This is a Statement of Work for a Vibration Test System to be procured by the Air Force Institute of Technology (AFIT). The system must include a slip table (minimum 30 inches x 30 inches with low friction horizontal motion and M10 or 3/8" SAE bolt patterns), a repositionable shaker head capable of both horizontal and vertical testing with a minimum load capacity of 29 kN (6,540 lbf) and frequency response range of 20 Hz to 2,000 Hz, and control/data collection electronics. All components must fit through a 60-inch wide, 78-inch tall doorway when delivered. The shaker must operate on 480V 3-phase 60 Hz, 208V 60 Hz, or 110V 60 Hz electrical power. The control system requires NIST calibration, programmable profiles including sine sweep, random vibration, track and dwell, and shock test capabilities with 32-bit or higher digital-to-analog conversion. The data collection system must include minimum 8 accelerometer input channels (expandable to 16) calibrated to NIST standards with software tools to minimize estimation errors in PSD plots.
The contractor must deliver the system no later than 12 weeks after contract award to AFIT/ENY at Wright-Patterson Air Force Base, Ohio (DoDAAC F4F5AV). Contract price must include on-site training for minimum 2 AFIT/ENY technicians and on-site setup and installation. All products must be manufactured in qualifying country sources per DFARS 225.872, with non-qualifying country products at contractor's expense. The contractor shall provide basic manufacturer's warranty. Payment occurs upon submission of a properly prepared invoice and final inspection acceptance, submitted through Wide Area Work Flow (WAWF). Delivery vehicle requirements include inspection by Wright-Patterson AFB Commercial Vehicle Delivery Gate (CVDG) for vehicles larger than large pick-up trucks, with specific exemptions and resealing procedures outlined for base entry protocols.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
18 December 2025
Statement of Work
For
Vibration Test System
I. Background:
The Air Force Institute of Technology does not currently have a vibration test system (vibe table), due to failure of the previous system and inability to repair a nearly 20-year-old system. A vibe table is vital to environmental testing of spacecraft components, and to AFIT research in spacecraft systems. It is used to simulate the launch environment to establish the durability of spacecraft or spacecraft components under a very harsh vibration load condition. It is also used to support aeronautical research, testing equipment to be used in flight test projects as well as operational missions.
This specification is for a vibration test system to include: slip table (A slip table is a large metal plate that can move on a low friction surface, used to mount hardware being tested securely and tie to the shaker itself. This could potentially include an expander head for vertical axis testing, depending on the configuration of the shaker itself. See section II for further details), shaker, and control/data collection electronics.
Test requirements are governed by MIL-HDBK-340A (USAF): Test Requirements for launch, Upper-Stage, and Space Vehicles”, MIL-STD-1540D: “Product Verification Requirements for Launch, Upper-Stage and Space Vehicles,” and GSFC STD-7000A: “General Environmental Verification Standard (GEVS) for GSFC Flight Programs and Projects.”
II. Minimum Technical Requirements:
The following specification lists the minimum requirements for the Vibration Test System:
1. All components must fit through a 60-inch wide, 78” tall doorway as delivered. They may be assembled to create larger assemblies within the laboratory.
2. Slip Table: shall be no less than 30 inches x 30 inches, allow low friction horizontal motion, with a bolt pattern 4 inches on center of M10 or 3/8” SAE threaded holes to allow securing hardware to the table using existing adapters and hardware (objective).
Other bolt pattern dimensions, with a similar overall size, would be considered to meet threshold requirements.
3. Expander Head: Threshold requirement would be to use the existing AFIT expander head for vertical axis testing. Interface to this expander head is via two concentric circular, 6 bolt patterns, with a 3inch radius and a 6inch radius. The expander head has through holes suitable for M10 or 3/8inch SAE bolts. If the shaker mating bolt pattern is NOT compatible with the existing expander head, an expander head shall be included. The expander head shall be no less than 22-inch square (clipped corners removing no more than 2 inches are acceptable). The bolt pattern should be similar to the pattern on the slip table: 4inch on center of M10 or 3/8inch SAE, for no less than a 20inch x 20inch pattern (objective). Other patterns that match the delivered slip table would be considered to meet threshold requirements.
4. Shaker Head: Shall be repositionable to allow both horizontal and vertical use or otherwise permit both horizontal and vertical testing.
a. Minimum load capacity of 29 kN (6,540lbf) in sine or random vibration profiles, with the capability to simulate shock profiles with high frequency excitation, as needed (threshold).
i. This was calculated based on a 48kg test unit (24kg 12U satellite, 24kg Containerized Satellite Dispenser), 10kg of adapter hardware, 100kg of slip table and adapters, at 14.1G maximum load, with a 33% margin of safety.
b. Frequency response range shall be no less than 20Hz to 2,000Hz (threshold).
c. Power requirements: Must operate on one of the following electrical power standards: a)480V 3 phase, 60 Hz, b) 208V 60Hz, c) 110V 60Hz.
d. For the Slip Table and Shaker Head: If these items must be mounted to the floor, AFIT has a seismic mass in the laboratory with 5 bolt-down slots 91 inches long, approximately ½ inch wide, and on approximately 24-inch centers. These dimensions are approximate as there is some variation. As these are set in concrete, any flexibility required will need to be on the delivered hardware. If hardware does not need to be secured to the floor, this is informational only.
5. Shaker Control System: Shall include:
a. Calibration to NIST standards
b. Programmable control profiles shall include (but do not have to be limited to):
i. Sine sweep profiles (dwell for finite, selectable time at many (800+) selectable frequencies through range from 20 to 2,000 Hz)
ii. Track and dwell functionality to determine and test resonant sine input frequencies is required.
iii. Random vibration profiles (generate input signal to drive shaker to a specified Power Spectral Density profile defined by acceleration spectral density and frequency shape)
iv. Shock Test profiles (uses vibration table/shaker to simulate very high frequency loading representing mechanical or pyrotechnic shock events)
c. All profiles must be configurable by AFIT users for frequency range, intensity, and duration.
d. Software tools to minimize estimation errors in producing PSD spectra for control inputs to prevent over-testing/under-testing.
e. Digital drive signals required for drive signal noise reduction and reduced harmonic distortion.
f. Digital to Analog Conversion of control signal to amplifier shall be 32bit or higher resolution to minimize over/under testing of hardware.
6. Data Collection System:
a. Calibration to NIST standards
b. Minimum Accelerometer Input channels: 8 (threshold) i.Expansion available to 16 channels (objective)
c. Software tools to minimize estimation errors in presenting PSD plots of measured test article accelerations.
III. Training:
Contract price shall include on-site training for a minimum of 2 AFIT/ENY technicians on operation and maintenance of the system.
IV. Installation:
Contract price shall include on-site setup and installation of the provided system to existing infrastructure.
V. Delivery:
SHIP TO DoDAAC: F4F5AV POC: Elliot Sexton (elliot.sexton@us.af.mil, 937-671-5622) / Sean Gunther (sean.gunther.1@us.af.mil, 601-497-5166)
AFIT/ENY
2950 Hobson Way
WPAFB OH 45433.
VI. Lead Time:
The contractor shall deliver ordered systems NLT 12 Weeks after contract award
VII. Qualifying Country Products All products delivered to satisfy this requirement shall be manufactured in a qualifying country source in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 225.872. Products from other than qualifying countries will not be accepted, and any costs associated with products from other than qualifying countries, including shipping, etc., shall be at the contractor’s expense
VIII. Warranty:
The contractor shall provide the basic manufacturer's warranty.
IX. Invoice and Payment
The contractor shall be paid upon submission of a properly prepared invoice and after final inspection and acceptance has been made. A proper invoice shall cite the contractor’s name and address, invoice number, invoice date, order number, contract line item number (CLIN), description of the supplies or service, unit of issue, unit price and extended price, terms of any prompt payment discount offered, and who to mailto:elliot.sexton@us.af.mil mailto:sean.gunther.1@us.af.mil notify in the event the invoice is defective. The invoice shall be submitted to in Wide Area Work Flow (WAWF) in accordance with the terms of the final contract award
X. Delivery Procedures – Commercial Vehicles:
a. The company shall ship the system to the Air Force Institute of Technology at
WPAFB, OH. All shipping costs to include insurance will be included in contractor’s proposal. Great care using standard, approved packaging methods shall be taken.
b. All vehicles larger than a large pick-up truck are required to be inspected by the Wright- Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation. Vehicles to be inspected include, but are not limited to, the following:
1. Step van/panel truck
2. Tractor/trailer, box and flatbed containing cargo
3. Tanker trucks
4. Box trucks
5. Tour buses
6. Garbage/recycled waste trucks
7. Concrete trucks/mixers, dump trucks
8. Cranes, recreational vehicles, petroleum tankers
This inspection will be conducted at Gate 26A located off State Route 235.
c. The following are exemptions to vehicles utilizing the CVDG:
1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates, and the base will not assume liability for denied access.
2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.
d. Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM.) Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.
File details come from the government source that posted it. Updated .