Attachment 1- SOSS.xls

XLS spreadsheet 81 KB Posted

Attached to
Dry Dock(DD): USCGC KICKAPOO DD FY24 (WLR 75406) FY24 DD Repairs
Solicitation number
70Z08523RIBCT0006
Issued by

About this file

This document contains a pricing schedule and cost estimate template for dry dock repairs to the USCGC KICKAPOO in fiscal year 2024. The schedule lists over 60 line items for work on both the cutter and its barge, including inspection and preservation of hull plating and appendages, tank cleaning, propulsion system overhaul, deck repairs, and installation of an emergency power system on the bridge. Labor rates by location are provided in the cost estimate template. The related federal contract opportunity is solicitation number 70Z08523RIBCT0006 for dry dock repairs to WLR 75406 in FY24 issued by the Department of Homeland Security, United States Coast Guard. Offerors would provide products, services, and pricing in response to the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC KICKAPOO (WLR-75E) DRYDOCK AVAILABILITY FY2024
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Fire Prevention RequirementsNSPJOB1NSP
D-002Hull Plating, U/W Body, Inspect - TenderJOB1$0.00
D-003Hull Plating, U/W Body, Ultrasonic Testing - TenderJOB1$0.00
D-004U/W Body, Preserve, 100 percent - TenderJOB1$0.00
D-005Hull Plating Freeboard, Preserve, 100 Percent - TenderJOB1$0.00
D-006Appendages, U/W, Leak Test - TenderJOB1$0.00
D-007Propulsion Shaft Rope Guards, InspectJOB1$0.00
O-008Appendages, U/W, Internal, Preserve - TenderJOB1$0.00
D-009Tanks, MP Fuel Service, Clean and Inspect - TenderJOB1$0.00
D-010Tanks, Potable Water, Clean and Inspect - TenderJOB1$0.00
D-011Propulsion Shafting; Remove, Inspect, and ReinstallJOB1$0.00
O-012Propulsion Shafting, StraightenJOB1$0.00
O-013Propulsion Shafting, Optical or Laser Alignment CheckJOB1$0.00
D-014Propulsion Shaft Seals, Mechanical Overhaul and Inflatable RenewJOB1$0.00
O-015Propulsion Shaft Bearings, External, RenewJOB1$0.00
D-016Propulsion Shaft Bearings, External, Check ClearancesJOB1$0.00
D-017Stern Tube Interior Surfaces, Preserve, 100 PercentJOB1$0.00
O-018Propeller, Perform Minor Repairs and ReconditioningJOB1$0.00
D-019Propellers, Remove, Inspect, and ReinstallJOB1$0.00
D-020Keel Coolers, Clean, Inspect and HydroJOB1$0.00
D-021Fathometer Transducer, General MaintenanceJOB1$0.00
D-022Sea Valves and Waster Pieces, Overhaul Or Renew - TenerJOB1$0.00
D-023Sea Strainers, All Sizes, Renew - TenderJOB1$0.00
D-024Rudder Assembly, Remove, Inspect And ReinstallJOB1$0.00
D-025Rudders, Preserve, 100 PercentJOB1$0.00
D-026Hull Fittings (Mooring and Towing), Inspect and Test - TenderJOB1$0.00
D-027Spuds, Overhaul - TenderJOB1$0.00
D-028Spud Wells, Preserve - TenderJOB1$0.00
O-029Tanks, Potable Water, Preserve, Partial, - TenderJOB1$0.00
D-030Cathodic Protection, Magnesium Anodes, Renew, - TenderJOB1$0.00
D-031Drydock - TenderJOB1$0.00
D-032Temporary Services, Provide - TenderJOB1$0.00
D-033Sea Trial Performance, Support, ProvideJOB1$0.00
D-034Hull Plating, U/W Body, Inspect - BargeJOB1$0.00
D-035Hull Plating, U/W Body, Ultrasonic Testing - BargeJOB1$0.00
D-036Appendages, U/W, Leak Test - BargeJOB1$0.00
O-037Appendages, U/W, Internal, Preserve - BargeJOB1$0.00
D-038Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - BargeJOB1$0.00
D-039Tanks, Ballast, Clean and Inspect - BargeJOB1$0.00
O-040Tanks (Ballast), Preserve "Partial" - BargeJOB1$0.00
D-041Keel Coolers, Clean, Inspect and Hydro - BargeJOB1$0.00
D-042Fathometer Transducer, General Maintenance - BargeJOB1$0.00
D-043U/W Body, Preserve, 100 percent - BargeJOB1$0.00
D-044Hull Plating Freeboard, Preserve, 100 Percent - BargeJOB1$0.00
D-045Cathodic Protection, Magnesium Anodes, Renew - BargeJOB1$0.00
D-046Temporary Services, Provide - BargeJOB1$0.00
D-047Sea Valves and Waster Pieces, Overhaul Or Renew - BargeJOB1$0.00
D-048Sea Strainers, Simplex, Overhaul - BargeJOB1$0.00
D-049Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - BargeJOB1$0.00
D-050Hull Fittings (Mooring and Towing), Inspect and Test - BargeJOB1$0.00
D-051Spuds, Overhaul - BargeJOB1$0.00
D-052Spud Wells, Preserve - BargeJOB1$0.00
D-053Decks – Exterior (Buoy or Construction Deck), Preserve 100%JOB1$0.00
D-054Drydock - BargeJOB1$0.00
D-055Boat Davit Winch, Shrink WrapJOB1$0.00
D-056Buoy and Cargo Handling Crane, Shrink WrapJOB1$0.00
D-057Decks – Exterior, Preserve, Non-Skid Broadcast Grit System - BargeJOB1$0.00
D-058Bosun Hole Ladders, RepairJOB1$0.00
D-059Crews Head Deck RepairJOB1$0.00
D-060Scuttle, RenewJOB1$0.00
D-061Deck Covering (Carpeting), RenewJOB1$0.00
D-062Compartment Bulkheads and Overheads, PreserveJOB1$0.00
D-063Bridge Equiopment Emergency Power System, InstallJOB1$0.00
O-00AComposite Labor RateHour5600
D-00BGFP ReportNSPEANSP
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(5/17/2023)

Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .