensions of food locker prior to forming concrete to ensure the food locker will fit on the concrete slab. Secure food locker to the concrete slab with concrete anchor bolts.

3.4 STEEL PARKING DELINEATORS

Steel parking delineators shall be installed as shown on the drawings.

Tops of the steel parking delineators shall be set three inches above the finished grade of the aggregate surfacing.

3.5 CONCRETE PARKING STOPS

Each parking stop shall be held in place with two (2) #4 rebars, 24 inches long.

3.6 TENT PADS

Level existing grade prior to installing timbers. Finish elevation of tent pad and crusher fines shall be level. Tent pads shall be placed in locations staked by the Contracting Officer. Location shown on the drawings is approximate.

3.7 LOCATION OF TIMBER STAIR STEPS

The location of the stairs shown on the drawings is preliminary. Exact location of the stairs will be finalized after the campsite grading is completed. The stairs may be distributed at multiple campsite locations.

However, the total number of steps required will remain as listed on the bid schedule.

3.8 TIMBER STAIR STEPS

Steps shall be level. Countersink hardware. Tops of bolts shall not protrude above the timber surface. Lap joints as shown on the drawings.

Provide aggregate in accordance with section 31 00 00 EARTHWORK. Moisture condition and compact the aggregate to provide a firm surface. Moisture condition and compact the material adjacent to the timbers to provide a firm surface.

3.9 SIGN POSTS - CAMPSITE IDENTIFICATION

Install sign posts plumb. Drive the posts 2 feet into the ground.

Install at locations staked by the Contracting Officer.

The contractor is not required to obtain, or install, signs for the sign posts.

SECTION 12 93 00 Page 30

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Aggregate Base Course ; G

SD-07 Certificates

Aggregate Weight Tickets

PART 2 PRODUCTS

2.1 AGGREGATE BASE COURSE

Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2022, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.

PART 3 EXECUTION

3.1 UNDERGROUND UTILITIES

The Contractor is responsible for locating underground utilities prior to construction. The Government is not aware of any underground utilities, however the Contractor shall verify the presence or absence prior to construction.

3.2 GENERAL EXCAVATION

Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times, including during construction.

3.3 EARTHWORK QUANTITIES

Cut (Cubic Yards) Fill (Cubic Yards) Net (Cubic Yards)

Road and Parking Areas

1090 730 360

3.4 GROUND SURFACE PREPARATION

Clear and grub in accordance with section 31 11 00 . Do not perform

SECTION 31 00 00 Page 31 construction when surfaces are covered in snow, frozen, or muddy. Prepare the subgrade to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Shape subgrade to drain.

3.5 CAMPSITE GRADING AREAS

Grade camping areas relatively flat, with slopes not exceeding 2 percent.

Camping areas include tent pads, picnic tables, fire rings, and food lockers.

3.6 VIBRATORY COMPACTION EQUIPMENT

Vibratory compaction equipment, used on roads and parking areas, shall have a minimum of 10,000 pounds impact per vibration and a minimum frequency of 1,000 vibrations per minute.

3.7 AGGREGATE PLACEMENT LOCATIONS

3.7.1 Subgrade

Contractor shall prepare the subgrade to the lines and grades shown on the plans.

3.7.2 Subgrade Compaction

Moisten material as necessary to achieve compaction. Compact the subgrade by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

3.7.3 Aggregate Base Course

Contractor shall receive approval of the subgrade prior to placing aggregate base course. Place base course aggregate to the lines and grades shown on the plans.

3.7.4 Aggregate Base Course Compaction

Moisten material as necessary to achieve compaction. Compact the base course aggregate by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.

3.8 AGGREGATE WEIGHT TICKETS

Submit aggregate weight tickets . Weight tickets are required prior to payment.

3.9 EXCESS MATERIAL DISPOSAL

Excess cut material shall be placed uniformly on site, at designated locations. Excess cut material shall not be removed from the work site.

3.10 FINISHING

Finish the surfaces to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.5 foot of the elevations indicated.

Finish surfaces in a manner that will result in effective drainage, SECTION 31 00 00 Page 32 regardless of tolerance.

3.10.1 STAKEOUT POINTS - SUBGRADE ELEVATIONS

There is a 0.5 foot tolerance on the subgrade elevations provided. The finish elevations may be altered to aid the earthwork. However, finish slopes shall generally match the slopes shown and never exceed the slopes shown.

3.11 TOILET AREA GRADING

The finish grade slopes from the toilets to the parking spaces adjacent to the toilets shall be less than 2 percent.

SECTION 31 00 00 Page 33

SECTION 31 11 00

CLEARING AND GRUBBING

PART 1 GENERAL

Not Used.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 SURVEY STAKE OUT

Prior to clearing and grubbing, the contractor shall stake out the roads and parking areas, as detailed on the drawings, in accordance with 02 20 00 SURVEY AND PROJECT STAKEOUT. The Contracting Officer's Representative will review the layout as staked and may make minor modifications to the layout in order to minimize the damage to existing vegetation. The contractor shall receive approval of the stakeout prior to clearing and grubbing.

3.2 CLEARING AND GRUBBING LIMITS

Clearing and grubbing limits shall be within the grading limits shown on the drawings.

3.3 PROTECTION

Protect trees and vegetation from damage incident to clearing, grubbing, and construction operations.

3.4 CLEARING

Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface.

3.5 GRUBBING

Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas.

Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 12 inches below the original surface level of the ground in the area of new road construction. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.

SECTION 31 11 00 Page 34

3.6 DISPOSAL OF CLEARING AND GRUBBING VEGETATION

Dispose of clearing and grubbing material in locations designated on the drawings. Logs, stumps, roots, brush, rotten wood, and other organic material resulting from the clearing and grubbing operations, shall be uniformly scattered on site in piles less than 18 inches off the ground.

Process, mulch, cut, or limb material as necessary to comply with disposal pile requirements.

SECTION 31 11 00 Page 35

SECTION 33 40 00

STORM DRAINAGE UTILITIES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A760/A760M (2015) Standard Specification for Corrugated Steel Pipe, Metallic-Coated for Sewers and Drains

ASTM A929/A929M (2018) Standard Specification for Steel Sheet, Metallic-Coated by the Hot-Dip Process for Corrugated Steel Pipe

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Corrugated Steel Pipe ; G

Joint ; G

SD-11 Closeout Submittals

Photographic Documentation ; G

PART 2 PRODUCTS

2.1 CORRUGATED STEEL PIPE CULVERT

ASTM A929/A929M Aluminum-coated, type 2 (Aluminized Type 2) coated pipe:

a. ASTM A760/A760M Type I (circular) pipe with helical 2-2/3 by 1/2 inch corrugations.

b. 14 gage (0.079 inches).

c. 18 inch diameter.

2.1.1 CULVERT QUANTITIES

One culvert is required.

SECTION 33 40 00 Page 36

Quantity Each Culvert Length (feet)

1 45

2.2 JOINT

ASTM A929/A929M Aluminum-coated, type 2 (Aluminized Type 2) coated joint.

ASTM A760/A760M , soil tight joint.

2.3 BEDDING MATERIAL

Bedding material shall meet the following gradation:

Sieve Size Percent passing

1 inch 100%

Number 4 20% - 65%

Number 200 0% - 10%

PART 3 EXECUTION

3.1 TRENCHING

The width of trenches at any point below the top of the pipe shall not be less than the outside diameter of the pipe plus 24 inches to permit thorough tamping of the bedding material under and around the pipe.

3.2 BEDDING

Provide bedding material. The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe.

3.3 JOINTING

Install joint in accordance with manufacturer's recommendations. Provide a soil tight joint.

Provide photographic documentation in accordance with section 01 80 00 PHOTOGRAPHIC DOCUMENTATION. Provide pictures demonstrating the joint is properly installed and bedded.

3.4 BACKFILLING

After the pipe has been properly bedded, selected material from excavation or borrow, at a moisture content that will facilitate compaction, shall be placed along both sides of pipe in layers not exceeding 6 inches in compacted depth. The backfill shall be brought up evenly on both sides of pipe for the full length of pipe. The fill shall be thoroughly compacted under the haunches of the pipe. Each layer shall be thoroughly compacted with mechanical tampers or rammers.

SECTION 33 40 00 Page 37

3.4.1 Backfill Material

Backfill material, within 12 inches of the culvert, shall be free of rocks or particles larger than 2 inches in diameter.

SECTION 33 40 00 Page 38

PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
1.2 LOCATION
1.3 WORK SCHEDULE
1.4 PUBLIC SAFETY
1.5 CAMPGROUND CLOSURE
PART 2 PRODUCTS
PART 3 EXECUTION
01 12 00 - ACCESS BRIDGE WEIGHT RESTRICTIONS
PART 1 GENERAL
1.1 BRIDGE WEIGHT RESTRICTIONS
1.2 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 WEIGHT LIMIT RESTRICTION
3.2 VEHICLES NOT ON THE TRUCK WEIGHT DIAGRAMS
01 20 00 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 MOBILIZATION AND DEMOBILIZATION
1.1.1 Payment
1.1.2 Unit of Measure
1.2 PROJECT STAKEOUT
1.2.1 Payment
1.2.2 Unit of Measure
1.3 DEMOLITION
1.3.1 Payment
1.3.2 Unit of Measure