Attachment 2 - SOW.pdf

PDF 352 KB Posted

Attached to
Campground Well Drilling
Solicitation number
127EAX26Q0066
Issued by

About this file

This is a Statement of Work (SOW) for the Lake Conasauga Water Well project at the Chattahoochee-Oconee National Forest in Georgia. The Chattahoochee-Oconee National Forest is seeking proposals for the development and construction of a potable water well at Lake Conasauga Campground (GA EPD System GA2130026) to support future construction of a replacement water system. The contractor must be licensed in the state of Georgia and coordinate all work with the Contracting Officer's Representative (COR).

The scope of work includes mobilization and demobilization, well drilling and development, yield and sample testing, installation of casing, grouting, and sanitary seal, installation of wellhead protection measures, and site restoration. The project specifications are contained in an attached document referenced within the SOW. An optional second well may be drilled if yield and/or contaminants do not meet performance requirements as specified in the project specifications. All work must be performed during normal business hours (Monday-Friday, 0800-1600) excluding federal holidays, with the COR present during all project activities.

View the file

Other files

File Type Posted
Attachment 6 - Wage Determination.txt TXT text file
Attachment 4 - Well Site Map 1.pdf PDF
Attachment 3 - Specifications.pdf PDF
Attachment 5 - Well Site Map 2.pdf PDF
Attachment 1 - SOI.docx DOCX document
127EAX26Q0066 - Campground Well Drilling.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lake Conasauga Water Well Chattahoochee-Oconee National Forest Statement of Work

1. Overview

The Chattahoochee-Oconee National Forest is seeking proposals for the development and construction of a potable water well at the Lake Conasauga Campground (GA EPD System GA2130026). Work shall be completed by a contractor licensed in the state of Georgia.

2. Objectives and Scope of Work

The overall objective of the project is to develop a potable water well that will be used for the future construction of a replacement water system serving the Lake Conasauga Campground.

The requirements for the project can be found in the attached project specifications. The work shall include, but is not limited to:

Mobilization and demobilization Well drilling and development Yield and sample testing Installation of casing, grouting, and sanitary seal Installation of wellhead protection measures Site Restoration

As indicated on the schedule of items, an optional second well shall be drilled if the yield and/or contaminants do not meet the performance requirements as detailed in the specifications.

3. Project Timeline

All work must be coordinated and performed with the presence of Contracting Officer’s Representative (COR). Work shall be performed during normal work hours (Monday-Friday 0800-1600) excluding federal holidays.

File details come from the government source that posted it. Updated .