ATTACHMENT_2-_SPECIFICATIONS_MILL_CREEK_CAMPGROUND_1.pdf
PDF 1 MB Posted
- Attached to
- BLM-CO GFO MILL CREEK CAMPGROUND EXPANSION
- Solicitation number
- 140L1725R0002
About this file
These specifications detail the Mill Creek Campground Expansion and Improvement project for the Bureau of Land Management's Gunnison Field Office in Colorado. The project involves site work including road and parking area construction, precast concrete toilet installation, campsite construction, and bridge deck maintenance at a campground located in Hinsdale County. Key specifications include installing two precast CXT Incorporated Cascadian single vault toilets (one right-hand, one left-hand), constructing tent pads, fire rings, picnic tables, and a culvert, with work to be completed within 365 days of the Notice to Proceed. The project has a total small business set-aside with an estimated value between $250,000 and $500,000, situated at approximately 9,500 feet elevation with potential weather-related work interruptions.
The comprehensive specifications cover detailed requirements for each project component, including concrete specifications, earthwork, site furnishings, drainage utilities, and bridge timber wearing surface replacement. Specific requirements include using Colorado Department of Transportation standard specifications for aggregates, installing ADA-compliant site elements, using specific manufacturers like Pilot Rock for fire rings and picnic tables, and ensuring proper bedding, compaction, and installation techniques for all project components. The project emphasizes environmental controls, quality management, and photographic documentation throughout the construction process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_3-_BID_SCHEDULE_MILL_CREEK_CAMPGROUND_1.pdf | ||
| ATTACHMENT_1-_DESIGN_MILL_CREEK_CAMPGROUND_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Gunnison Field Office Colorado
Mill Creek Campground Expansion and Improvement
SPECIFICATIONS
BLM Gunnison Field Office Mill Creek Campground Expansion and Improvement
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 12 00 ACCESS BRIDGE WEIGHT RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 46 00 QUALITY CONTROL
01 57 60 SUPPLEMENTAL ENVIRONMENTAL CONTROLS
01 80 00 PHOTOGRAPHIC DOCUMENTATION
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 20 00 SURVEY AND PROJECT STAKEOUT
02 41 00 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 30 00 BRIDGE TIMBER WEARING SURFACE REPLACEMENT
DI VI SI ON 12 - FURNI SHI NGS
12 60 00 PRECAST CONCRETE TOILET BUILDING
12 93 00 SITE FURNISHINGS
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
The work includes, but is not limited to; site work, road and parking area construction, precast concrete toilet installation, campsite construction, and bridge deck maintenance.
1.2 LOCATION
The project is located in Hinsdale County, Colorado. From Lake City, CO, travel south on CO-149, Turn right on County Road 30, travel approximately 11 miles, project location is on the left.
The work location can be found by searching "Mill Creek Campground" in Google maps.
1.3 WORK SCHEDULE
Work shall occur Monday - Friday, excluding federal holidays.
Work shall be completed within 365 days of the Notice to Proceed.
The project elevation is around 9500 feet. Weather (snow or snowmelt) may prevent work for several months of the year. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site.
1.4 PUBLIC SAFETY
The project will expand an existing campground. The existing campground will remain open to the public during the work. Contractor shall take precautions, as necessary, to protect the public from construction hazards.
1.5 CAMPGROUND CLOSURE
Campground closure will only be allowed as specified in 06 30 00 BRIDGE
TIMBER WEARING SURFACE REPLACEMENT.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 12 00
ACCESS BRIDGE WEIGHT RESTRICTIONS
PART 1 GENERAL
1.1 BRIDGE WEIGHT RESTRICTIONS
The site access bridge has weight restrictions.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Vehicles Not On The Truck Weight Diagrams ; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 WEIGHT LIMIT RESTRICTION
Vehicles shall weight less than, or equal to the weights shown on the "truck weight diagrams" at the end of this specification.
3.2 VEHICLES NOT ON THE TRUCK WEIGHT DIAGRAMS
Any vehicle configuration, including a crane, not shown on the "truck weight diagrams" shall be submitted for approval prior to crossing the bridge. Include in the submittal a diagram similar to the "truck weight diagrams". Include the number of axles, weight per axle, and axle spacing. The BLM may take up to 30 days to review the vehicle.
SECTION 01 12 00 Page 3
Truck Weight Diagrams
Section 01 12 00, paragraph 3.1, WEIGHT LIMIT RESTRICTIONS
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 MOBILIZATION AND DEMOBILIZATION
1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization.
When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.
Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.
1.1.2 Unit of Measure
Unit of measure: job.
1.2 PROJECT STAKEOUT
1.2.1 Payment
Payment will be made for all costs associated with surveying and staking out the work.
1.2.2 Unit of Measure
Unit of measure: Job.
SECTION 01 20 00 Page 4
1.3 DEMOLITION
1.3.1 Payment
Payment will be made for all costs associated with demolition. Including transportation and disposal.
1.3.2 Unit of Measure
Unit of measure: job.
1.4 CLEARING AND GRUBBING
1.4.1 Payment
Payment will be made for all costs associated with clearing and grubbing.
Including transportation and disposal of materials.
1.4.2 Unit of Measure
Unit of measure: Job.
1.5 SITE GRADING
1.5.1 Payment
Payment will be made for all costs associated with site grading, including moisture conditioning, and compaction.
1.5.2 Unit of Measure
Unit of measure: Job.
1.6 AGGREGATE BASE COURSE
1.6.1 Payment
Payment will be made for all costs associated with providing aggregate base course. Including preparation, transportation, placement, moisture conditioning, and compaction. Submit weight tickets.
1.6.2 Unit of Measure
Unit of measure: ton.
1.7 PRECAST CONCRETE TOILET BUILDING
1.7.1 Payment
Payment will be made for all costs associated with providing a precast concrete toilet building. Including preparation, transportation, bedding
SECTION 01 20 00 Page 5 material, installation, and backfill compaction.
1.7.2 Unit of Measure
Unit of measure: Each.
1.8 STEEL PARKING DELINEATOR
1.8.1 Payment
Payment will be made for all costs associated with providing steel parking delineators.
1.8.2 Unit of Measure
Unit of measure: Each.
1.9 CONCRETE PARKING STOP
1.9.1 Payment
Payment will be made for all costs associated with providing parking stops.
1.9.2 Unit of Measure
Unit of measure: Each.
1.10 FIRE RING
1.10.1 Payment
Payment will be made for all costs associated with providing fire rings.
Including foundations, gravel, and site preparation.
1.10.2 Unit of Measure
Unit of measure: Each.
1.11 ACCESSIBLE FIRE RING
1.11.1 Payment
Payment will be made for all costs associated with providing accessible fire rings. Including foundations, gravel, and site preparation.
1.11.2 Unit of Measure
Unit of measure: Each.
SECTION 01 20 00 Page 6
1.12 PICNIC TABLE
1.12.1 Payment
Payment will be made for all costs associated with providing picnic tables. Including grading, foundations, and aggregate surfacing around picnic tables.
1.12.2 Unit of Measure
Unit of measure: Each.
1.13 TENT PAD
1.13.1 Payment
Payment will be made for all costs associated with providing and constructing tent pads. Including the crusher fines and grading.
1.13.2 Unit of Measure
Unit of measure: Each.
1.14 FOOD STORAGE LOCKER
1.14.1 Payment
Payment will be made for all costs associated with providing a food storage locker. Including the concrete slab.
1.14.2 Unit of Measure
Unit of measure: Each.
1.15 SIGN POSTS - CAMPSITE IDENTIFICATION
1.15.1 Payment
Payment will be made for all costs associated with providing sign posts.
1.15.2 Unit of Measure
Unit of measure: Each.
1.16 TIMBER STAIR STEPS
1.16.1 Payment
Payment will be made for all costs associated with providing timber stair steps. Including aggregate and site work.
SECTION 01 20 00 Page 7
1.16.2 Unit of Measure
Unit of measure: Each.
1.17 CORRUGATED METAL PIPE CULVERT
Payment will be made for all costs associated with providing corrugated metal pipe culverts, including bedding material, earthwork, and compaction.
1.17.1 Unit of Measure
Unit of measure: linear foot
1.18 BRIDGE TIMBER WEARING SURFACE REPLACEMENT
1.18.1 Payment
Payment will be made for all costs associated with replacement of the bridge wearing surface. Including removal and disposal of existing wearing surface.
1.18.2 Unit of Measure
Unit of measure: Job.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 8
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule ; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 9
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.
SECTION 01 32 01 Page 10
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt. Except for the vehicle submittal which will be reviewed within 30 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with
SECTION 01 33 00 Page 11 appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 12
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
01 12 00 SD-01 Preconstruction Submittals
3.2 GVehicles Not On The Truck
Weight Diagrams
01 32 01 SD-01 Preconstruction Submittals
GInitial Project Schedule
01 46 00 SD-01 Preconstruction Submittals
1.2 GQuality Control (QC) Manager
01 57 60 SD-01 Preconstruction Submittals
3.4 GSpill Prevention And Cleanup
Plan
SD-11 Closeout Submittals
3.3 GPhotographic Documentation
03 30 00 SD-03 Product Data
2.2 GStructural Macro Synthetic
Reinforcing Fibers
06 30 00 SD-01 Preconstruction Submittals
1.3 GTemporary Bridge Closure
1.2 GBridge Closure Safety Plan
12 60 00 SD-03 Product Data
2.1 GPrecast Toilet Building
3.1 GManufacturer's Product
Specifications and installation instructions
12 93 00 SD-03 Product Data
2.2 GPicnic Tables
2.1 GFire Rings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
12 93 00 2.5 GParking Stops
2.3 GFood Locker
31 00 00 SD-03 Product Data
2.1 GAggregate Base Course
SD-07 Certificates
3.8Aggregate Weight Tickets
33 40 00 SD-03 Product Data
2.1 GCorrugated Steel Pipe
2.2 GJoint
SD-11 Closeout Submittals
3.3 GPhotographic Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 01 46 00
QUALITY CONTROL
PART 1 GENERAL
1.1 QUALITY CONTROL
Contractor shall establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction.
Quality control (QC) is comprised of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements.
1.2 QUALITY CONTROL MANAGER
Provide a quality control (QC) manager at the work site to implement and manage the QC program. The QC Manager may also be the project superintendent.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Quality Control (QC) Manager ; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 QUALITY CONTROL
Contractor shall ensure that the construction complies with the requirements of the contract. At a minimum, perform the following prior to beginning work on each definable feature of work:
Review each paragraph of the applicable specification sections.
Review the contract drawings.
Verify that appropriate submittals have been approved.
Verify that the required preliminary work has been completed and complies with the contract.
Do not build upon nor conceal non-conforming work.
SECTION 01 46 00 Page 13
SECTION 01 57 60
SUPPLEMENTAL ENVIRONMENTAL CONTROLS
PART 1 GENERAL
1.1 DEFINITIONS
Equipment: for the purpose of this specification, equipment shall include, but isn't limited to; dozers, backhoes, trackhoes, trailers, graders, compactors, or any other construction equipment used to accomplish the work. Passenger vehicles are not considered equipment.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Spill Prevention And Cleanup Plan ; G
SD-11 Closeout Submittals
Photographic Documentation ; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 EROSION CONTROL
In addition to the requirements of the State of Colorado stormwater permits, contractor shall take measures, as necessary to control erosion. Contractor shall inspect site after rain (or melt) events and mitigate areas where erosion or sediment runoff is occurring. Erosion includes wind. Contractor shall water exposed soils, as necessary, to prevent wind erosion.
3.2 FIRE PREVENTION
All equipment shall have a spark arrester installed. The Contractor shall have a fire extinguisher and shovel readily available to contain and extinguish fires.
3.3 EQUIPMENT CLEANING AND MAINTENANCE
Equipment shall be cleaned prior to arriving on site. Equipment shall arrive on site free from dirt, debris, weeds, and seeds. All equipment shall be inspected by the Contracting Officer's Representative, on site, and prior to unloading. Notify the Contracting Officer's Representative at least 7 days prior to equipment delivery to coordinate inspection. If equipment leaves the jobsite, and returns at a later date, then equipment shall be re-inspected before reentering the work site.
SECTION 01 57 60 Page 14
Equipment maintenance will not be allowed on site. Equipment leaking fluids shall be removed from site.
Provide photographic documentation in accordance with section 01 80 00 .
Provide pictures demonstrating equipment is clean while the equipment is onsite, and prior to unloading.
3.4 SPILL PREVENTION
The Contractor shall submit a spill prevention and cleanup plan. The spill prevention and cleanup plan shall identify foreseeable accidents, including spills while adding fluids to equipment, and identify an action plan to rapidly clean all accidents. Cleanup materials and equipment shall be on site during work.
3.5 WASTE CONTROL
All waste generated by the work shall be contained and removed from the site and disposed of in a legal manor.
SECTION 01 57 60 Page 15
SECTION 01 80 00
PHOTOGRAPHIC DOCUMENTATION
PART 1 GENERAL
1.1 SUMMARY OF WORK
Document that the work is in compliance with contract requirements.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 PHOTOGRAPHS
Provide photographs in sufficient detail and quantity to demonstrate compliance with contract requirements. Submit electronic photographs via email. Photographs sent via text message will not be accepted.
Photographs do not negate requirements for Contracting Officer's Representative's inspections and approvals on specified items of work.
SECTION 01 80 00 Page 16
SECTION 02 20 00
SURVEY AND PROJECT STAKEOUT
PART 1 GENERAL
1.1 SECTION SUMMARY
The contractor shall stake out the project as detailed on the drawings.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 PROJECT STAKEOUT
The contractor shall stake out the project as detailed on the drawings, or as required for construction.
3.2 STAKEOUT REVIEW
The Contracting Officer's Representative and the Contractor shall review the layout, as staked, together. The Contractor shall build 15 working days into the project schedule for coordination of a meeting date that works for both the Contractor and the Contracting Officer's Representative.
The Contracting Officer's Representative may make minor modifications to the layout in order to minimize the damage to existing vegetation, or for constructability. The contractor shall receive approval of the stakeout prior to clearing and grubbing, or other earth disturbing activities.
SECTION 02 20 00 Page 17
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
Provide all materials and labor necessary to demolish and remove items as specified and as shown on the drawings.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 DISPOSAL OF REMOVED MATERIALS
All materials removed, shall become the property of the Contractor and shall be removed from Government property and disposed of in a legal manor.
SECTION 02 41 00 Page 18
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 305.1 (2014) Specification for Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
ASTM INTERNATIONAL (ASTM)
ASTM C387/C387M (2017) Standard Specification for Packaged, Dry, Combined Materials for Concrete and High Strength Mortar
NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)
NRMCA QC 3 (2015) Quality Control Manual: Section 3, Plant Certifications Checklist:
Certification of Ready Mixed Concrete Production Facilities
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Structural Macro Synthetic Reinforcing Fibers ; G
PART 2 PRODUCTS
2.1 CONCRETE
Provide concrete composed of portland cement, aggregates, water, and admixtures as specified.
2.1.1 STRENGTH
Compressive strength (f'c) shall be 3500 psi at 28 days.
2.1.2 Air Entrainment
Attain air content at point of placement between 4 and 6 percent.
SECTION 03 30 00 Page 19
2.1.3 SLUMP
Slump of the concrete, at the point of placement, shall be 4 inches or less.
2.1.4 PORTLAND CEMENT
ASTM C150/C150M, Type II.
2.2 STRUCTURAL MACRO SYNTHETIC REINFORCING FIBERS
Structural macro synthetic reinforcing fibers shall be Sika Fibermesh 650, or approved equal. Structural macro synthetic reinforcing fibers shall have a diameter greater than 0.3 mm and a length between 1 inch and 3 inches.
2.3 PREPACKAGED CONCRETE MIXTURE
Prepackaged concrete mix shall be identified as conforming to
ASTM C387/C387M
2.4 READY MIXTURE
Ready-mix plant equipment and facilities must be certified in accordance with NRMCA QC 3.
PART 3 EXECUTION
3.1 STRUCTURAL MACRO SYNTHETIC REINFORCING FIBERS
Provide 4 pounds of reinforcing fibers per cubic yard of concrete.
Incorporate into concrete mix as recommended by the manufacturer.
3.2 PREPACKAGED CONCRETE MIXTURE
Use the minimum amount of water to make the mixture. Adding too much water to the mixture will greatly reduce the overall compressive strength. Average slump shall be between 2" to 4".
3.3 CONCRETE CONSOLIDATION
Concrete shall be adequately vibrated, rodded, or spaded into place to fill voids.
3.4 COLD WEATHER REQUIREMENTS
Perform cold weather concreting in accordance with ACI 306.1 . Use special protection measures if freezing temperatures are anticipated before the expiration of the specified curing period. The ambient temperature of the air where concrete is to be placed and the temperature of surfaces to receive concrete must be not less than 40 degrees F. The temperature of the concrete when placed must be not less than 50 degrees F nor more than 75 degrees F. Heat the mixing water or aggregates to regulate the concrete placing temperature. Materials entering the mixer must be free from ice, snow, or frozen lumps. Do not incorporate salt, chemicals or other materials in the concrete to prevent freezing.
SECTION 03 30 00 Page 20
3.5 HOT WEATHER REQUIREMENTS
When job-site conditions are present or anticipated that accelerate the rate of moisture loss or rate of cement hydration of freshly mixed concrete, including an ambient temperature of 80 degrees F or higher, and an evaporation rate that exceeds 0.2 lb/ft2/h, conform concrete work to all requirements of ACI 305.1 .
SECTION 03 30 00 Page 21
SECTION 06 30 00
BRIDGE TIMBER WEARING SURFACE REPLACEMENT
PART 1 GENERAL
1.1 CRITERIA FOR BIDDING
Plan dimensions of the replaced wearing surface shall be 80 feet length, and a minimum width of 11'-3".
1.2 BRIDGE CLOSURE TO PUBLIC TRAFFIC
The bridge must remain open to public traffic May 26 through September 30.
Bridge closures shall be adequately notified to campers, and properly signed for public safety. Submit a bridge closure safety plan for approval if Contractor plans to close the bridge.
1.3 TEMPORARY BRIDGE CLOSURE
A temporary bridge closure, maximum of four hours per day, may, or may not be approved. Approval will depend on campground use, the contractor's notification of closure plan, and closure hours.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Temporary Bridge Closure ; G
Bridge Closure Safety Plan ; G
PART 2 PRODUCTS
2.1 WEARING SURFACE BOARDS
Wearing surface boards shall be 3" depth, 11.25" width, and 20' length, actual dimensions, not nominal dimensions.
Wearing surface boards shall be HEM-Fir or Douglas-Fir, #2 or better.
2.2 HARDWARE
Hardware shall be galvanized.
PART 3 EXECUTION
3.1 EXISTING WEARING SURFACE BOARDS - REMOVAL
Remove the existing wearing surface boards. Unscrew and remove hardware prior to removing the boards.
SECTION 06 30 00 Page 22
3.2 BRIDGE DECK CLEANING
After removing the existing wearing surface, clean the bridge deck.
Pressure wash the deck. Remove all dirt, dust, and debris.
3.3 BRIDGE DECK WOOD TREATMENT
Apply copper naphthenate wood treatment to the existing timber bridge deck prior to installation of the wearing surface boards. Take extra care to treat the holes left in the deck after removal of the wearing surface.
Apply wood treatment in accordance with the manufacturer's instructions.
3.4 WEARING SURFACE BOARDS
Install wearing surface boards as shown on the drawings. Countersink bolts. Stagger the joints as shown on the drawings.
SECTION 06 30 00 Page 23
SECTION 12 60 00
PRECAST CONCRETE TOILET BUILDING
PART 1 GENERAL
1.1 SCOPE
This specification covers the installation of two precast toilet buildings as manufactured by CXT Incorporated.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Precast Toilet Building ; G
Manufacturer's Product Specifications and installation instructions ; G
PART 2 PRODUCTS
2.1 PRECAST TOILET BUILDING
The precast toilet buildings shall be manufactured by CXT Incorporated.
CXT Incorporated Spokane Industrial Park 3808 North Sullivan Road, Building 7 Spokane, WA 99216 Phone 800-696-5766
2.1.1 MODEL
Two similar toilets are required, one right hand, one left hand.
1. Cascadian, single vault, right hand.
2. Cascadian, single vault, left hand.
2.1.2 TEXTURES AND COLORS
Both toilets shall have the following textures and colors.
Ext er i or Locat i on Texture Color
Lower Wall Horizontal Lap Siding nuss brown
Upper Wall Board and Batt Siding nuss brown
Roof Cedar Shake charcoal grey
SECTION 12 60 00 Page 24
2.1.3 WALL VENT LOCATION
Right hand toilet shall have the vent on the right wall, upon entering the toilet room.
Left hand toilet shall have the vent on the back wall, upon entering the toilet room.
2.1.4 ADDITIONAL BUILDING REQUIREMENTS
Supply (2) 3 roll paper holders, for a total of 6 rolls. Note: (1) 3 roll holder is standard, (2) 3 roll paper holders will require additional coordination with the manufacturer.
Install solar vent fan for each vent.
Install unisex signage.
2.2 PRODUCT REQUIREMENTS
The precast toilet building shall meet the following criteria.
2.2.1 Manufacturer Criteria
The manufacturer supplying the precast concrete vault toilet must meet the following:
A. Manufacturer must be ISO 9001 certified.
B. Manufacturing plant must be PCI certified.
C. Manufacturer must provide stamped, engineered drawings prior to acceptance.
D. Manufacturer must show four (4) examples of Sweet Smelling Technology designed precast concrete vault toilet facilities produced, installed, and in use as an example of their ability to perform.
E. Manufacture shall provide a twenty (20) year warranty.
F. UL 752 Bullet Resistance on 4" thick concrete samples.
2.2.2 Design Criteria
2.2.2.1 Roof Snow Load
Vault buildings are designed to withstand a 350 pounds per square foot snow load.
2.2.2.2 Floor Load
Vault buildings are designed to withstand 400 pounds per square foot floor load.
2.2.2.3 Wind Load
Vault buildings shall withstand the effects of 150 miles per hour (3-second gust) wind exposure C.
2.2.2.4 Earthquake
Vault buildings will withstand the effects of a seismic design category E earthquake.
SECTION 12 60 00 Page 25
2.2.2.5 Sweet Smelling Technology (SST)
Vault buildings shall incorporate design aspects of SST as outlined by Briar Cook for the U.S. Forest Service. All wall to floor interior surface seams shall have a minimum 1" radius coving made of high strength grout. The vault shall have a bottom slope of 1" per foot from under the toilet riser out to the outside cleanout area. The vault shall have a 24" diameter (minimum) lightweight manhole cover installed to the rear or side of the building. The manhole cover should be raised, with the surrounding concrete sloped away using a minimum slope of ½" per foot. The depth of the vault shall be no deeper than 4½' to 5'. A 12" diameter round pipe will be installed to vent the vault and the pipe shall be raised a minimum of 3' above the highest point of the roof. Vent pipe shall be straight up from the vault. There shall be only one vent opening in the building.
2.2.2.6 Additional Design Standards
Single vault buildings shall be an all concrete design with a minimum 7/12 roof pitch. Vault buildings shall have a minimum 4" wall, 4½" roof, and 5" floor thickness. Vault buildings shall have a one-piece floor unit to prevent panels that migrate in different directions during periods of freeze/thaw stress. Vault buildings shall have a one-piece full length and width vault unit to support the building, screen area, and snow loads evenly.
2.2.2.7 Concrete - Colored
The roof panels, building walls, and screen panels shall be colored concrete. Color shall match the existing concrete toilet building on site.
2.2.2.8 Doors - Steel
Doors are flush panel type 1¾" thick, minimum 16-gauge galvanized steel, top painted with DTM ALKYD.
Door frames are knockdown or welded type, single rabbet, minimum 16-gauge prime coated steel top painted with DTM ALKYD, width to suit wall thickness. Three (3) rubber door silencers are provided on latch side of frame. Three hinges (3) per door with dull chrome plating 4½" x 4½", adjustable tension, and automatic closing for each door. Dome style doorstop stop meeting ANSI 156.16. Provide door sweep at the bottom of door with an adjustable brush.
2.2.2.9 Grab Bars
Grab ars shall be 18-gauge, type 304 stainless steel with 1½" clearance.
Able to withstand 300-pound top loading.
2.2.2.10 Riser
Riser shall meet ADA standards, be constructed of molded one-piece HDPE polyethylene, and have a smooth surface and have high impact resistance at extremely cold temperatures.
2.2.2.11 Toilet Paper Dispenser
Toilet Paper Dispenser shall be constructed of ¼" thick, type 304 stainless steel, hold three (3) standard rolls of toilet paper.
SECTION 12 60 00 Page 26
Fastening system able to withstand 300-pound top loading.
2.2.2.12 Polyethylene Vault Liner
Polyethylene Vault Liner shall be made of a Roto molded 8460 polyethylene. Hold up to 1,000 gallons of waste. Minimum thickness .100.
2.3 CONTRACTOR PROPOSED SUBSITUTIONS
Contractor proposed substitutions to the precast toilet building specified shall be submitted with the bid. If proposed substitution doesn't meet the specifications, the bid will not be considered. If a bid is submitted without a proposed substitution, then the contractor shall install the precast toilet building specified.
PART 3 EXECUTION
3.1 INSTALLATION
Install the precast toilet building in accordance with the manufacturer's product specifications. The entire manufacturer's specification will be incorporated, including the excavation, elevation, backfill, compaction, and material requirements. A sand or aggregate bedding material shall be installed. Submit the manufacturer's product specifications and installation instructions , which will supplement this specification section.
3.1.1 Finish Floor Elevation and Slope
The finish floor elevation will be provided by the BLM. The contractor shall install the precast toilet building within 0.05 feet of the elevation provided. The precast toilet building shall be sloped between 1% and 1.5% to allow water to drain out of the interior of the building, through the door.
3.1.2 Backfill and Compaction
Backfill and compact in accordance with the manufacturer's product specifications. In addition to the compaction specified in the manufacturer's product specifications:
Backfill adjacent to the precast toilet building shall be placed in 8 inch, maximum, lifts and compacted with a whacker-type mechanical tamper or equivalent.
SECTION 12 60 00 Page 27
SECTION 12 93 00
SITE FURNISHINGS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Picnic Tables ; G
Fire Rings ; G
Parking Stops ; G
Food Locker ; G
PART 2 PRODUCTS
2.1 FIRE RINGS
2.1.1 Accessible Fire Rings
Accessible fire rings shall be compliant with the American with Disability Act (ADA). Accessible fire rings shall be as manufactured by Pilot Rock.
www.pilotrock.com
Pilot Rock Fire Ring Model: M-32/17/PA
2.1.2 Fire Rings
Fire rings shall be as manufactured by Pilot Rock. www.pilotrock.com
Pilot Rock Fire Ring Model: FSW-30/9/PA
2.1.3 Anchors
Fire rings shall be anchored with three steel pins per ring and encased in concrete as shown on the drawings.
2.2 PICNIC TABLES
Fire rings shall be as manufactured by Pilot Rock. www.pilotrock.com
Extreme load rated accessible picnic table:
WXT series, WXT-C* Black (B)-8H* Brown (W) 8 foot length standard height steel frame: powder coated, black table and seat top: perforated, brown
SECTION 12 93 00 Page 28
2.3 FOOD LOCKER
As manufactured by "BearSaver". Model number: FS30-UP.
https://bearsaver.com
2.4 STEEL PARKING DELINEATORS
Steel parking delineators shall be schedule 40 steel pipe. Used pipe may be supplied; however pipe must be clean of excessive oil, grease, rust, etc. Pipe must be straight and have no dents, bends, or obvious defects.
2.5 CONCRETE PARKING STOPS
Parking stops shall be reinforced concrete. With minimum dimensions of;
six foot length, eight inch width, and 5 inch height.
2.6 TENT PAD AND STAIR TIMBERS
Tent pad timbers shall be 6 inch by 6 inch, pressure treated for ground contact.
2.7 TENT PAD AGGREGATE
Tent pad aggregate shall meet the following gradation:
Sieve Size % passing
1/2 inch 100%
#4 70% - 100%
#16 30% - 60%
#200 5%-15%
2.8 SIGN POSTS - CAMPSITE IDENTIFICATION
U-Channel sign posts shall be steel, 6 foot total length, have a 1-3/8" channel depth, 3/8" holes on 1" centers, and be painted brown.
PART 3 EXECUTION
3.1 FIRE RINGS
Grade the ground surface level prior to placing fire rings. Secure the fire rings to the foundations, three foundations per fire ring. Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE CONCRETE. Fire rings shall be placed in locations staked by the Contracting Officer.
Location shown on the drawings is approximate.
3.2 PICNIC TABLES
Grade the ground surface level prior to placing picnic tables. Place aggregate under and around the picnic tables as shown on the drawings.
Secure the picnic tables to the foundations, four foundations per table.
Provide concrete in accordance with section 03 30 00 CAST-IN-PLACE CONCRETE. Picnic tables shall be placed in locations staked by the
SECTION 12 93 00 Page 29
Contracting Officer. Location shown on the drawings is approximate.
3.3 FOOD LOCKER
Provide concrete slab in accordance with section 03 30 00 CAST-IN-PLACE CONCRETE. Verify dimensions of food locker prior to forming concrete to ensure the food locker will fit on the concrete slab. Secure food locker to the concrete slab with concrete anchor bolts.
3.4 STEEL PARKING DELINEATORS
Steel parking delineators shall be installed as shown on the drawings.
Tops of the steel parking delineators shall be set three inches above the finished grade of the aggregate surfacing.
3.5 CONCRETE PARKING STOPS
Each parking stop shall be held in place with two (2) #4 rebars, 24 inches long.
3.6 TENT PADS
Level existing grade prior to installing timbers. Finish elevation of tent pad and crusher fines shall be level. Tent pads shall be placed in locations staked by the Contracting Officer. Location shown on the drawings is approximate.
3.7 LOCATION OF TIMBER STAIR STEPS
The location of the stairs shown on the drawings is preliminary. Exact location of the stairs will be finalized after the campsite grading is completed. The stairs may be distributed at multiple campsite locations.
However, the total number of steps required will remain as listed on the bid schedule.
3.8 TIMBER STAIR STEPS
Steps shall be level. Countersink hardware. Tops of bolts shall not protrude above the timber surface. Lap joints as shown on the drawings.
Provide aggregate in accordance with section 31 00 00 EARTHWORK. Moisture condition and compact the aggregate to provide a firm surface. Moisture condition and compact the material adjacent to the timbers to provide a firm surface.
3.9 SIGN POSTS - CAMPSITE IDENTIFICATION
Install sign posts plumb. Drive the posts 2 feet into the ground.
Install at locations staked by the Contracting Officer.
The contractor is not required to obtain, or install, signs for the sign posts.
SECTION 12 93 00 Page 30
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Aggregate Base Course ; G
SD-07 Certificates
Aggregate Weight Tickets
PART 2 PRODUCTS
2.1 AGGREGATE BASE COURSE
Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2022, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The Contractor is responsible for locating underground utilities prior to construction. The Government is not aware of any underground utilities, however the Contractor shall verify the presence or absence prior to construction.
3.2 GENERAL EXCAVATION
Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times, including during construction.
3.3 EARTHWORK QUANTITIES
Cut (Cubic Yards) Fill (Cubic Yards) Net (Cubic Yards)
Road and Parking Areas
1090 730 360
3.4 GROUND SURFACE PREPARATION
Clear and grub in accordance with section 31 11 00 . Do not perform
SECTION 31 00 00 Page 31 construction when surfaces are covered in snow, frozen, or muddy. Prepare the subgrade to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Shape subgrade to drain.
3.5 CAMPSITE GRADING AREAS
Grade camping areas relatively flat, with slopes not exceeding 2 percent.
Camping areas include tent pads, picnic tables, fire rings, and food lockers.
3.6 VIBRATORY COMPACTION EQUIPMENT
Vibratory compaction equipment, used on roads and parking areas, shall have a minimum of 10,000 pounds impact per vibration and a minimum frequency of 1,000 vibrations per minute.
3.7 AGGREGATE PLACEMENT LOCATIONS
3.7.1 Subgrade
Contractor shall prepare the subgrade to the lines and grades shown on the plans.
3.7.2 Subgrade Compaction
Moisten material as necessary to achieve compaction. Compact the subgrade by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
3.7.3 Aggregate Base Course
Contractor shall receive approval of the subgrade prior to placing aggregate base course. Place base course aggregate to the lines and grades shown on the plans.
3.7.4 Aggregate Base Course Compaction
Moisten material as necessary to achieve compaction. Compact the base course aggregate by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
3.8 AGGREGATE WEIGHT TICKETS
Submit aggregate weight tickets . Weight tickets are required prior to payment.
3.9 EXCESS MATERIAL DISPOSAL
Excess cut material shall be placed uniformly on site, at designated locations. Excess cut material shall not be removed from the work site.
3.10 FINISHING
Finish the surfaces to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.5 foot of the elevations indicated.
Finish surfaces in a manner that will result in effective drainage, SECTION 31 00 00 Page 32 regardless of tolerance.
3.10.1 STAKEOUT POINTS - SUBGRADE ELEVATIONS
There is a 0.5 foot tolerance on the subgrade elevations provided. The finish elevations may be altered to aid the earthwork. However, finish slopes shall generally match the slopes shown and never exceed the slopes shown.
3.11 TOILET AREA GRADING
The finish grade slopes from the toilets to the parking spaces adjacent to the toilets shall be less than 2 percent.
SECTION 31 00 00 Page 33
SECTION 31 11 00
CLEARING AND GRUBBING
PART 1 GENERAL
Not Used.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 SURVEY STAKE OUT
Prior to clearing and grubbing, the contractor shall stake out the roads and parking areas, as detailed on the drawings, in accordance with 02 20 00 SURVEY AND PROJECT STAKEOUT. The Contracting Officer's Representative will review the layout as staked and may make minor modifications to the layout in order to minimize the damage to existing vegetation. The contractor shall receive approval of the stakeout prior to clearing and grubbing.
3.2 CLEARING AND GRUBBING LIMITS
Clearing and grubbing limits shall be within the grading limits shown on the drawings.
3.3 PROTECTION
Protect trees and vegetation from damage incident to clearing, grubbing, and construction operations.
3.4 CLEARING
Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface.
3.5 GRUBBING
Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas.
Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 12 inches below the original surface level of the ground in the area of new road construction. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.
SECTION 31 11 00 Page 34
3.6 DISPOSAL OF CLEARING AND GRUBBING VEGETATION
Dispose of clearing and grubbing material in locations designated on the drawings. Logs, stumps, roots, brush, rotten wood, and other organic material resulting from the clearing and grubbing operations, shall be uniformly scattered on site in piles less than 18 inches off the ground.
Process, mulch, cut, or limb material as necessary to comply with disposal pile requirements.
SECTION 31 11 00 Page 35
SECTION 33 40 00
STORM DRAINAGE UTILITIES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A760/A760M (2015) Standard Specification for Corrugated Steel Pipe, Metallic-Coated for Sewers and Drains
ASTM A929/A929M (2018) Standard Specification for Steel Sheet, Metallic-Coated by the Hot-Dip Process for Corrugated Steel Pipe
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Corrugated Steel Pipe ; G
Joint ; G
SD-11 Closeout Submittals
Photographic Documentation ; G
PART 2 PRODUCTS
2.1 CORRUGATED STEEL PIPE CULVERT
ASTM A929/A929M Aluminum-coated, type 2 (Aluminized Type 2) coated pipe:
a. ASTM A760/A760M Type I (circular) pipe with helical 2-2/3 by 1/2 inch corrugations.
b. 14 gage (0.079 inches).
c. 18 inch diameter.
2.1.1 CULVERT QUANTITIES
One culvert is required.
SECTION 33 40 00 Page 36
Quantity Each Culvert Length (feet)
1 45
2.2 JOINT
ASTM A929/A929M Aluminum-coated, type 2 (Aluminized Type 2) coated joint.
ASTM A760/A760M , soil tight joint.
2.3 BEDDING MATERIAL
Bedding material shall meet the following gradation:
Sieve Size Percent passing
1 inch 100%
Number 4 20% - 65%
Number 200 0% - 10%
PART 3 EXECUTION
3.1 TRENCHING
The width of trenches at any point below the top of the pipe shall not be less than the outside diameter of the pipe plus 24 inches to permit thorough tamping of the bedding material under and around the pipe.
3.2 BEDDING
Provide bedding material. The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe.
3.3 JOINTING
Install joint in accordance with manufacturer's recommendations. Provide a soil tight joint.
Provide photographic documentation in accordance with section 01 80 00 PHOTOGRAPHIC DOCUMENTATION. Provide pictures demonstrating the joint is properly installed and bedded.
3.4 BACKFILLING
After the pipe has been properly bedded, selected material from excavation or borrow, at a moisture content that will facilitate compaction, shall be placed along both sides of pipe in layers not exceeding 6 inches in compacted depth. The backfill shall be brought up evenly on both sides of pipe for the full length of pipe. The fill shall be thoroughly compacted under the haunches of the pipe. Each layer shall be thoroughly compacted with mechanical tampers or rammers.
SECTION 33 40 00 Page 37
3.4.1 Backfill Material
Backfill material, within 12 inches of the culvert, shall be free of rocks or particles larger than 2 inches in diameter.
SECTION 33 40 00 Page 38
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.2 LOCATION |
| 1.3 WORK SCHEDULE |
| 1.4 PUBLIC SAFETY |
| 1.5 CAMPGROUND CLOSURE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 12 00 - ACCESS BRIDGE WEIGHT RESTRICTIONS |
| PART 1 GENERAL |
| 1.1 BRIDGE WEIGHT RESTRICTIONS |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 WEIGHT LIMIT RESTRICTION |
| 3.2 VEHICLES NOT ON THE TRUCK WEIGHT DIAGRAMS |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 MOBILIZATION AND DEMOBILIZATION |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 PROJECT STAKEOUT |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| 1.3 DEMOLITION |