Attachment_2_-_SOW_Fan_Installation.pdf
PDF 111 KB Posted
- Attached to
- Mescalero Mini Split and Fans
- Solicitation number
- 140A1626Q0095
About this file
This is a Statement of Work for ceiling fan installation services at a Bureau of Indian Affairs (BIA) facility. The project requires the installation of three commercial-grade ceiling fans in the fire warehouse building (Building 94) at the BIA Mescalero Agency located at 57 Chatto Drive, Mescalero, New Mexico 88340. The contractor must install the fans at agency-designated and pre-marked locations, ensuring all electrical connections, mounting hardware, and safety checks comply with local codes and manufacturer specifications. The work requires use of a manlift to access the ceiling pitch and includes contractor responsibilities to close work areas for safety, perform daily waste disposal and cleaning, verify proper fan operation, and provide maintenance procedure training to agency staff.
The Period of Performance specifies completion within ten business days following approval, with work restricted to Monday through Friday, 8:00 a.m. to 4:30 p.m. Deliverables include three fully installed and operational commercial ceiling fans plus documentation containing installation records, warranty information, and maintenance guidelines. All work must adhere to OSHA standards and local building codes while maintaining a clean and safe work environment. The Point of Contact is Trey Kaydahzinne, Supervisory Facility Operations Specialist. The Statement of Work does not specify pricing terms, set-asides, response deadlines, or federal contract vehicles.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_1_-_Mini_Split_Installation.pdf | ||
| Sol_140A1626Q0095.pdf | ||
| Attachment_4_-_IEE_Representation_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Ceiling Fan Installation for BIA Mescalero Agency Warehouse BLDG.
94.
Project Title: Installation of Three Commercial Ceiling Fans
Location: BIA Mescalero Agency, 57 Chatto Drive, Mescalero, NM, 88340
Scope of Work:
• Install three commercial-grade ceiling fans in designated locations within the fire warehouse building (building 94) at the BIA Mescalero Agency.
• The installation sites will be specified by the agency and marked prior to commencement of work.
• The contractor shall close off work area to employees and the public for safety.
• All electrical connections, mounting hardware, and safety checks will be completed in accordance with local codes and manufacturer specifications.
• Contractor will ensure proper operation of each fan and provide a brief overview of maintenance procedures to the agency staff.
• Installation will require a manlift to reach the pitch of the ceiling where the fans will be installed.
• The contractor shall dispose of all trash/waste and clean work area daily.
Deliverables:
• Three fully installed and operational commercial ceiling fans.
• Documentation of installation, including warranty information and maintenance guidelines.
POP: Installation to be scheduled upon approval and completed within ten business days.
Safety and Compliance: All work will adhere to OSHA standards and local building codes. The contractor will maintain a clean and safe work environment throughout the installation process.
Hours of Operation: Monday – Friday 8am-4:30pm
Point of Contact: Trey Kaydahzinne, Supervisory Facility Operations Specialist
File details come from the government source that posted it. Updated .