Attachment 2- Specification.pdf
PDF 2 MB Posted
- Solicitation number
- 70Z08523RIBCT0006
About this file
This document is a specification for dry dock repairs to be conducted on the USCGC KICKAPOO. The repairs include work items such as inspecting and testing the vessel's underwater hull plating, preserving underwater body surfaces and freeboard areas, inspecting and testing appendages, cleaning and inspecting fuel tanks, and general requirements for fire prevention, welding and preservation. The specification provides technical details for conducting the repairs at a commercial contractor's facility for the Coast Guard. Relevant dates, pricing terms, and federal agencies involved are not included in this repair specification document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08523RIBCT0006 - Solicitation.pdf | ||
| Attachment 4 - Request for Clarification Form -K.pdf | ||
| Attachment 5 - USCG Ombudsman Notice.pdf | ||
| Attachment 3 - Past Performance Information Form.pdf | ||
| Attachment 1- SOSS.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC KICKAPOO (WLR 75406)
USCG 130 BARGE (13077)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2024
Developed By: Johnny B. Thomas
(Rev-0, 17 May 2023)
USCGC KICKAPOO (WLR-75E) DRYDOCK AVAILABILITY FY2024
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property .................................................................................. x Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics - Tender ............................................................................................................. xiii Principal Characteristics - Barge ................................................................................................................ xiv General Requirements WORK ITEM 1: Fire Prevention Requirements WORK ITEM 2: Hull Plating, U/W Body, Inspect - Tender WORK ITEM 3: Hull Plating, U/W Body, Ultrasonic Testing - Tender WORK ITEM 4: U/W Body, Preserve, 100 percent - Tender WORK ITEM 5: Hull Plating Freeboard, Preserve, 100 Percent - Tender WORK ITEM 6: Appendages, U/W, Leak Test - Tender WORK ITEM 7: Propulsion Shaft Rope Guards, Inspect WORK ITEM 8: Appendages, U/W, Internal, Preserve - Tender WORK ITEM 9: Tanks, MP Fuel Service, Clean and Inspect - Tender WORK ITEM 10: Tanks, Potable Water, Clean and Inspect - Tender WORK ITEM 11: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 12: Propulsion Shafting, Straighten WORK ITEM 13: Propulsion Shafting, Optical or Laser Alignment Check WORK ITEM 14: Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew WORK ITEM 15: Propulsion Shaft Bearings, External, Renew WORK ITEM 16: Propulsion Shaft Bearings, External, Check Clearances WORK ITEM 17: Stern Tube Interior Surfaces, Preserve, 100 Percent WORK ITEM 18: Propeller, Perform Minor Repairs and Reconditioning WORK ITEM 19: Propellers, Remove, Inspect, and Reinstall WORK ITEM 20: Keel Coolers, Clean, Inspect and Hydro WORK ITEM 21: Fathometer Transducer, General Maintenance WORK ITEM 22: Sea Valves and Waster Pieces, Overhaul Or Renew - Tender WORK ITEM 23: Sea Strainers, All Sizes, Renew - Tender WORK ITEM 24: Rudder Assembly, Remove, Inspect And Reinstall WORK ITEM 25: Rudders, Preserve, 100 Percent WORK ITEM 26: Hull Fittings (Mooring and Towing), Inspect and Test - Tender WORK ITEM 27: Spuds, Overhaul - Tender WORK ITEM 28: Spud Wells, Preserve - Tender WORK ITEM 29: Tanks, Potable Water, Preserve, Partial, - Tender WORK ITEM 30: Cathodic Protection, Magnesium Anodes, Renew, - Tender WORK ITEM 31: Drydock - Tender WORK ITEM 32: Temporary Services, Provide – Tender WORK ITEM 33: Sea Trial Performance, Support, Provide WORK ITEM 34: Hull Plating, U/W Body, Inspect - Barge WORK ITEM 35: Hull Plating, U/W Body, Ultrasonic Testing - Barge WORK ITEM 36: Appendages, U/W, Leak Test - Barge WORK ITEM 37: Appendages, U/W, Internal, Preserve - Barge WORK ITEM 38: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - Barge WORK ITEM 39: Tanks, Ballast, Clean and Inspect - Barge WORK ITEM 40: Tanks (Ballast), Preserve “Partial” - Barge WORK ITEM 41: Keel Coolers, Clean, Inspect and Hydro - Barge iii (Rev-0)
WORK ITEM 42: Fathometer Transducer, General Maintenance - Barge WORK ITEM 43: U/W Body, Preserve, 100 percent - Barge WORK ITEM 44: Hull Plating Freeboard, Preserve, 100 Percent - Barge WORK ITEM 45: Cathodic Protection, Magnesium Anodes, Renew - Barge WORK ITEM 46: Temporary Services, Provide - Barge WORK ITEM 47: Sea Valves and Waster Pieces, Overhaul Or Renew - Barge WORK ITEM 48: Sea Strainers, Simplex, Overhaul - Barge WORK ITEM 49: Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge WORK ITEM 50: Hull Fittings (Mooring and Towing), Inspect and Test - Barge WORK ITEM 51: Spuds, Overhaul - Barge WORK ITEM 52: Spud Wells, Preserve - Barge WORK ITEM 53: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 54: Drydock - Barge WORK ITEM 55: Boat Davit Winch, Shrink Wrap WORK ITEM 56: Buoy and Cargo Handling Crane, Shrink Wrap WORK ITEM 57: Decks - Exterior, Preserve, Non-Skid Broadcast Grit System - Barge WORK ITEM 58: Bosun Hole Ladders, Repair WORK ITEM 59: Crews Head Deck Repair WORK ITEM 60: Scuttle, Renew WORK ITEM 61: Deck Covering (Carpeting), Renew WORK ITEM 62: Compartment Bulkheads and Overheads, Preserve WORK ITEM 63: Bridge Equipment Emergency Power System, Install iv (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 130 CGB71-77 111-002, Hull Details, Side Shell Plating and Framing
Coast Guard Drawing 130 CGB71-77 530-002, Cooling Water Piping Schematic
Coast Guard Drawing 130 CGB 633-001, Rev -, Cathodic Protection
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements and Profile
Coast Guard Drawing 130 CGB71-77 085-004, Rev 1, Docking Plan
Coast Guard Drawing 130 CGB71-77 085-005, Rev -, Body Plan
Coast Guard Drawing 130 CGB71-77 085-006, Rev -, Curves of Form
Coast Guard Drawing 130 CGB71-77 111-001, Rev -, Hull Details – Bottom & Main Deck Plating and Framing Details
Coast Guard Drawing 130 CGB71-77 123-001, Rev -, Spud Well Bhds & Spud Details
Coast Guard Drawing 130-CGB67 123-2, Rev 2, Transducer Well Details
Coast Guard Drawing 130-CGB71-77 521-1, Rev 1, Fire Water, Ballast & Jetting Piping Schematic
Coast Guard Drawing 75 WAGL 0700-004, Rev A, Docking Plan
Coast Guard Drawing 75 WAGL 2901-004, Rev -, Curves of Form
Coast Guard Drawing 75 WAGL 633-001, Rev -, Cathodic Protection
Coast Guard Drawing 75E WAGL 4301-008, Rev F, Shafting Installation to Suit IF 1312 MDE
Coast Guard Drawing 75E WLR 0500-001, Rev 1, Lines and Offsets
Coast Guard Drawing 75E-WLR- 0101-3, Rev Deck Arrangement Plans
Coast Guard Drawing 75E-WLR-0103-1, Rev 1, Outboard Profile and General Arrangement
Coast Guard Drawing 75E WLR 103-002, Rev 2, Inboard Profile and Hold Arrgt Plan
Coast Guard Drawing 75E-WLR 1107-1, Rev 4, Lower Deckhouse Exterior
Coast Guard Drawing 75E WLR 1101-001, Rev 1, Dk Plate Plan & Shell Expansion
Coast Guard Drawing 75E WLR 1101-005, Rev B, New Grid Cooler Pocket P/S to Suit IF1312 MDE
Coast Guard Drawing 75E WLR 1103-001, Rev 5, Hull Framing Plan
Coast Guard Drawing 75E WLR 1103-004, Rev 3, Transverse Frames #15 thru 22
Coast Guard Drawing 75E WLR 1103-005, Rev 3, Transverse Frames #23 thru 28
Coast Guard Drawing 75E WLR 1105-002, Rev 3, Miscellaneous Hull Longitudinal Girders and Bulkheads and Transducer Installation Details
Coast Guard Drawing 75E WLR 1201-006, Rev B, WLR Tender/Barge Interface System vi (Rev-0)
Coast Guard Drawing 75-WAGL-2200-10, Rev D, Main Rudder Stock and Fittings for JASTRAM S2- 16-2-35 Steering System
Coast Guard Drawing 75-WAGL-2200-11, Rev D, Flanking Rudder Stock and Fittings for JASTRAM S2-16-2-35 Steering System
Coast Guard Drawing 75E WLR 2602-1, Rev 2, Towing Knee and Spud Well
Coast Guard Drawing 75E WLR 2602-2, Rev 1, Spud Hoist and Spud
Coast Guard Drawing 75E WLR 4103-008, Rev A, Jacket Water Piping Mods to Suit IF1312 MDE
(KICKAPOO)
Coast Guard Drawing 75E-WLR 4301-8, Rev G, Shafting Installation to Suit If 1312 MDE
Coast Guard Drawing 75E-WLR 2200-22, Rev C-, Steering System Arrangement for Jastram S2-16-2-35
Coast Guard Drawing 75E-WLR 2200-23, Rev D, Flanking Steering System Arrangement for Jastram S2-16-2-35
Coast Guard Drawing 75E-WLR 2200-24, Rev B, Rudder Post Installation for Jastram S2-16-2-35 Steering System
Coast Guard Drawing 75E-WLR 4301-8, Rev G, Shafting Installation to Suit If 1312 MDE
Coast Guard Drawing 75-WAGL 4301-5, Rev E, Shafting Machining Details to Suit If 1312 MDE
Coast Guard Drawing 75-WAGL 4400-3, Rev L, Propeller to Suit IF1312 MDE
Coast Guard Drawing 75-WAGL 4301-5, Rev N, Shafting Machining Details to Suit If 1312 MDE
Coast Guard Drawing FL 1204-3, Rev A, Welded Padeyes & Links
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Drawing 75E WLR 3603-001, Rev 4, Arrgt. Of Pot. & San. Water Piping
Coast Guard Drawing 75E-WLR 3802-4 Rev 1, Heat & A/C Piping Mn Dk & Above
Coast Guard Drawing 75E WLR 4803-2, Rev 2, Fire Piping Arrangement
Coast Guard Drawing FL 533-001, Rev B, Placard Potable Water Flush
Coast Guard Drawing FL 533-002, Rev-, Point of Use Water Filter Install
Coast Guard Fleet Drawing FL 2602-10, Rev R, Spud Arrangements and Details
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
Coast Guard Drawing 75E-WLR 103-006, Rev 1, Outboard Profile & General Arr (KICKAPOO)
Coast Guard Drawing 75E-WLR 3601-02, Rev 1, Shower Dets
Coast Guard Drawing 75-WLR-6201-001, Modification to Bridge 12/24VDC Emergency Power System (Pilothouse)
Coast Guard Drawing 75C-WAGL-6201-029, Electrical One-Line Block & Elem Wiring Diagram
Coast Guard Drawing 75D-WAGL-6201-005, Electrical One-Line Block Wiring Diagram
Coast Guard Drawing 75E-WLR-6201-054, Electrical One-Line Block & Elem Wiring Diagram
Coast Guard Drawing 75F-WLR-300-001, Electrical One-Line Diagram
Coast Guard Drawing 75-WAGL-6700-001, Arrangement of Electronic Equipment and Block Wiring Diagram (Note 3)
Coast Guard Drawing 75C-WAGL-6201-026, Bridge Console UPS Install
Coast Guard Drawing 75-WLR-6713-001, Electronic Charting System Block Wiring Diagram & Installation Details vii (Rev-0)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary Services
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary Hull Accesses
Coast Guard Technical Publication (TP) 3494, 09-DEC-03, Shaft Seal - Type Fse
Coast Guard Technical Publication (TP) 5491, SWBS 256, Apr 2013, Keel Grid Cooler (Duramax)
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects
American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and Welding End
APM: If work is being done in DD, no cofferdam is needed; delete cofferdam protective measures paragraph 3.1.3 and above NAVSEA ref. Above NAVSEA ref is accessible on-line
ASTM International (ASTM) B 843, 2007, Standard Specification for Magnesium Alloy Anodes for Cathodic Protection
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1709, 2008, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method viii (Rev-0)
ASTM International (ASTM) D1922, 2008, Standard Test Method for Propagation Tear Resistance of Plastic Film and Thin Sheeting by the Pendulum Method
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN)
ASTM International (ASTM) D882, 2009, Standard Test Method for Tensile Properties of Thin Plastic Sheeting
ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates
Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust- Petrolatum
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Fernstrum Gridcooler Installation and Maintenance Manual, 2013, Form 175
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2018 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required
MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-S-45180, 1998, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-STD-2191, Nov 1992, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA- PRO-160, Nov 2011, Chapter 16, Cofferdams
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning ix (Rev-0)
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings SSPC-SP 11, Jul 2012, Power Tool Cleaning to Bare Metal x (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
11 Y **Propulsion Tail Shaft NSN: 2010-01-557-1512 2 ea. 31,000.00 11 N ** Bulkhead Seal NSN: 5330-01-F13-3234 2 ea. 5,400.00 11 N **Pedestal Line Shaft
Bearing NSN: 3130-01-F11-2242 2 ea. 2,700.00
14 N Wartsila FSE H74537-02 Major Overhaul Kit
(WLP001365-001)
NSN: 01-560-3274 2 ea. 7,680.00
19 Y **Propeller, LH NSN: 2010-01-534-9095 1 ea. 13,000.00 19 Y **Propeller, RH NSN: 2010-01-534-9089 1 ea. 13,000.00 19 N **Nut, Propeller-Heavy NSN: 2010-01-F18-5562 2 ea. 698.00 20 N **MDE Grid Cooler
(SC-418DP-114)
NSN: 2040-01-F11-2291 2 ea. 10,800.00
20 N **SSDG Grid Cooler
(SC-216DP-63)
NSN: 2040-01-F11-2290 2 ea. 4,500.00
21 N ***Fathometer Transducer (Furuno 520
BLD)
NSN: 5845-01-521-8278 1 ea. 350.00
22 N Gate Valve, Flanged PN: Style 1306 1 ea. 1,500.00 22 N Gate Valve, Flanged PN: Style 490 1 ea. 400.00 23 N Strainer, Sediment, Duplex (Flanged)
NSN: 4730-01-627-3047 /
PN: ST053025BF11TS
1 ea. 7,200.00
23 N Strainer, Sediment, Duplex (Threaded)
PN: ST053015BT11TS 1 ea. 5,500.00
24 Y **Rudder - Steering NSN: 2040-01-530-9095 2 ea. 28,675.25 24 Y **Rudder - Flanking NSN: 2040-01-531-4393 2 ea. 37,850.50 24 N **Upper Rudder bearing
(SKF PN
23222CC/W33)
NSN: 3110-01-F11-2241 4 ea. 550.00
24 N Seal Assembly, Rudder Stock (H75492-01)
NSN: 5330-01-565-9776 4 ea. 8,200.00
42 N ***Fathometer Transducer (Furuno 520
BLD)
NSN: 5845-01-521-8278 2 ea. 350.00
48 N Strainer, Sediment, Simplex (Flanged)
NSN: 4730-01-428-3199 /
PN: ST0720400F1C
1 ea. 5,200.00
60 N Flush Deck Scuttle, Steel BFHR20A/S 1 ea. 895.00
63 N INVERTER/CHARGER,
2 KVA, 120VAC,
24VDC, VICTRON
MULTIPLUS C
24/2000/50-50 120V
NSN: 6130-17-127-1455
P/N: CMP242022100
1 ea. 1,250.00 xi (Rev-0)
63 N D34M Marine Deep Cycle Blue Top Battery, 750CCA, Optima Group
NSN: 6140-01-475-9355
P/N 8016-103
2 ea. 260.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item
Title
3 Hull Plating, U/W Body, Ultrasonic Testing - Tender
4 U/W Body, Preserve, 100 percent - Tender
6 Appendages, U/W, Leak Test - Tender
9 Tanks, MP Fuel Service, Clean and Inspect - Tender
11 Propulsion Shafting; Remove, Inspect, and Reinstall
13 Propulsion Shafting, Optical or Laser Alignment Check
14 Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew
15 Propulsion Shaft Bearings, External, Renew
16 Propulsion Shaft Bearings, External, Check Clearances
24 Rudder Assembly, Remove, Inspect And Reinstall
31 Drydock - Tender
35 Hull Plating, U/W Body, Ultrasonic Testing - Barge
36 Appendages, U/W, Leak Test - Barge
38 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - Barge
39 Tanks, Ballast, Clean and Inspect - Barge
42 U/W Body, Preserve, 100 percent - Barge
48 Sea Strainers, Duplex, All Sizes, Overhaul - Barge
54 Drydock - Barge xiii (Rev-0)
PRINCIPAL CHARACTERISTICS - TENDER
75’ WLR (E-CLASS: CGC KICKAPOO), INLAND RIVER BUOY TENDER
PHYSICAL
Length overall 75' 5-1/2" Depth 7' 8-1/2" Maximum beam 22' 5" Height of highest projection N/A Full load draft 4' 0” LCF Draft Full load displacement 118.15 Long Tons Fresh Water Shore tie voltage requirements N/A Frame spacing 1' 6"
MACHINERY
Number of propellers 2 Number of blades 4 Diameter of propeller 48" Pitch 43" fixed
RPM 410
xiv (Rev-0)
PRINCIPAL CHARACTERISTICS - BARGE
130' CGB, BARGE
PHYSICAL
Length overall 130' 0" Depth 7' 6" Maximum beam 30' 0" Frame spacing 15" - 30" Full load draft 4’ 3" (LCF Draft) Full load displacement 240.76 Long Tons SW
1 (Rev-0)
00000_0522_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan as requested in the Fire Protection and Response work item, with the Contractor’s bid.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, seven (7) days before the Arrival Conference.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3 (Rev-0)
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurements” for coating thickness is defined as follows:
SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5 inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B- Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY- 130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B- Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 are considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that
4 (Rev-0) develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g. Base) Regulations and Instructions for details regarding local policies (e.g. crane services, parking, or facility usage).
3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2022 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 8636. Add missing paragraphs between 3.2 and 3.5 of Std Spec 8636 as follows:
“3.3 Access cut boundaries. The Contractor shall ensure that access cuts comply with the requirements and restrictions detailed in the following and in SFLC Std Spec 0740, and referenced codes.
3.3.1 Location of boundaries. Boundaries of access cuts and closure plates shall, in general, be located between principal ship framing, bulkheads, and other structural
5 (Rev-0) members and shall be at least three inches from any of these members or from the toes of other welds. A reduction in this three inch minimum may be approved by the KO on a case by case basis provided sufficient clearance is maintained for welding and inspection requirements. The boundaries of access cuts and closure plates should land on existing butts or seams, wherever practicable. The boundaries of prior access cuts should be utilized wherever possible. Boundaries may extend across one or more frames as required for the size of the opening.
3.3.2 Access hole dimensions and arrangements. Holes or access cuts shall be the minimum size necessary and shall be in accordance with the following:
Rectangular access cuts and closure plates welded into primary hull structure shall be at least 12 inches wide in the lesser dimension.
For circular access cuts, the minimum diameter shall be 4T, where T = thickness of the involved structural member, but not less than three inches.
Circular closure plates for access cuts less than two feet in diameter shall be dished 1/16 to 1/8 inch to allow for shrinkage when welded.
Corners of rectangular access cuts and closure plates shall have a minimum radius of 6 inches except when a boundary lands on an existing hull longitudinal seam or transverse butt weld.
Corners at an existing seam or butt shall intersect at a 90 degree angle.
Cuts that are to cross existing butts or seams shall do so at an angle of 90 degrees plus or minus 15 degrees.
In primary hull structure, existing welds forming the boundary of a cut shall be cut back 3 inches beyond the toe of the access cut, except that the cut back shall not intersect or cross an existing weld, frame, or structural member. In which case, the cut back may be reduced to a minimum of two inches in length.
Existing welds crossed by the cut shall not be cut back.
3.3.3 Primary hull structure. Primary Hull Structure includes the shell, main strength decks, principal longitudinal bulkheads, vertical keel, deep web girders and stiffeners designed to withstand the ship bending stress.
3.3.4 Mechanically fastened joints. Welding closer than six inches to a mechanically fastened joint should be avoided. When access cuts cross or come within six inches of a mechanically fastened joint, the fasteners shall be checked for tightness and if necessary, loose fasteners shall be seal welded or removed, and replaced for a distance of 6 inches beyond the edge of the cut. When a cut crosses a mechanically fastened seam the cut plates shall be repaired using single V welds backed with glass tape (MIL-C-20079) to prevent fusion between the mechanically fastened plates.
3.4 Ship integrity maintenance. The Contractor shall maintain safety and ship integrity by installing temporary guarding and coaming, in addition to weathertight and watertight closures. Remove these temporary fabrications after closing the hull access, and grind surfaces flush in way of removals. For shell plating cuts made at or below the waterline where temporary closures are impractical, the Contractor shall secure each vulnerable compartment and subdivision to minimize potential damage to the extent permitted by the scope and urgency of the work.
6 (Rev-0)
3.4.1 Guarding. Install temporary guards in accordance with 29 CFR 1915.73.
3.4.2 Coaming. Ensure that in areas where flammable liquids may be stored, a 4 inch high metal coaming shall be installed on the surface of the deck with tack welds and fully sealed with caulking compound. The coaming shall encircle the access cut in the deck.
3.4.3 Weathertight and contamination closures. Fabricate temporary closures, using fire retardant material, before cutting access openings and install closures whenever access is not in use. Closures shall be:
Constructed to protect the access from inclement weather and entry of contaminants (shall include a coaming or dam on the deck to redirect rain runoff away from the opening).
Fitted with fasteners that permit rapid installation and removal.
Able to support a minimum of 150 pounds per square foot for horizontal deck closures.
Where the access opening is in way of a removed hatch, scuttle or door, the closure shall be configured to allow normal passage of ship’s personnel and equipment.
3.4.4 Watertight closures. Ensure that access openings created four feet or less above the maximum anticipated waterline shall include temporary watertight closures when the vessel is waterborne.
NOTE
NAVSEA S0600-AA-PRO-160/CH16 provides requirements for design, fabrication, and installation of temporary watertight closures.”
3.7.2 SFLC Standard Specification 0000. Replace paragraph 3.3.4 Vessel access, as follows:
"3.3.4 Vessel access. During work at the Contractor’s facility, provide access and/or egress to and from the vessel in accordance with 29 CFR 1915.74, Subpart E. Provide a minimum of two gangways that have the following:
Adequate walking surface width and strength and be safely secured.
A railing, with a mid-rail, on each side of the gangway, and a turn table if necessary.
Substantial steps properly secured and equipped with at least one handrail, when the upper end of the gangway rests on or is flush with the top of the bulwark of the dock.
Nets or other suitable protection on both sides, when there is a danger of personnel falling between the ship and the dock. Nets and other suitable protection must extend beyond the projected area of the access and egress points so as to catch a personnel that may be falling outward: i.e., the nets must be wider than the gangway.
Proper trimming at all times.
Adequate illumination for their full length.
Separated by one-fourth the length of the vessel, at a minimum, as to mitigate the possibility that an incident could block both means of escape."
7 (Rev-0)
3.7.3 SFLC Standard Specification 8635. Replace and add paragraphs as follows, "3.3.10.4.1 Contractor-furnished supporting equipment. Provide all hoses and fittings needed to supply water to the system. Provide pressure gauges at the connection(s) to the ship and the furthest firehose station to allow personnel to clearly read the gage-face to demonstrate or record the required water pressure is available at all energized portions of the system."
"3.2.3 Shipboard access/egress and routing of temporary services. Maintain a primary and secondary means of access/egress for each vessel, where practicable.
Pre-plan for the installation of temporary services to minimize the total number of service leads penetrating the hull by maximizing the use of backbones and/or manifolds for industrial services. Pre-planning for the installation of temporary services shall include removal (first in, last out, when no longer required). Pay special attention to transitional spaces (cross passages, top and bottom of stairwells) where services could potentially fall and restrict emergency personnel egress and/or casualty responder access."
"3.2.3.2 Materials used for suspending temporary services. Temporary services shall be suspended at regular intervals, to prevent impeding personnel access/egress and emergency response, using a high temperature line that meets the noncombustibility test requirements contained in reference (e). When using steel wire rope, or other potentially abrasive material, an anti-chafing material shall be used to prevent damage of the temporary service line. When available, temporary service lines may be run through the ship’s structural elements (i.e., cable ways, light stanchions, etc.). When the routing of temporary services overhead is not practicable, temporary services, rigging of hoses, welding leads, and temporary lights shall be clear of the decks on temporary “trees” or brackets and be arranged to minimize tripping and other hazards."
"3.2.3.5 Quick Disconnect Fittings. QDFs shall be located within 10 feet of designated vertical and horizontal fire zone boundaries. When practicable, QDFs shall be installed within 10 feet of hull penetrations used for personnel access, to facilitate the deployment of smoke control curtains. QDFs must be capable of being disconnected safely on pressurized or energized systems unless approved for use as described in paragraph 3.2.3.7. Pressurized and disconnected QDFs must prevent wetting of energized equipment. For hull openings used for services only, QDFs are not required, provided the opening is fitted with an air and smoke control “sock” that remains in place around the services. Air and smoke control curtains are not intended to provide an air tight seal of the hull opening. Rather, the curtains or socks, are to ensure that emergency responders can control the flow of air and smoke through the opening to allow for de-smoking of compartments, and minimize “chimney” effects. Curtains shall be made of fire resistant fabric meeting the requirements of NFPA 701."
"3.2.3.7 Service lines crossing fire zone boundaries. When service lines transit a fire zone boundary which cannot be safely disconnected locally (e.g., high voltage cables), the COR shall approve, in advance, the method to safely secure and remove the service."
8 (Rev-0)
3.7.4 SFLC Standard Specification 6310.
3.7.4.1 On page 2, replace REFERENCE “MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application” with “MIL-PRF-24667D, FEB 2021, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application”
3.7.4.2 On page 9, replace the NOTE under paragraph 3.1.8.5 as follows:
NOTE
De-ionized water may be used in cases where available fresh water has excessive chloride/chlorine content. Submit a CFR prior to using de-ionized water.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
9 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
10 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
11 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .