Attachment 2 Specification AC Water Regulating Valve.pdf
PDF 156 KB Posted
- Attached to
- Metrex Valve A/C Water Regulating Valve FY 24
- Solicitation number
- 70Z08524RAB037B00
About this file
This document is a technical specification for the purchase of 66 A/C water regulating valves required for the U.S. Coast Guard's 418' National Security Cutters. The valves are to be manufactured by Metrex Valve Corp. to specific part number and technical requirements, including a 3-inch 3-way marine valve with CuNi body and NiCu components, 150 PSI max inlet pressure, and 50-250 PSIG refrigerant range.
The related federal contract opportunity is a combined synopsis/solicitation issued by the U.S. Coast Guard Surface Forces Logistics Center for the purchase of these valves. The anticipated award date is September 24, 2024, and quotes are due by September 11, 2024. The valves are to be delivered to the U.S. Coast Guard Surface Forces Logistics Center in Baltimore, MD. The NAICS code for this contract is 332911 Industrial Valve Manufacturing with a size standard of 750 employees.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Schedule of Supplies.xlsx | XLSX spreadsheet | |
| Solicitation 70Z08524RAB037B00.pdf | ||
| Attachment 3 Request_for_Questions_and_Answers.doc | DOC document | |
| JOTFOC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION FOR T H E
P U R C H A S E O F WMSL A/C
WATER REGULATING VALVES
Date: 13 MAR 2024
SPECIFICATION
FOR THE PURCHASE OF WMSL A/C
WATER REGULATING VALVES
1.0 SCOPE:
1.1. This document sets forth the requirements for the purchase, receipt, inspection, testing, preservation, packaging, packing, and marking of the required OEM - Metrex Valve Corp.
valve referenced in 1.2. Items purchased must be complete and of the proper cited part number.
1.2. Requirements: 3 inch, 3-WAY MARINE REG VALVE, SPECIAL CuNi BODY and
NiCu COMPONENTS, MARINE SERVICE ANSI FLANGE CONNECTIONS, 150
PSI MAX. INLET PRESSURE, 50-250 PSIG REFRIGERANT RANGE. FLARE
FITTING BELLOWS, TRIM 'B' CV 50
Name Part Number NSN QTY
VALVE, REGULATING,
SYSTEM PRESSURE
MDFPMF-
3120MCFL-
3W-TB
4820-01-677-2397 66
2.0 APPLICABLE DOCUMENTS:
2.1. General: The documents listed in this section are specified in this specification.
2.2. Government Documents
2.2.1. MIL-STD-129R (2), 27 SEP 2019, Department of Defense Standard Practice, Military Marking for Shipment and Storage.
2.2.2. MIL-STD-2073-1E (4), 22 APR 2019 Standard Practice for Military
Packaging
2.2.3. SFLC Standard Weld Specification 0740 – 2022
2.2.4. SFLC specification D-000-0100
2.3. Commercial Documents
2.3.1. ISO 9001 Quality Management Systems 2015
2.3.2. ISO/IEC 17025:2017 Requirements for the Competence of
Testing and Laboratories with Calibration of Measuring and
Test Equipment
2.3.3. ISPM-15, Regulation of wood packaging material in
international trade, 2021
2.4. Order of Precedence
2.4.1. In the event of a conflict between the text of this specification and the references cited herein, this specification shall take precedence. However, nothing in this specification supersedes applicable laws and regulations unless a specific exemption has been obtained.
2.5. Document Availability
2.5.1. See paragraph 6.1 for document sources.
3.0 REQUIREMENTS:
3.1. General Requirements
3.1.1. The Contractor shall provide all equipment, labor, and materials to provide, test, preserve, package, pack & mark, ready-for issue Valves in NEW condition within this contract requirement. Valves must be manufactured in accordance with OEM part number specifications.
3.1.2. The valve special features include: 3" 3-WAY MARINE REG VALVE, SPECIAL CuNi BODY and NiCu COMPONENTS, MARINE SERVICE
ANSI FLANGE CONNECTIONS, 150 PSI MAX. INLET PRESSURE, 50-
250 PSIG REFRIGERANT RANGE. FLARE FITTING BELLOWS, TRIM
'B' CV 50
3.1.3. End Item Identification 130 Ton Water Chilling Plant, part number 477-
17721-000
3.1.4. The contractor shall prepare and submit a test plan to the Contracting Officer with their proposal in response to the contract solicitation for consideration as part of the technical document submission.
3.1.5. Material certificates for all parts including sub-assemblies must be provided to the Coast Guard Contracting Officer for review.
3.1.6. KTR must provide Parts List, Dimensional Report, Testing report to KO for COR review.
3.1.7. Warranty: standard commercial warranty must be incorporated into this contract and thereby provided to the Government at no additional cost.
3.1.8. Marking or Stamping a Serial Number (Date and 1-66) on all valves
Assemblies for identification purposes because QAR will need to verify during onsite inspection.
3.2 Valve Assembly
3.2.1 The contractor shall provide the quantity of valves listed in paragraph 1.2 in a fully assembled and ready for installation state.
3.3 Valve Testing
3.3.1 The inspections & tests required are the minimum necessary and are not intended to replace any controls, examinations, or tests normally employed by the Contractor to assure the quality of the product. The following inspections and documentation shall be observed by a USCG Quality Assurance
Representative. Copies of all the required documents shall be provided upon arrival for inspection to the QAR.
▪ Material Certifications
▪ Certificate of Conformance (Clause 52.246-15)
▪ Weld Certifications – IAW SFLC Standard Weld Specification 0740 –
▪ Operational test results
▪ Conformance to dimensions, tolerances, surface texture and overall workmanship requirements.
▪ Overall assembly completeness as required by this statement of work.
▪ Inspection of preservation, packaging, packing, and marking.
If the specified item fails to pass any inspection/test, the Contractor shall report the failure and the recommended corrective action to the KO. If approved, the corrective action on the materials or processes shall be accomplished IAW this section.
4.0 QUALITY ASSURANCE REQUIREMENTS:
4.1 Quality Assurance:
4.1.1. General: Each new fully assembled valve shall be tested, and the results of testing shall be recorded by the contractor and submitted to the Contracting
Officer for approval prior to scheduling Coast Guard Quality Assurance inspections. The Coast Guard reserves the right to send a Coast Guard
Quality Assurance Representative (QAR), to witness and review all quality control procedures and tests. All testing will be accomplished on contractor supplied calibrated test equipment as listed in section 2.3.2. All testing shall be accomplished IAW OEM specifications and procedures and shall be made available to the QAR. It is the Government’s intention to have
Coast Guard Quality Assurance representative witness “the final testing”, and preservation, packaging, packing, and marking of these valves prior to delivery to the Coast Guard.
4.1.2. Quality system: The Contractor shall maintain an inspection system which shall insure that each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements in accordance with the
International Organization for Standardization (ISO), ISO 9001:2015. The inspection system shall be documented and available for review by the
QAR.
4.1.3. Contractor’s calibration system: The Contractor as well as any subcontractors shall be required to maintain a calibration and maintenance system to control the accuracy of measurement and test equipment used in the fulfillment of this contract in accordance with ISO/IEC 17025:2017. The system shall include as a minimum, prescribed calibration intervals, source of calibration, and a monitoring system to ensure adherence to calibration schedules. Calibration standards shall be traceable to the National Institute of
Standards and Technology (NIST). Documentation in support of this requirement shall be readily available for Government review.
4.1.4. For the safety of Coast Guard personnel, QAR, and shop workers, all QA inspections shall be completed indoors away from normal shop work, operating machinery, loud noise, welding (arching) and grinding operations if permissible.
5.0 PRESERVATION, PACKAGING, PACKING & MARKING:
5.1. General: The items cited in paragraph 1.2 shall be individually preserved, packaged, and packed in its own reusable container in accordance with MIL-STD-
2073-1E (Ref 2.2.2). The Contracting Officer shall be notified prior to the packaging and marking of the completed units.
5.1.1. All wood material used for packaging shall meet phytosanitary requirements IAW reference 2.3.3.
5.1.2. Each valve assembly shall be cleaned, packed and marked as specified.
5.1.3. Each valve assembly with its associated hardware items shall be individually packaged in its own completely enclosed shipping container.
Container shall have a common lid attached with self-tapping wood screws for easy access. The valve and all associated hardware shall be secured in the container with blocking and/or cushioning to prevent the packed items from shifting inside the container or being damaged during shipment.
5.1.4. Any portion of the valve protruding shall have a protective card board, wood cover, or PVC pipe to protect the exposed threads or openings.
5.1.5. The use of particle board or OSB is not acceptable. The container shall be capable of protecting the valve from damage during multiple shipments by a commercial carrier.
5.1.6. The approved and Coast Guard QAR verified final testing results shall be sealed in a plastic sleeve or bag and enclosed in each shipping container.
5.2. Marking for Shipment:
5.2.1. Each item shall be marked (IAW MIL-STD-129R (2), 27 SEP 2019) in the upper left-hand side of the two longest sides (two opposite sides if square) of each box. The Markings shall be made with machine-made stencils. The lettering / numbering shall be at least 3/8 inch high, in permanent black printed characters on a highly contrasting “white painted” background.
5.2.2. This marking shall consist of the STOCK NUMBER, ITEM NAME, PART
NUMBER, CONTRACT NUMBER, SERIAL NUMBER, GROSS
WEIGHT (in lbs.), condition code CONDITION “A”, unit of issue with quantity (i.e. 1-EA), and the words COAST GUARD SFLC MATERIAL:
STOCK NUMBER See Contract
ITEM NAME See Contract
PART NUMBER See Contract
CONTRACT NUMBER See Contract
SERIAL NUMBER
SHIPPING WEIGHT As Determined by Contractor
CONDITION CODE CONDITION “A”
UNIT OF ISSUE 1- EACH
COAST GUARD SFLC MATERIAL
REUSABLE CONTAINER, DO NOT DESTROY
BAR CODE REQUIRMENT:
Bar code labels shall be supplied on all packages except for those that require data submissions only.
All bar-coded labels shall be IAW SFLC specification D-000-0100.
a. The actual labels shall be Type “V“, Grade “A“, Style “2“, Composition “b” with plastic laminate.
b. Each label shall contain encoded data (MIL39) for the Stock
Number.
5.3. Shipping:
5.3.1. General: When authorized by the KO, the contractor shall ship all units to:
US Coast Guard
Surface Forces Logistics Center
2401 Hawkins Point RD, Bldg. 88
Baltimore, MD 21226
6.0 NOTES:
6.1. Document Sources:
6.1.1. DOD & Navy Publication &Forms
Navy Publications and Forms Center
5801 Tabor Ave.
Philadelphia, PA 19120
USA
6.1.2. American Society for Quality
600 North Plankinton Avenue
Milwaukee, WI 53203 USA www.asq.org
6.1.3. American Society for Testing and Materials
ASTM
100 Barr Harbor Drive West Conshohocken PA 19428-2959 www.astm.org
6.1.4. National Conference of Standards Laboratories International
ISO Central Secretariat Chemin de Blandonnet 8 CP 401 - 1214 Vernier, Geneva, Switzerland www.iso.org http://www.asq.org/ http://www.astm.org/ http://www.iso.org/
File details come from the government source that posted it. Updated .