This document contains a pricing schedule and cost estimate template for dry dock repairs to the USCGC KICKAPOO in fiscal year 2024. The schedule lists over 60 line items for work on both the cutter and its barge, including inspection and preservation of hull plating and appendages, tank cleaning, propulsion system overhaul, deck repairs, and installation of an emergency power system on the bridge. Labor rates by location are provided in the cost estimate template. The related federal contract opportunity is solicitation number 70Z08523RIBCT0006 for dry dock repairs to WLR 75406 in FY24 issued by the Department of Homeland Security, United States Coast Guard. Offerors would provide products, services, and pricing in response to the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC KICKAPOO (WLR-75E) DRYDOCK AVAILABILITY FY2024 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | NSP | JOB | 1 | NSP |
| D-002 | Hull Plating, U/W Body, Inspect - Tender | JOB | 1 | $0.00 | |
| D-003 | Hull Plating, U/W Body, Ultrasonic Testing - Tender | JOB | 1 | $0.00 | |
| D-004 | U/W Body, Preserve, 100 percent - Tender | JOB | 1 | $0.00 | |
| D-005 | Hull Plating Freeboard, Preserve, 100 Percent - Tender | JOB | 1 | $0.00 | |
| D-006 | Appendages, U/W, Leak Test - Tender | JOB | 1 | $0.00 | |
| D-007 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | $0.00 | |
| O-008 | Appendages, U/W, Internal, Preserve - Tender | JOB | 1 | $0.00 | |
| D-009 | Tanks, MP Fuel Service, Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-010 | Tanks, Potable Water, Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-011 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| O-012 | Propulsion Shafting, Straighten | JOB | 1 | $0.00 | |
| O-013 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | 1 | $0.00 | |
| D-014 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | JOB | 1 | $0.00 | |
| O-015 | Propulsion Shaft Bearings, External, Renew | JOB | 1 | $0.00 | |
| D-016 | Propulsion Shaft Bearings, External, Check Clearances | JOB | 1 | $0.00 | |
| D-017 | Stern Tube Interior Surfaces, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| O-018 | Propeller, Perform Minor Repairs and Reconditioning | JOB | 1 | $0.00 | |
| D-019 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-020 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | $0.00 | |
| D-021 | Fathometer Transducer, General Maintenance | JOB | 1 | $0.00 | |
| D-022 | Sea Valves and Waster Pieces, Overhaul Or Renew - Tener | JOB | 1 | $0.00 | |
| D-023 | Sea Strainers, All Sizes, Renew - Tender | JOB | 1 | $0.00 | |
| D-024 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | $0.00 | |
| D-025 | Rudders, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| D-026 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | $0.00 | |
| D-027 | Spuds, Overhaul - Tender | JOB | 1 | $0.00 | |
| D-028 | Spud Wells, Preserve - Tender | JOB | 1 | $0.00 | |
| O-029 | Tanks, Potable Water, Preserve, Partial, - Tender | JOB | 1 | $0.00 | |
| D-030 | Cathodic Protection, Magnesium Anodes, Renew, - Tender | JOB | 1 | $0.00 | |
| D-031 | Drydock - Tender | JOB | 1 | $0.00 | |
| D-032 | Temporary Services, Provide - Tender | JOB | 1 | $0.00 | |
| D-033 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-034 | Hull Plating, U/W Body, Inspect - Barge | JOB | 1 | $0.00 | |
| D-035 | Hull Plating, U/W Body, Ultrasonic Testing - Barge | JOB | 1 | $0.00 | |
| D-036 | Appendages, U/W, Leak Test - Barge | JOB | 1 | $0.00 | |
| O-037 | Appendages, U/W, Internal, Preserve - Barge | JOB | 1 | $0.00 | |
| D-038 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - Barge | JOB | 1 | $0.00 | |
| D-039 | Tanks, Ballast, Clean and Inspect - Barge | JOB | 1 | $0.00 | |
| O-040 | Tanks (Ballast), Preserve "Partial" - Barge | JOB | 1 | $0.00 | |
| D-041 | Keel Coolers, Clean, Inspect and Hydro - Barge | JOB | 1 | $0.00 | |
| D-042 | Fathometer Transducer, General Maintenance - Barge | JOB | 1 | $0.00 | |
| D-043 | U/W Body, Preserve, 100 percent - Barge | JOB | 1 | $0.00 | |
| D-044 | Hull Plating Freeboard, Preserve, 100 Percent - Barge | JOB | 1 | $0.00 | |
| D-045 | Cathodic Protection, Magnesium Anodes, Renew - Barge | JOB | 1 | $0.00 | |
| D-046 | Temporary Services, Provide - Barge | JOB | 1 | $0.00 | |
| D-047 | Sea Valves and Waster Pieces, Overhaul Or Renew - Barge | JOB | 1 | $0.00 | |
| D-048 | Sea Strainers, Simplex, Overhaul - Barge | JOB | 1 | $0.00 | |
| D-049 | Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-050 | Hull Fittings (Mooring and Towing), Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-051 | Spuds, Overhaul - Barge | JOB | 1 | $0.00 | |
| D-052 | Spud Wells, Preserve - Barge | JOB | 1 | $0.00 | |
| D-053 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $0.00 | |
| D-054 | Drydock - Barge | JOB | 1 | $0.00 | |
| D-055 | Boat Davit Winch, Shrink Wrap | JOB | 1 | $0.00 | |
| D-056 | Buoy and Cargo Handling Crane, Shrink Wrap | JOB | 1 | $0.00 | |
| D-057 | Decks – Exterior, Preserve, Non-Skid Broadcast Grit System - Barge | JOB | 1 | $0.00 | |
| D-058 | Bosun Hole Ladders, Repair | JOB | 1 | $0.00 | |
| D-059 | Crews Head Deck Repair | JOB | 1 | $0.00 | |
| D-060 | Scuttle, Renew | JOB | 1 | $0.00 | |
| D-061 | Deck Covering (Carpeting), Renew | JOB | 1 | $0.00 | |
| D-062 | Compartment Bulkheads and Overheads, Preserve | JOB | 1 | $0.00 | |
| D-063 | Bridge Equiopment Emergency Power System, Install | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 560 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(5/17/2023)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |