Attachment 2_SOW - F31222_Redacted.pdf
PDF 6 MB Posted
- Attached to
- Chapel Office Furniture
- Solicitation number
- FA860126Q0049
About this file
Statement of Work Summary: Furniture Package Installation
This is a Statement of Work (SOW) for a furniture package installation project at Wright-Patterson Air Force Base, Ohio, dated April 10, 2026. The contractor must provide all supervision, labor, materials, equipment, and a certified electrician to install systems furniture to building power, including 30 days of storage and an itemized quote encompassing labor for receiving, inspection, delivery, and installation per approved final design layout. The scope includes optional AutoCAD design hours for all design phases and in-person meetings for design reviews, site visits, and field measurements. The contractor must repair or replace any flooring and ceiling damage caused by furniture installation, provide 3D renderings of each typical, source products from a single manufacturer for uniformity unless equal alternatives are proposed with matching finish basis, and deliver final AutoCAD drawings and invoices to the CE Interior Designer before government acceptance in WAWF.
The required product types include conference room seating, task seating, desks, conference tables, credenzas, occasional tables, lounge seating, and lighting. Specific items detail 20 conference room chairs (OFS Revel model 3507), 13 guest chairs (SitOnIt Focus), 2 task chairs with headrests (Humanscale Freedom), 2 desks with wardrobes (Indiana Furniture Gesso 30"x72"), 3 bookcases (Indiana Furniture Canvas 30"W), 1 large conference table (Indiana Catalyst 42"x168"), 1 medium conference table (Indiana Catalyst 42"x96"), 5 occasional tables (Indiana Bailey), 1 cocktail table (Indiana Bailey), 2 club chairs (Indiana Plush), 2 sofas (Indiana Plush), 1 settee (Indiana Plush), 3 floor lamps (Lamps Plus Serra 64"), 2 credenzas (Indiana Catalyst), and 1 magnetic glassboard (Calyx). Performance period is 120 days from contract award, with second-floor installation requiring stairway carry and dock times between 0800–1500 hours. The contractor must coordinate with base entry procedures at Gate 26A, maintain personnel security compliance, provide a contract manager and project manager with specified experience, and execute detailed design services including space planning, site verification, power distribution planning, and comprehensive layout documentation in AutoCAD and PDF formats.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .