About this file
This is a Statement of Work (SOW) for the US Department of Agriculture (USDA) Wayne National Forest for the repair of three septic lift stations at the Leith Run Campground in New Matamoras, Ohio. The project involves replacing control panels, float switch systems, and installing two new Power-Flo PFSE774 sewage pumps provided by the Wayne National Forest. The work is necessitated by flood damage to the lift stations during multiple Ohio River flooding events in spring 2024.
The contract requires the contractor to furnish all personnel, labor, equipment, materials, and services to fully restore three lift stations: the Main Lift Station, Dump Station, and Shower House Lift Station. Specific tasks include replacing control panels and float switch systems, and removing and installing new pumps. The performance period is 30 days after award, and the work will take place at the Leith Run Campground located at 44400 OH-7, New Matamoras, OH. The contractor must provide weekly status reports, submit a project plan within five business days of contract award, and comply with all safety and operational requirements specified in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12444125Q0070 Leith Run Campground Septic Lift System Repair Questions.docx | DOCX document | |
| Main Lift Station Pump Data Sheet.pdf | ||
| 12444125Q0070 Leith Run Campground Septic Lift System Repair Questions.docx | DOCX document | |
| RFQ 12444125Q0070.pdf | ||
| Attachment 1 - SOI.xlsx | XLSX spreadsheet | |
| Attachment 3 - WD 2015-4765 R30.pdf | ||
| Attachment 4 - Experience Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of
Contents Project Title
1.0 Purpose
2.0 Scope or Mission
3.0 Period and Place of Performance
4.0 Background
5.0 Performance Objectives
6.0 Deliverables / Schedule
7.0 Operating Constraints
8.0 Attachments
Project Title Repair of Leith Run Campground Septic Lift Stations
1.0 Purpose
Repair of three septic lift stations at the Leith Run Campground by the replacement of control panels, floats and the installation of two pumps provided by the Wayne National Forest.
2.0 Scope or Mission
This contract is for maintenance services on the Wayne National Forest, Athens District, New Matamoras, Ohio.
The Contractor shall furnish all personnel, labor, equipment, material, tools, supplies, supervision, management, and services, except as may be expressly set forth as Government furnished and otherwise do all things necessary to perform and provide the work efforts described in this statement of work.
The Contractor shall determine how much labor is needed to perform the task, what methods will be used to complete the job, and which supplies, materials and requirements are needed. The results of the work performed under this contract will conform to the Project Specifications Requirements and the Government expects that upon daily or periodic inspections that these performance standards will be met or exceeded.
3.0 Period and Place of Performance
The services to be performed under this contract are on the Leith Run Campground, Wayne National Forest Office, Athens District, New Matamoras, Ohio. It is located at 44400 OH -7, New Matamoras, OH 45767. The performance period is
4.0 Background
The service work required in this contract is the result of the natural degradation of existing lift station components due to the use of the systems by the public and by damage during multiple flooding events of the Ohio River in the spring of 2024. Leith Run Campground is located within the floodplain and was inundated twice within a short period of time.
The septic system has been inspected for damage resulting from the flood water. The septic pumps for the main lift station and the dump station are operational. The float switch systems are not functioning properly. The control panels have been damaged, are partially operational, and will need to be replaced. The shower house lift station will also need the control panel and floats replaced. In addition, the two existing pumps are not functioning and will need to be replaced with new pumps that will be supplied by the Wayne National Forest.
5.0 Performance Objectives
A. Main Lift Station (Station #1) Fully Operational
a. Replace the control panel
b. Replace the float switch system
B. Dump Station (Station #4) Fully Operational
a. Replace the control panel
b. Replace the float switch system
C. Shower House Lift Station (Station #2) Fully Operational
a. Replace the control panel
b. Replace the float switch system
c. Remove two existing pumps and install new pumps supplied by the Wayne National Forest
6.0 Deliverables / Schedule
Key Deliverables
Item No. Deliverable Objective Due
1 Proposed Project Plan Defining the responsibilities, timeline, risks and milestones of contract objectives. Ref. Subtask 4.1.3
No later than five (5) business days after contract award
2 Weekly Status Report Report documenting tasks & issues weekly. Ref Task 5.1
Weekly, every Friday, by 3:00 PM EDST until the contract expires
7.0 Operating Constraints
Government-Furnished Property
A. The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.
a. Water and electricity to fulfil the contract requirements.
b. Keys to the campground gate and buildings. The keys will be given to the Contractor Representative and shall be given back to the Government when the contract ends. If the keys are not returned at the end of the service or are lost, the contractor will pay to have locks changed and (20) numbered keys made.
c. Two Power-Flo PFSE774 Sewage Pumps for installation
Contractor Furnished Critical Items (Supplies, Materials, Equipment, Etc.) and Services A. The Contractor shall provide necessary labor, materials, tools, supplies, equipment, transportation, employee training and sufficient workforce to comply with the requirements of this contract. These materials, supplies and equipment shall reduce the environmental impact when compared to other products used for the same purpose.
a. All supplies and materials shall be of a quality and type customarily utilized by other Contractors engaged in the profession of providing construction services and that conforms to applicable Federal specifications and standards, and to the extent feasible and reasonable.
b. The Contractor must submit to the Contracting Officer a list indicating the name of the manufacturer, the brand name, and the intended use of each of the materials, proposed for use in the performance of its work. The listing shall be updated and kept current.
B. The Contractor shall submit a copy of all Material Safety Data Sheets (MSDS) Sheets on the products they are using within 10 calendar days from contract award for all products used in the performance of this contract. The MSDS sheets shall be retained at the work site and updated as often as necessary to keep them current.
C. Equipment
a. All construction equipment needed for the performance of the work of this contract shall be furnished by the Contractor. All equipment must be in safe and effective working condition. All equipment shall be properly guarded and meet all applicable OSHA standards.
b. All equipment shall be of the size, type, and condition customarily used in this work, shall conform to all applicable safety codes, and shall meet the approval of the Contracting Officer.
c. The Contractor is responsible for maintaining all equipment in good working order, in accordance with manufacturer recommendations.
d. The Contractor shall provide protective gloves, safety glasses, and any other safety equipment needed to execute the contract.
D. The Contractor shall also have at all times of contract performance, a properly designated representative that understands and speaks fluent English.
E. The Contractor shall provide all submittals listed in this section.
F. The Contractor shall place hazard cones and signs when working in around the facility.
G. The Contractor must comply with the applicable Occupational Safety and Health Administration (OSHA)
Standards specified under 29 CFR Part 1910 and other Federal, State, and local regulations for the purpose of providing safety precautions to all employees who are subject to occupational exposure to materials because of the construction performed under this contract.
a. The Contractor is responsible for providing the necessary training and education to his employees affected by the OSHA standards and ensuring safe and sanitary work conditions for his employees. The Contractor is also responsible for providing, at no cost to his employees, appropriate personal protective equipment such as, but not limited to, gloves, masks, and eye protections (reference section 1910.1030, Bloodborne Pathogens).
b. Personal Protective Equipment is specialized clothing or equipment worn by an employee for protection against a hazard. General work clothes (e.g., uniforms, pants, shirts, or blouses) not intended to function as protection against a hazard are not considered to be personal protective equipment.
H. Costs for correcting damage caused by the Contractor will be borne by the Contractor. The Contractor shall be responsible for all damage to property and to persons, including third parties that occur because of his or her agent’s or employee’s fault or negligence. The term “third party” is constructed to include employees of the Government.
Contractor Supervision and Listing of Employees A. The Contractor shall have adequate supervision during contract performance to ensure that all construction line items are performed.
B. The on-site supervisors and/or alternatives shall be always available when the contract work is in progress. No
Government employees are authorized to exercise either direct or indirect supervision over the Contractor’s employees.
C. The Contractor shall provide in writing to the Contracting Officer at least ten workdays after contract award, and updated as employees change, the name(s) and telephone number(s) of on-site supervisors. This information is for the Government’s use in contacting a supervisor should the need occur when a supervisor is not on-site.
Qualifications of Supervisory Employees A. The Contractor shall only assign fully trained personnel capable of accomplishing all the requirements in this contract. The Contractor shall employ experience, competent supervisory personnel capable of providing ongoing training to employees’ accomplishing the work and quality requirements under this contract. The on-site supervisor shall understand and speaks fluent English and able to communicate effectively with their staff and Contracting Officer.
Qualifications of Other Contractor Personnel The Contractor shall only assign fully trained personnel capable of accomplishing all the requirements in this contract.
Personnel Training All Contractor employees are required to attend an orientation conducted by the C.O.R. The orientation will include an explanation of the occupant agency’s function and a tour of the building/facility/jobsite. It will also familiarize Contractor employees with key client agency personnel and areas of the building/facility requiring special attention.
The C.O.R will notify the Contractor if any system has been revised, and if applicable, will request another meeting.
Contractor Required Submittals
DOCUMENT PERIODICITY
Schedule of Work Plan
Written List of Personnel Working on Contract
Ten Days after Contract is awarded and each time a new employee starts.
Written Notice of Designated Representative
At post award meeting and revised when necessary.
List of all products used on the Contract
With Quote and Two weeks after Contract is awarded and each time a new product is used. Also in accordance with FAR 52.223-
Material Safety Data Sheets (MSDS) Two weeks after Contract is awarded and each time a new product is used.
Two Copies of the Performance Plan (Operation & Quality Control Plan)
Ten days after award.
Contractor’s Emergency Plan With-in 10 days of award.
Safety Plan With Quote.
Report of hazardous conditions As required.
Evidence of Insurance Within 10 days of award and updated as needed.
8.0 Attachments
Wastewater System Drawings Photos of provided pumps and existing control panels
LEGEND
EXISTING 4" SEWER LINE
NEW 4" SEWER LINE
S
WATER TOWER
DUMP STATION
POTABLE WATER TOWER
S
S
S
21 UNIT CAMPGROUND
TOILET/
SHELTER
PLAY AREA
VAULT TOILET
S
S
S
S
S
SS
S S
SS
S
S S
HOST SITE
WELL FEE/STORE BUILDING
FLUSH TOILET
LEITH RUN
EMBAYMENT
BOAT
RAMP
LIFT STATION #2
2-1500 GAL.
SEPTIC
TANKS
2-1500 GAL. SEPTIC TANKS
LIFT STATION #5
LIFT STATION #1
8" X 26' CULVERT
21" X 15"X 58' CULVERT
21" X 15"X 40'
CULVERT
SHOWER
S
S
S
S
S
PLAYGROUND
VOLLEYBALL
COURT
EQUIPMENT
( IN FEET )
GRAPHIC SCALE
080 80 160 32040
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
12 18
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
Leith_Run_plan_7-6-10.dwg
WATER TOWER
DUMP STATION
POTABLE WATER TOWER
S
S
S
S
S
S
TOILET/
SHELTER
VAULT TOILET
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
SS
S
S S
S S
S S
WELL
FEE/STORE BUILDING FLUSH TOILET
LIFT STATION #2
2-1500 GAL.
SEPTIC
TANKS
2-1500 GAL. SEPTIC TANKS
LIFT STATION #5
LIFT STATION #1
SHOWER
NOTE:
(1) ALL SEWAGE ACCESS LIDS WILL HAVE CONCRETE RINGS
ADDED TO RAISE ALL LIDS 1.0 FEET RINGS WILL BE SEALED TO
PREVENT INFILTRATION OF SURFACE AND GROUND WATER.
AREA WILL BE FILLED AND GRADED SO AS TO HAVE POSITIVE
SURFACE WATER DRAINAGE.
NOTE:
(1) ALL SEWAGE ACCESS LIDS WILL HAVE CONCRETE RINGS
ADDED TO RAISE ALL LIDS 2.5 FEET RINGS WILL BE SEALED TO
PREVENT INFILTRATION OF SURFACE AND GROUND WATER.
AREA WILL BE FILLED AND GRADED SO AS TO HAVE POSITIVE
SURFACE WATER DRAINAGE.
NOTE:
(1) ALL SEWAGE ACCESS LIDS WILL HAVE CONCRETE RINGS
ADDED TO RAISE ALL LIDS 2.5 FEET RINGS WILL BE SEALED TO
PREVENT INFILTRATION OF SURFACE AND GROUND WATER.
AREA WILL BE FILLED AND GRADED SO AS TO HAVE POSITIVE
SURFACE WATER DRAINAGE.
(2) CONTROL PANEL WILL BE RAISED 4.O FEET.
(3) INSTALL 4 INCH WOLVERINE WLV-4 OR EQUAL (SEE DETAIL)
N E
W C
O N
S T
R U
C T
IO
N
6' -0
CARBON ORDER & VENT FILTER.
WOLVERINE WLV-4 OR EQUAL
SCH 40 PVC PIPE
3' DIA. X 8" CONCRETE
EXISTING 4" VENT
FROM LIFT STATION
NOTE:
(1) ALL SEWAGE ACCESS LIDS WILL HAVE CONCRETE RINGS
ADDED TO RAISE ALL LIDS 3.0 FEET RINGS WILL BE SEALED TO
PREVENT INFILTRATION OF SURFACE AND GROUND WATER.
AREA WILL BE FILLED AND GRADED SO AS TO HAVE POSITIVE
SURFACE WATER DRAINAGE.
LEGEND
EXISTING 4" SEWER LINE
NEW 4" SEWER LINE
S
S
( IN FEET )
GRAPHIC SCALE
080 80 160 32040
Drawing Title
Scale
Date
CAD File No.
Drawn
Drawing No.
Project
Date
Project Name
No.
Revision/Issue
Sheet of
DWS
13 18
Design:
TCWChecked:
TCW
PLOT ARCH SIZE "D"
Leith_Run_plan_7-6-10.dwg
New Pumps Info
Main Lift Station
Dump Station
Shower House Station
File details come from the government source that posted it. Updated .