This document is a Statement of Work (SOW) for a 5-year water parameter surveillance contract at the National Institutes of Health (NIH) Clinical Research Center (CRC) in Bethesda, Maryland. The Contractor shall perform quarterly water sampling and testing at all sinks, showers, and bathtubs in the 242-bed CRC facility. Scope includes testing for free chlorine, temperature, and other water quality parameters at points-of-use as well as at various water processing equipment locations. The Contractor shall also update the CRC Water Safety Plan annually and provide monthly progress reporting. An optional 60-day chlorination task is included. The contract opportunity has an Solicitation Number of M30937030 and is being issued by the Department of Health and Human Services, National Institutes of Health.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PROJECT TITLE: M30937030 – Building 10 CRC, 5-Year Water Parameter Surveillance

A. OVERVIEW

1. PURPOSE

The Contractor shall perform all professional services stated herein and defined in Section B, Scope of Work, complying with all current industry standards and codes.

2. PRICING

Pricing shall clearly include labor and supply costs of completing the work described in this scope of work. This task will be performed in Building 10, the Clinical Research Center (CRC) at the National Institutes of Health (NIH) located in Bethesda, Maryland.

3. PROJECT CONTACT PERSONS

a. CONTRACTING OFFICER (overall authority in all matters for this project):

Anazette Andrews National Institutes of Health Office of Acquisition 13 South Drive Building 13, Room 2E48 9000 Rockville Pike, Bethesda, MD 20892-5759 Telephone: 301-443-3111 Email Address: anazette.andrews@nih.gov

b. PROJECT OFFICER (project management and the Contractor Officer’s Representative (COR) for this project):

Halie Aroz National Institutes of Health

ORF/DFOM/ASB

13 South Drive Building 13, Room 1E81 9000 Rockville Pike, Bethesda, MD 20892-5759 Telephone: 240-220-4261 Email Address: halie.aroz@nih.gov

c. In this scope of work, the Government point of contact will be the Project Officer and the General Contractor point of contact will be the Project Manager (PM). All correspondence shall only be issued either through the PO or the PM.

B. SCOPE OF WORK

1. GENERAL

A. All work is to be performed in the Clinical Research Center (CRC) at the National Institutes of Health (NIH) located in Bethesda, Maryland. The CRC is a 242-bed hospital, having four mailto:anazette.andrews@nih.gov mailto:halie.aroz@nih.gov wings with eight stories. The water is not softened, and there is no on-site water storage.

Water is consumed entirely within the CRC and does not feed any other buildings. The potable water and the domestic hot water is used throughout the CRC, which will remain in operation for the duration of this contract.

B. Personnel performing the water sampling shall possess a current Water Sampler Certification issued by the Maryland Department of the Environment. All employees of the Contractor shall be dressed in a manner that clearly identifies them as an employee of the Contractor.

C. Free-chlorine analysis shall be performed using a DPD-based digital colorimeter, Hach DR900 or equal.

D. Scope is outlined for the Base Year of the contract. This scope will also apply to 4 Option Years.

2. WATER PARAMETER SURVEILLANCE

2.1. SAMPLING AT POINTS-OF-USE

A. Four times per year, over a period of twelve months (total of four reads per outlet), the Contractor will test for free-chlorine and temperature in the domestic cold and domestic hot water supply at all sinks in identified rooms in the CRC. Separate tests shall be performed for the cold water and the hot water at each fixture equipped with cold and hot controls. A single test shall be performed at automated, sensor-controlled faucets that provide a single, mixed water supply. Sample the water at:

• Combination bathtub/shower – 12 ea

• Showers – 119 ea

• Sinks – 528 ea

B. Sample free-chlorine after allowing full water flow for 15-seconds. The water shall be allowed to continue flowing and the temperature shall be monitored until it stabilizes, up to two minutes. Report the final temperature, or the temperature after two minutes of flow, whichever comes first, and the time-to-temperature.

C. Document for each sample location the:

• Room number

• Fixture type (e.g., sink, shower)

• Test date and time

• Free-chlorine

• Final or two-minute temperature, as applicable, for the cold water and the hot water

• Time-to-temperature for the cold water and the hot water

• Any deficiencies noted and corrective actions taken.

D. For outlets equipped with a local thermal mixing valve, if the domestic hot water temperature does not meet the specified setpoint, adjust the thermal mixing valve to the desired setpoint.

E. For obvious water flow deficiencies, remove and clean the strainer screen in the thermal mixing valve, or take other minor maintenance steps to improve the water flow.

F. Annually, remove and clean all shower heads and handheld shower wands. Inspect shower head and mixing valve operation and replace gaskets as necessary.

G. Test the hot water maximum supply temperature at the showers and shower/bathtub combination fixtures. Adjust the high-limit on the shower mixing valve if the water temperature exceeds 112F.

H. While sampling and testing water, inspect the plumbing fixtures and equipment for obvious deficiencies and report same to the Project Officer.

2.1.1. SAMPLING SCHEDULING REQUIREMENTS

A. The Contractor shall coordinate all sampling with the ORF Facility Manager. In addition, the Contractor shall follow the standard operating procedure for entry to each of the patient- care sectors provided by the PO. The procedures will provide specific steps to be taken to coordinate with the Charge Nurse prior to entering rooms to take samples.

The Charge Nurse will need to approve all access to rooms and may require the Contractor to return later and may require gowning or other infection control measures.

B. If rooms are occupied or otherwise not available, the Contractor shall return when access to the room is allowed to draw water samples.

C. The Contractor shall provide a proposed testing schedule for PO review and approval.

Deviations from the proposed schedule will require approval by the PO.

2.2. SAMPLING OF INCOMING WATER AND WATER PROCESSING STAGES

A. Weekly Testing: The following incoming water and water processing samples or reads shall be taken weekly, seven days apart.

A.1. The Contractor shall take water samples to be analyzed for effluent particle size from the incoming water supply pre- and post- the incoming water filter in room B2-2640. Analysis shall be performed at a water quality laboratory certified by the Maryland Department of the Environment.

A.2. The Contractor shall measure the free-chlorine in the water at the water supply point-of-entry in room B2-2640, and at the domestic hot water return pumps for the north bar and the south bar in room B2-2461 (two total domestic hot water points).

B. Quarterly Testing: Measure the water temperatures and pressures at the water incoming and processing points listed below quarterly, three months apart.

• Incoming potable water temperature

• Incoming potable water pressure

• Water filter discharge water pressure

• Water pressure booster pump discharge water pressure

• Domestic hot water heater master supply water temperature

• Thermal mixing valve -1 supply water temperature

• Thermal mixing valve -2 supply water temperature

• Thermal mixing valve -3 supply water temperature

• Thermal mixing valve -4 supply water temperature

• Domestic hot water return-1 temperature

• Domestic hot water return-2 temperature

2.3. POTABLE WATER FLUSHING

A. Dialysis Port Flushing: Quarterly, at 54 rooms, flush the dialysis water hose connection until the water runs clear.

B. Interstitial Sector Potable Dump Line Flushing: Weekly, flush the potable water for 15-minutes at each of the interstitial sector potable dump lines at the sectors listed below:

• Second floor northwest: 2-1721

• Fourth floor northeast: 4-1361

• Fourth floor southwest: 4-4712

• Six floor northwest: 6-2608

• Six floor southeast: 6-4372

• Eight floor southwest: 8-4712

2.4. DATA ANALYSIS AND REPORTING REQUIREMENTS

A. The Contractor shall provide a weekly data report to the PO of all data collected to date in xlsx spreadsheet format. Provide a graphical presentation of each data set to allow the reader to evaluate the performance of the processing equipment and distribution systems. The report shall include the following data:

• Building automation system data: Provide graphical reports that illustrate the 10-minute sample data provided by the Building Automation System.

• Point-of-use data: Provide a report that allows the reader to understand the performance of the water delivery at points-of-use. Provide a report that shows:

a. A summary of the facility

b. A summary for each floor and sector within the facility, and

c. Details for each patient care room

• Plant data: Provide graphical reports that illustrate the data collected for the free-chlorine levels and the water particle counts.

• Histograms: Provide histograms that summarize the performance of the potable and domestic hot water systems in bands to allow the reader to quickly identify whether the systems are operating within the desired parameters.

B. The Contractor shall provide an individual qualified to discuss in detail the data sampled above to attend the monthly meetings of the Office of Research Facilities Clinical Center Water Management Team and the Clinical Center Water Management Team (total of two meetings per month) to present and explain the results of the Surveillance Program.

C. Contractor shall be open to data entry in IWMS.

3. WATER SAFETY PLAN UPDATE

A. Once per year, review and update the existing NIH Clinical Research Center Water Safety Plan, including the Hazard Analysis, to reflect changes in the guidance documents, the facility infrastructure, water usage and applications. The update shall include on-site meetings with the stakeholders prior to the review and update, meetings as required during the drafting of the review and update, and meetings to present the final document to the Office of Research Facilities Water Management Team, and to the Clinical Center Water Management Team.

4. OPTION 1: CHLORINATION

Optional, to be issued as a separate task order when requested.

4.1. CHLORINATION

A. For a period of 60-days, chlorinate the domestic hot water system in the CRC. The Contractor is to maintain a free- chlorine level downstream from the point of injection as required to maintain the domestic hot water return free-chlorine level at 1 to 1.5 parts per million (ppm), but not to exceed 4.0 ppm.

B. The domestic hot water system has two hot water heaters that heat the incoming and a portion of the recirculating water to 145O F. The 145O F water is then blended with domestic cold water through a set of four thermal mixing valves to supply tempered domestic hot water to the CRC. A portion of the domestic hot water is recirculated from distal points throughout the building back to the hot water heaters and the thermal mixing valves.

C. The potable water source is the Washington Suburban Sanitary Commission (WSSC) via the NIH water distribution network. The primary disinfectant used by the WSSC is chlorine.

D. Typical operating conditions at the domestic hot water supply are:

• Water heater outlet temperature: 145 O F

• Water thermal mixing valve outlet temperature: 135 O F

• Water supply pressure: 80 psig

E. Typical incoming potable water supply chemistry parameters are:

1. Average free chlorine = 1.3 ppm

2. Free chlorine range = 0.5 to 2.0 ppm

3. pH range = 7.2 to 7.6

4. Conductivity = 410

5. Total Hardness (as CaCO3) = 100 ppm

6. Calcium (as CaCO3) = 80 ppm

7. Total Alkalinity (as CaCO3) = 140 ppm

8. Iron (Fe) = 0.10 ppm

F. All work shall comply with Maryland Department of the Environment and Washington Suburban Sanitary Commission requirements for new or modified potable water piping systems. Comply with NSF 61, Drinking Water System Components - Health Effects;

Sections 1 through 9, for all components that will be in contact with potable water.

G. Equipment shall be installed in room B2-2641 in the CRC. The room is temperature controlled and ventilated. Available electrical power is 110 Volts AC, 20 amps, 60 hertz, single phase.

H. Monitor the free-chlorine level and inject chlorine in the domestic hot water return at a point in the blended return water header downstream from the domestic hot water recirculation pumps in room B2- 2641.

I. The Contractor shall provide all chlorine and chlorine feed equipment, to include:

• A double-wall storage tank with a catchment basis sized for the total capacity of the storage tank. If chlorine drums are used, the drums must be placed in a catch basin or containment.

• A supply of NSF/ANSI Standard 60 certified chlorine

• NSF 61 approved equipment including a metering pump(s)

• Chlorine sensor for continuous monitoring and control of the water chlorine level

• Chlorine analyzer and feed controller with remote alarm notification if the free-chlorine level exceeds 4.0 ppm. Free-chlorine residual is to be monitored via a technology with continuous data trending including alarms and notifications.

• All required pipe, fittings, valves, or other components required to install taps to the existing potable water supply piping.

J. The Contractor shall provide all required personal protective equipment (PPE) to their staff for this work under this contract (e.g., footwear, eye, face, hands and respiratory)

K. The Contractor shall post all warning signs and notifications required by this work. The Contractor shall provide training to the NIH maintenance staff in the form of slides or similar about any risks inherent in this chlorination program.

4.2. TESTING AND VERIFICATION

A. For the first seven days of operation, the Contractor shall sample the water at a suitable location downstream of the injection port to ensure complete mixing with the domestic hot water supply. Compare the test result with the reading of the chlorine metering controller and ensure that they match within 10%.

B. For the remainder of the contract period, the Contractor shall test and verify the performance of the free-chlorine sensor at a minimum weekly. More frequent testing will be required if the sensor is not holding calibration within 10%.

C. The Contractor shall perform the following tests at two random fixtures in the CRC weekly for the duration of this contract:

• Microbiological testing for Total Coliform, E. coli, and Heterotrophic Plate Count

• First-draw for lead and copper

• Total chlorine

• Free chlorine

• Total trihalomethanes

D. Tests for metals and microbials shall be performed at a water quality laboratory certified by the Maryland Department of the Environment.

E. All sample locations will be selected by the Project Officer.

F. Provide a report to the Project Officer summarizing the test results as soon as each set of weekly test results are available.

G. Maximum turn-around time for laboratory reports shall be 10 business days.

Table 1: Surveillance Program Rooms

Room Room Name Fixture Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

1-1600 Corr Lav1 100 110

1-1600 Corr Lav2 100 110

1-1600 Corr Lav3 100 110

1-1616 Ptnt Lav 100 120

1-1620 Ptnt BR Lav 100 120

1-1620 Ptnt BR Shwr 112 112

1-1622 Ptnt BR Bath 100 120

1-1622 Ptnt BR Lav 100 120

1-1624 Ptnt Lav 100 120

1-1628 Ptnt Lav 100 120

1-1632 Ptnt BR Bath 100 120

1-1632 Ptnt BR Lav 100 120

1-1634 Ptnt BR Lav 100 120

1-1634 Ptnt BR Shwr 112 112

1-1636 Ptnt Lav 100 120

1-1640 Ptnt Vest Lav 100 120

1-1644 Ptnt BR Lav 100 120

1-1644 Ptnt BR Shwr 112 112

1-1646 Ptnt BR Lav 100 120

1-1646 Ptnt BR Shwr 112 112

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

1-1648 Ptnt Lav 100 120

1-1652 Ptnt Lav 100 120

1-1652 Ptnt Room Lav 100 120

1-1656 Ptnt BR Bath 100 120

1-1656 Ptnt BR Lav 100 120

1-1658 Ptnt BR Bath 100 120

1-1658 Ptnt BR Lav 100 120

1-1660 Ptnt Vest Lav 100 120

1-1664 Ptnt Lav 100 120

1-1666 Ptnt BR Lav 100 120

1-1666 Ptnt BR Shwr 112 112

1-1668 Ptnt BR Bath 100 120

1-1668 Ptnt BR Lav 100 120

1-1672 Ptnt Lav 100 120

1-1672 Ptnt Shwr

1-1672 Ptnt Sink

1-1676 Ptnt Lav 100 120

1-1680 Ptnt BR Bath 100 120

1-1680 Ptnt BR Lav 100 120

1-1682 Ptnt BR Lav 100 120

1-1682 Ptnt BR Shwr 112 112

1-1684 Ptnt Lav 100 120

1-2600 Corr Lav1 100 110

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

1-2600 Corr Lav2 100 110

1-2600 Corr Lav3 100 110

1-2600 Corr Lav4 100 110

1-2616 Ptnt Sink 100 120

1-2622 Ptnt BR Lav 100 120

1-2624 Ptnt Sink 100 120

1-2628 Ptnt Lav 100 120

1-2632 Ptnt BR Lav 100 120

1-2636 Ptnt Lav 100 120

1-2637 Hydro Bath 100 120

1-2637 Hydro Lav 100 120

1-2640 Ptnt Lav 100 120

1-2644 Ptnt BR Lav 100 120

1-2644 Ptnt BR Shwr 112 112

1-2646 Ptnt BR Lav 100 120

1-2646 Ptnt BR Shwr 112 112

1-2648 Ptnt Lav 100 120

1-2652 Ptnt Lav 100 120

1-2656 Ptnt BR Lav 100 120

1-2656 Ptnt BR Shwr 112 112

1-2658 Ptnt BR Lav 100 120

1-2658 Ptnt BR Shwr 112 112

1-2660 Ptnt Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

1-2664 Ptnt Lav 100 120

1-2668 Ptnt BR Lav 100 120

1-2668 Ptnt BR Shwr 112 112

1-2670 Ptnt BR Bath 100 120

1-2670 Ptnt BR Lav 100 120

1-2672 Ptnt Lav 100 120

1-2676 Ptnt Lav 100 120

1-2680 Ptnt BR Bath 100 120

1-2680 Ptnt BR Lav 100 120

1-2682 Ptnt BR Lav 100 120

1-2682 Ptnt BR Shwr 112 112

1-2684 Ptnt Lav 100 120

1-1433 Tmnt Lav 100 120

1-1435 Tmnt Lav 100 120

1-1437 Toilet Lav 100 120

1-1441 Tmnt Lav 100 120

1-1445 Tmnt Lav 100 120

1-1453 Tmnt Lav 100 120

1-1461 Tmnt Lav 100 120

1-2405 Meta Sink 100 120

1-2421 Therapist Sink 100 120

1-2433 Tmnt Lav 100 120

1-2435 Tmnt Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

1-2437 Tmnt Lav 100 120

1-2439 Cast Sink 100 120

1-2453 Tmnt Lav 100 120

1-2457 Tmnt Lav 100 120

1-2460 Gym Lav 100 110

1-2461 Tmnt Lav 100 120

1-2472 Toilet Lav 100 120

1-3644 Kitchen Sink 100 120

1-3651 Meds Sink 100 120

1-3665 Exam Lav 100 120

1-5673 Play Sink L 100 110

1-5673 Play Sink R 100 110

1-5675 Toilet Lav 100 120

1-3432 Kitchen Sink 100 120

1-3453 Exam Lav 100 120

1-5403 Waiting Lav 100 110

1-5416 Social Lav 100 110

1-5420 Toilet Lav 100 120

1-5420 Toilet Shwr 112 112

1-5424 Soiled Lav 100 120

1 Open Bay Pharm

1-4420A Locker Sink L

1-4420A Locker Sink R

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

1-4428A Toilet Lav

1-4428B Toilet Lav

3-1600 Corr Lav1 100 110

3-1600 Corr Lav2 100 110

3-1600 Corr Lav3 100 110

3-1616 Ptnt Lav 100 120

3-1620 Ptnt BR Lav 100 120

3-1620 Ptnt BR Shwr 112 112

3-1622 Ptnt BR Lav 100 120

3-1622 Ptnt BR Shwr 112 112

3-1624 Ptnt Lav 100 120

3-1628 Ptnt Lav 100 120

3-1632 Ptnt BR Lav 100 120

3-1632 Ptnt BR Shwr 112 112

3-1634 Ptnt BR Lav 100 120

3-1634 Ptnt BR Shwr 112 112

3-1636 Ptnt Lav 100 120

3-1637 Exam Sink

3-1640 Ptnt Lav 100 120

3-1644 Ptnt BR Lav 100 120

3-1644 Ptnt BR Shwr 112 112

3-1646 Ptnt BR Lav 100 120

3-1646 Ptnt BR Shwr 112 112

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-1648 Ptnt Lav 100 120

3-1652 Ptnt Lav 100 120

3-1656 Ptnt BR Lav 100 120

3-1656 Ptnt BR Shwr 112 112

3-1658 Ptnt BR Lav 100 120

3-1658 Ptnt BR Shwr 112 112

3-1660 Ptnt Vest Lav 100 120

3-1664 Ptnt Lav 100 120

3-1668 Ptnt BR Lav 100 120

3-1668 Ptnt BR Shwr 112 112

3-1670 Ptnt BR Lav 100 120

3-1670 Ptnt BR Shwr 112 112

3-1672 Ptnt BR Lav 100 120

3-1676 Ptnt Lav 100 120

3-1680 Ptnt BR Lav 100 120

3-1680 Ptnt BR Shwr 112 112

3-1682 Ptnt BR Lav 100 120

3-1682 Ptnt BR Shwr 112 112

3-1684 Ptnt Lav 100 120

3-2600 Corr Lav1 100 110

3-2600 Corr Lav2 100 110

3-2600 Corr Lav3 100 110

3-2616 Ptnt Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-2620 Ptnt BR Lav 100 120

3-2620 Ptnt BR Shwr 112 112

3-2622 Ptnt BR Lav 100 120

3-2622 Ptnt BR Shwr 112 112

3-2624 Ptnt Lav 100 120

3-2628 Ptnt Lav 100 120

3-2632 Ptnt BR Lav 100 120

3-2632 Ptnt BR Shwr 112 112

3-2634 Ptnt BR Lav 100 120

3-2634 Ptnt BR Shwr 112 112

3-2636 Ptnt Lav 100 120

3-2637 Hydro Bath 100 120

3-2637 Hydro Lav 100 120

3-2640 Ptnt Lav 100 120

3-2644 Ptnt BR Lav 100 120

3-2644 Ptnt BR Shwr 112 112

3-2646 Ptnt BR Lav 100 120

3-2646 Ptnt BR Shwr 112 112

3-2648 Ptnt Lav 100 120

3-2652 Ptnt Lav 100 120

3-2656 Ptnt BR Lav 100 120

3-2656 Ptnt BR Shwr 112 112

3-2658 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-2658 Ptnt BR Shwr 112 112

3-2660 Ptnt Lav 100 120

3-2660 Ptnt Room Lav 100 120

3-2664 Ptnt Lav 100 120

3-2668 Ptnt BR Lav 100 120

3-2668 Ptnt BR Shwr 112 112

3-2670 Ptnt BR Lav 100 120

3-2670 Ptnt BR Shwr 112 112

3-2672 Ptnt Lav 100 120

3-2676 Ptnt Lav 100 120

3-2680 Ptnt BR Lav 100 120

3-2680 Ptnt BR Shwr 112 112

3-2682 Ptnt BR Lav 100 120

3-2682 Ptnt BR Shwr 112 112

3-2684 Ptnt Lav 100 120

3-1400 Corr Lav1 100 110

3-1400 Corr Lav2 100 110

3-1400 Corr Lav3 100 110

3-1404 Ptnt Vest Lav 100 120

3-1408 Ptnt BR Lav 100 120

3-1408 Ptnt BR Shwr 112 112

3-1410 Ptnt BR Lav 100 120

3-1410 Ptnt BR Shwr 112 112

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-1412 Ptnt Lav 100 120

3-1416 Ptnt Lav 100 120

3-1420 Ptnt BR Lav 100 120

3-1420 Ptnt BR Shwr 112 112

3-1422 Ptnt BR Lav 100 120

3-1422 Ptnt BR Shwr 112 112

3-1424 Ptnt Lav 100 120

3-1428 Ptnt Lav 100 120

3-1432 Ptnt BR Lav 100 120

3-1432 Ptnt BR Shwr 112 112

3-1434 Ptnt BR Lav 100 120

3-1434 Ptnt BR Shwr 112 112

3-1436 Ptnt Lav 100 120

3-1440 Ptnt Lav 100 120

3-1440 Ptnt Room Lav 100 120

3-1444 Ptnt BR Lav 100 120

3-1444 Ptnt BR Shwr 112 112

3-1446 Ptnt BR Lav 100 120

3-1446 Ptnt BR Shwr 112 112

3-1448 Ptnt Lav 100 120

3-1452 Ptnt Lav 100 120

3-1456 Ptnt BR Lav 100 120

3-1456 Ptnt BR Shwr 112 112

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-1458 Ptnt BR Lav 100 120

3-1458 Ptnt BR Shwr 112 112

3-1460 Ptnt Lav 100 120

3-1464 Ptnt Lav 100 120

3-1468 Ptnt BR Lav 100 120

3-1468 Ptnt BR Shwr 112 112

3-1470 Ptnt BR Lav 100 120

3-1470 Ptnt BR Shwr 112 112

3-1472 Ptnt Lav 100 120

3-2400 Corr Lav1 100 110

3-2400 Corr Lav2 100 110

3-2400 Corr Lav3 100 110

3-2404 Ptnt Lav 100 120

3-2408 Ptnt BR Lav 100 120

3-2408 Ptnt BR Shwr 112 112

3-2410 Ptnt BR Lav 100 120

3-2410 Ptnt BR Shwr 112 112

3-2412 Ptnt Lav 100 120

3-2416 Ptnt Lav 100 120

3-2420 Ptnt BR Lav 100 120

3-2420 Ptnt BR Shwr 112 112

3-2422 Ptnt BR Lav 100 120

3-2422 Ptnt BR Shwr 112 112

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-2424 Ptnt Lav 100 120

3-2428 Ptnt Lav 100 120

3-2432 Ptnt BR Lav 100 120

3-2432 Ptnt BR Shwr 112 112

3-2434 Ptnt BR Lav 100 120

3-2434 Ptnt BR Shwr 112 112

3-2436 Ptnt Lav 100 120

3-2440 Ptnt Lav 100 120

3-2444 Ptnt BR Lav 100 120

3-2444 Ptnt BR Shwr 112 112

3-2446 Ptnt BR Lav 100 120

3-2446 Ptnt BR Shwr 112 112

3-2448 Ptnt Lav 100 120

3-2452 Ptnt Lav 100 120

3-2456 Ptnt BR Lav 100 120

3-2456 Ptnt BR Shwr 112 112

3-2458 Ptnt BR Lav 100 120

3-2458 Ptnt BR Shwr 112 112

3-2460 Ptnt Lav 100 120

3-2464 Ptnt Lav 100 120

3-2468 Ptnt BR Lav 100 120

3-2468 Ptnt BR Shwr 112 112

3-2470 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-2470 Ptnt BR Shwr 112 112

3-2472 Ptnt Lav 100 120

3-3600 Corr Lav1 100 110

3-3600 Corr Lav2 100 110

3-3600 Corr Lav3 100 110

3-3600.2 Corr Lav1 100 110

3-3600.2 Corr Lav2 100 110

3-3600.2 Corr Lav3 100 110

3-3618 Ptnt Lav 100 120

3-3621 Ptnt BR Lav 100 120

3-3624 Ptnt Lav1 100 120

3-3624 Ptnt Lav2 100 120

3-3628 Ptnt Lav L 100 120

3-3628 Ptnt Lav R 100 120

3-3636 Ptnt Lav L 100 120

3-3636 Ptnt Lav R 100 120

3-3640 Ptnt Lav L 100 120

3-3640 Ptnt Lav R 100 120

3-3648 Ptnt Vest Lav 100 120

3-3650 Ptnt Lav 100 120

3-3652 Ptnt Lav L 100 120

3-3652 Ptnt Lav R 100 120

3-3660 Ptnt Lav L 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-3660 Ptnt Lav R 100 120

3-3664 Ptnt Lav L 100 120

3-3664 Ptnt Lav R 100 120

3-3672 Ptnt Lav L 100 120

3-3672 Ptnt Lav R 100 120

3-3676 Ptnt Lav L 100 120

3-3676 Ptnt Lav R 100 120

3-3682 Ptnt Vest Lav 100 120

3-3684 Ptnt Lav 100 120

3-5600 Corr Lav1 100 110

3-5600 Corr Lav2 100 110

3-5600.2 Corr Lav1 100 110

3-5600.2 Corr Lav2 100 110

3-5618 Ptnt Lav L 100 120

3-5618 Ptnt Lav R 100 120

3-5624 Ptnt Lav L 100 120

3-5624 Ptnt Lav R 100 120

3-5628 Ptnt Lav L 100 120

3-5628 Ptnt Lav R 100 120

3-5633 Clean Lav 100 120

3-5636 Ptnt Lav L 100 120

3-5636 Ptnt Room Lav L 100 120

3-5636 Ptnt Lav R 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-5636 Ptnt Room Lav R 100 120

3-5640 Ptnt Lav L 100 120

3-5640 Ptnt Lav R 100 120

3-5648 Ptnt Vest Lav 100 120

3-5650 Ptnt Lav 100 120

3-5652 Ptnt Lav L 100 120

3-5652 Ptnt Lav R 100 120

3-5660 Ptnt Lav L 100 120

3-5660 Ptnt Lav R 100 120

3-5664 Ptnt Lav L 100 120

3-5664 Ptnt Lav R 100 120

3-5672 Ptnt Lav L 100 120

3-5672 Ptnt Lav R 100 120

3-5676 Ptnt Lav L 100 120

3-5676 Ptnt Lav R 100 120

3-5682 Ptnt Lav 100 120

3-5684 Ptnt Lav 100 120

3-3400 Corr Lav1 100 110

3-3400 Corr Lav2 100 110

3-3400 Corr Lav3 100 110

3-3400 Corr Lav4 100 110

3-3412 Ptnt Lav 100 120

3-3416 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-3416 Ptnt BR Shwr 112 112

3-3418 Ptnt BR Lav 100 120

3-3418 Ptnt BR Shwr 112 112

3-3420 Ptnt Lav 100 120

3-3424 Ptnt Lav 100 120

3-3428 Ptnt BR Lav 100 120

3-3428 Ptnt BR Shwr 112 112

3-3430 Ptnt BR Lav 100 120

3-3430 Ptnt BR Shwr 112 112

3-3432 Ptnt Lav 100 120

3-3436 Ptnt Lav 100 120

3-3440 Ptnt BR Lav 100 120

3-3440 Ptnt BR Shwr 112 112

3-3442 Ptnt BR Lav 100 120

3-3442 Ptnt BR Shwr 112 112

3-3444 Ptnt Lav 100 120

3-3448 Ptnt Lav 100 120

3-3452 Ptnt BR Lav 100 120

3-3452 Ptnt BR Shwr 112 112

3-3454 Ptnt BR Lav 100 120

3-3454 Ptnt BR Shwr 112 112

3-3456 Ptnt Lav 100 120

3-3456 Ptnt Room Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-3460 Ptnt Lav 100 120

3-3466 Ptnt BR Lav 100 120

3-3468 Ptnt Lav 100 120

3-3472 Ptnt Lav 100 120

3-3478 Ptnt BR Lav 100 120

3-3480 Ptnt Lav 100 120

3-5400 Corr Lav1 100 110

3-5400 Corr Lav2 100 110

3-5400 Corr Lav3 100 110

3-5400 Corr Lav4 100 110

3-5400 Corr Lav5

3-5412 Ptnt Lav 100 120

3-5418 Ptnt Lav 100 120

3-5420 Ptnt Lav 100 120

3-5424 Ptnt Lav 100 120

3-5430 Ptnt BR Lav 100 120

3-5432 Ptnt Lav 100 120

3-5436 Ptnt Lav 100 120

3-5442 Ptnt BR Lav 100 120

3-5444 Ptnt Lav 100 120

3-5448 Ptnt Lav 100 120

3-5454 Ptnt BR Lav 100 120

3-5456 Ptnt Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

3-5460 Ptnt Lav 100 120

3-5466 Ptnt BR Lav 100 120

3-5468 Ptnt Lav 100 120

3-5472 Ptnt Lav 100 120

3-5478 Ptnt BR Lav 100 120

3-5480 Ptnt Lav 100 120

5-1600.1 Corr Lav1 100 110

5-1600.1 Corr Lav2 100 110

5-1600.1 Corr Lav3 100 110

5-1616 Ptnt Lav 100 120

5-1620 Ptnt BR Lav 100 120

5-1620 Ptnt BR Shwr 112 112

5-1622 Ptnt BR Lav 100 120

5-1622 Ptnt BR Shwr

5-1624 Ptnt Lav 100 120

5-1628 Ptnt Lav 100 120

5-1632 Ptnt BR Lav 100 120

5-1632 Ptnt BR Shwr 112 112

5-1634 Ptnt BR Lav 100 120

5-1634 Ptnt BR Shwr 112 112

5-1636 Ptnt Lav 100 120

5-1640 Ptnt Lav 100 120

5-1644 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-1644 Ptnt BR Shwr 112 112

5-1646 Ptnt BR Lav 100 120

5-1646 Ptnt BR Shwr 112 112

5-1648 Ptnt Lav 100 120

5-1652 Ptnt Lav 100 120

5-1654 Ptnt BR Lav 100 120

5-1654 Ptnt BR Shwr 112 112

5-1656 Ptnt BR Lav 100 120

5-1656 Ptnt BR Shwr 112 112

5-1660 Ptnt Vest Lav 100 120

5-1664 Ptnt Lav 100 120

5-1668 Ptnt BR Lav 100 120

5-1668 Ptnt BR Shwr 112 112

5-1670 Ptnt BR Lav 100 120

5-1670 Ptnt BR Shwr 112 112

5-1672 Ptnt Lav 100 120

5-1672 Ptnt Room Lav 100 120

5-1676 Ptnt Lav 100 120

5-1680 Ptnt BR Lav 100 120

5-1680 Ptnt BR Shwr 112 112

5-1682 Ptnt BR Lav 100 120

5-1682 Ptnt BR Shwr 112 112

5-1684 Ptnt Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-2600 Corr Lav1 100 110

5-2600 Corr Lav2 100 110

5-2600 Corr Lav3 100 110

5-2616 Ptnt Lav 100 120

5-2620 Ptnt BR Lav 100 120

5-2620 Ptnt BR Shwr 112 112

5-2622 Ptnt BR Lav 100 120

5-2622 Ptnt BR Shwr 112 112

5-2624 Ptnt Lav 100 120

5-2628 Ptnt Lav 100 120

5-2632 Ptnt BR Lav 100 120

5-2632 Ptnt BR Shwr 112 112

5-2634 Ptnt BR Lav 100 120

5-2634 Ptnt BR Shwr 112 112

5-2636 Ptnt Lav 100 120

5-2637 Hydro Bath 100 120

5-2637 Hydro Lav 100 120

5-2640 Ptnt Lav 100 120

5-2644 Ptnt BR Lav 100 120

5-2644 Ptnt BR Shwr 112 112

5-2646 Ptnt BR Lav 100 120

5-2646 Ptnt BR Shwr 112 112

5-2648 Ptnt Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-2652 Ptnt Lav 100 120

5-2656 Ptnt BR Lav 100 120

5-2656 Ptnt BR Shwr 112 112

5-2658 Ptnt BR Lav 100 120

5-2658 Ptnt BR Shwr 112 112

5-2660 Ptnt Lav 100 120

5-2664 Ptnt Lav 100 120

5-2668 Ptnt BR Lav 100 120

5-2668 Ptnt BR Shwr 112 112

5-2670 Ptnt BR Lav 100 120

5-2670 Ptnt BR Shwr 112 112

5-2672 Ptnt Lav 100 120

5-2676 Ptnt Lav 100 120

5-2680 Ptnt BR Lav 100 120

5-2680 Ptnt BR Shwr 112 112

5-2682 Ptnt BR Lav 100 120

5-2682 Ptnt BR Shwr 112 112

5-2684 Ptnt Lav 100 120

5-3600 Corr Lav1 100 110

5-3600 Corr Lav2 100 110

5-3600 Corr Lav3 100 110

5-3618 Ptnt Lav 100 120

5-3620 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-3620 Ptnt BR Shwr 112 112

5-3622 Ptnt BR Lav 100 120

5-3622 Ptnt BR Shwr 112 112

5-3624 Ptnt Lav 100 120

5-3628 Ptnt Lav 100 120

5-3628 Ptnt Room Lav 100 120

5-3632 Ptnt BR Lav 100 120

5-3632 Ptnt BR Shwr 112 112

5-3634 Ptnt BR Lav 100 120

5-3634 Ptnt BR Shwr 112 112

5-3636 Ptnt Lav 100 120

5-3640 Ptnt Lav 100 120

5-3644 Ptnt BR Lav 100 120

5-3644 Ptnt BR Shwr 112 112

5-3646 Ptnt BR Lav 100 120

5-3646 Ptnt BR Shwr 112 112

5-3648 Ptnt Lav 100 120

5-3652 Ptnt Lav 100 120

5-3656 Ptnt BR Lav 100 120

5-3656 Ptnt BR Shwr 112 112

5-3658 Ptnt BR Lav 100 120

5-3658 Ptnt BR Shwr 112 112

5-3660 Ptnt Vest Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-3664 Ptnt Lav 100 120

5-3668 Ptnt BR Lav 100 120

5-3668 Ptnt BR Shwr 112 112

5-3670 Ptnt BR Lav 100 120

5-3670 Ptnt BR Shwr 112 112

5-3672 Ptnt Lav 100 120

5-3676 Ptnt Lav 100 120

5-3680 Ptnt BR Lav 100 120

5-3680 Ptnt BR Shwr 112 112

5-3682 Ptnt BR Lav 100 120

5-3682 Ptnt BR Shwr 112 112

5-3684 Ptnt Lav 100 120

5-5600 Corr Lav1 100 110

5-5600 Corr Lav2 100 110

5-5600 Corr Lav3 100 110

5-5618 Ptnt Lav 100 120

5-5622 Ptnt BR Lav 100 120

5-5624 Ptnt Lav 100 120

5-5624 Ptnt Sink 100 120

5-5628 Ptnt Lav 100 120

5-5634 Ptnt BR Lav 100 120

5-5636 Ptnt Lav 100 120

5-5636 Ptnt Room Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-5640 Ptnt Lav 100 120

5-5646 Ptnt BR Lav 100 120

5-5648 Ptnt Lav 100 120

5-5652 Ptnt Lav 100 120

5-5658 Ptnt BR Lav 100 120

5-5660 Ptnt Lav 100 120

5-5664 Ptnt Lav 100 120

5-5668 Ptnt BR Lav 100 120

5-5668 Ptnt BR Shwr 112 112

5-5670 Ptnt BR Lav 100 120

5-5670 Ptnt BR Shwr 112 112

5-5672 Ptnt Lav 100 120

5-5676 Ptnt Lav 100 120

5-5680 Ptnt BR Lav 100 120

5-5680 Ptnt BR Shwr 112 112

5-5682 Ptnt BR Lav 100 120

5-5682 Ptnt BR Shwr 112 112

5-5684 Ptnt Lav 100 120

5-3400 Corr Lav1 100 110

5-3400 Corr Lav2 100 110

5-3400 Corr Lav3 100 110

5-3412 Ptnt Lav 100 120

5-3416 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-3416 Ptnt BR Shwr 112 112

5-3418 Ptnt BR Lav 100 120

5-3418 Ptnt BR Shwr 112 112

5-3420 Ptnt Lav 100 120

5-3424 Ptnt Lav 100 120

5-3428 Ptnt BR Lav 100 120

5-3428 Ptnt BR Shwr 112 112

5-3430 Ptnt BR Lav 100 120

5-3430 Ptnt BR Shwr 112 112

5-3432 Ptnt Lav 100 120

5-3436 Ptnt Vest Lav 100 120

5-3440 Ptnt BR Lav 100 120

5-3440 Ptnt BR Shwr 112 112

5-3442 Ptnt BR Lav 100 120

5-3442 Ptnt BR Shwr 112 112

5-3444 Ptnt Lav 100 120

5-3448 Ptnt Lav 100 120

5-3452 Ptnt BR Lav 100 120

5-3452 Ptnt BR Shwr 112 112

5-3454 Ptnt BR Lav 100 120

5-3454 Ptnt BR Shwr 112 112

5-3456 Ptnt Vest Lav 100 120

5-3460 Ptnt Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-3464 Ptnt BR Lav 100 120

5-3464 Ptnt BR Shwr 112 112

5-3466 Ptnt BR Lav 100 120

5-3466 Ptnt BR Shwr 112 112

5-3468 Ptnt Lav 100 120

5-3472 Ptnt Lav 100 120

5-3476 Ptnt BR Lav 100 120

5-3476 Ptnt BR Shwr 112 112

5-3478 Ptnt BR Lav 100 120

5-3478 Ptnt BR Shwr 112 112

5-3480 Ptnt Lav 100 120

5-5400 Corr Lav1 100 110

5-5400 Corr Lav2 100 110

5-5400 Corr Lav3 100 110

5-5412 Ptnt Lav 100 120

5-5416 Ptnt BR Lav 100 120

5-5416 Ptnt BR Shwr 112 112

5-5418 Ptnt BR Lav 100 120

5-5418 Ptnt BR Shwr 112 112

5-5420 Ptnt Lav 100 120

5-5424 Ptnt Lav 100 120

5-5428 Ptnt BR Lav 100 120

5-5428 Ptnt BR Shwr 112 112

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-5430 Ptnt BR Lav 100 120

5-5430 Ptnt BR Shwr 112 112

5-5432 Ptnt Lav 100 120

5-5432 Ptnt Room Lav 100 120

5-5434 Ptnt Vest Lav 100 120

5-5440 Ptnt BR Lav 100 120

5-5440 Ptnt BR Shwr 112 112

5-5442 Ptnt BR Lav 100 120

5-5442 Ptnt BR Shwr 112 112

5-5444 Ptnt Lav 100 120

5-5448 Ptnt Lav 100 120

5-5452 Ptnt BR Lav 100 120

5-5452 Ptnt BR Shwr 112 112

5-5454 Ptnt BR Lav 100 120

5-5454 Ptnt BR Shwr 112 112

5-5456 Ptnt Vest Lav 100 120

5-5464 Ptnt BR Lav 100 120

5-5464 Ptnt BR Shwr 112 112

5-5466 Ptnt BR Lav 100 120

5-5466 Ptnt BR Shwr 112 112

5-5468 Ptnt Lav 100 120

5-5472 Ptnt Lav 100 120

5-5478 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

5-5480 Ptnt Lav 100 120

7-1481 Purif Ftwsh

7-1481 Purif Lav 100 120

7-2481 Purif Ftwsh

7-2481 Purif Lav 100 120

7-3600 Corr Lav1 100 110

7-3600 Corr Lav2 100 110

7-3600 Corr Lav3 100 110

7-3618 Ptnt Lav 100 120

7-3620 Ptnt BR Lav 100 120

7-3620 Ptnt BR Shwr 112 112

7-3622 Ptnt BR Lav 100 120

7-3622 Ptnt BR Shwr 112 112

7-3624 Ptnt Lav 100 120

7-3628 Ptnt Lav 100 120

7-3632 Ptnt BR Lav 100 120

7-3632 Ptnt BR Shwr 112 112

7-3634 Ptnt BR Lav 100 120

7-3634 Ptnt BR Shwr 112 112

7-3636 Ptnt Lav 100 120

7-3640 Ptnt Lav 100 120

7-3644 Ptnt BR Lav 100 120

7-3644 Ptnt BR Shwr 112 112

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

7-3646 Ptnt BR Lav 100 120

7-3646 Ptnt BR Shwr 112 112

7-3648 Ptnt Lav 100 120

7-3652 Ptnt Lav 100 120

7-3656 Ptnt BR Lav 100 120

7-3656 Ptnt BR Shwr 112 112

7-3658 Ptnt BR Lav 100 120

7-3658 Ptnt BR Shwr 112 112

7-3660 Ptnt Vest Lav 100 120

7-3662 Ptnt Lav 100 120

7-3664 Ptnt Lav 100 120

7-3668 Ptnt BR Lav 100 120

7-3668 Ptnt BR Shwr 112 112

7-3670 Ptnt BR Lav 100 120

7-3670 Ptnt BR Shwr 112 112

7-3672 Ptnt Lav 100 120

7-3672 Ptnt Room Lav 100 120

7-3678 Ptnt Bath

7-3678 Ptnt Lav 100 120

7-3678 Ptnt Lav1 100 120

7-3678 Ptnt Lav2

7-3678 Ptnt Shwr

7-3680 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

7-3680 Ptnt BR Shwr 112 112

7-3684 Ptnt BR Lav 100 120

7-3684 Ptnt BR Shwr 112 112

7-3686 Ptnt Prep Sink 100 120

7-3416 Ptnt BR Lav 100 120

7-3416 Ptnt BR Shwr 112 112

7-3418 Ptnt BR Lav 100 120

7-3418 Ptnt BR Shwr 112 112

7-3428 Ptnt BR Lav 100 120

7-3428 Ptnt BR Shwr 112 112

7-3430 Ptnt BR Lav 100 120

7-3430 Ptnt BR Shwr 112 112

7-3440 Ptnt BR Lav 100 120

7-3440 Ptnt BR Shwr 112 112

7-3442 Kitchen Sink 100 120

7-3454 Ptnt BR Lav 100 120

7-3454 Ptnt BR Shwr 112 112

7-3464 Ptnt BR Lav 100 120

7-3464 Ptnt BR Shwr 112 112

7-3466 Ptnt BR Lav 100 120

7-3466 Ptnt BR Shwr 112 112

7-3476 Ptnt BR Lav 100 120

7-3476 Ptnt BR Shwr 112 112

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

7-3478 Ptnt BR Lav 100 120

7-3478 Ptnt BR Shwr 112 112

7-5416 Ptnt BR Lav 100 120

7-5416 Ptnt BR Shwr 112 112

7-5418 Ptnt BR Bath 100 120

7-5418 Ptnt BR Lav 100 120

7-5428 Ptnt BR Lav 100 120

7-5428 Ptnt BR Shwr 112 112

7-5430 Ptnt BR Lav 100 120

7-5430 Ptnt BR Shwr 112 112

7-5440 Ptnt BR Lav 100 120

7-5440 Ptnt BR Shwr 112 112

7-5442 Ptnt BR Sink 100 120

7-5452 Ptnt BR Lav 100 120

7-5454 Ptnt BR Lav 100 120

7-5454 Ptnt BR Shwr 112 112

7-5464 Ptnt BR Lav 100 120

7-5464 Ptnt BR Shwr 112 112

7-5466 Ptnt BR Lav 100 120

7-5466 Ptnt BR Shwr 112 112

7-5474 Ptnt BR Lav 100 120

7-5474 Ptnt BR Shwr 112 112

7-5476 Ptnt BR Lav 100 120

Min

DHW T

(F)

Max

DHW T

(F) Test Date

Test Time

DHW

FCl

(ppm)

DHW

T

(F)

DHW

TtT

(Sec)

Pot FCl

(ppm)

Pot T

(F)

Pot TtT

(Sec)

7-5476 Ptnt BR Shwr 112 112

B2-3532 Toilet Lav 100 120

B2-3538 Toilet Lav 100 120

B2-3572 NMR Sink 100 120

B2-3580 NMR Sink 100 120

B2-3582 Toilet Lav 100 120

B2-3583 NMR Sink 100 120

B2-3601 NMR Sink 100 120

B2-3603 NMR Sink 100 120

B2-3615 NMR Sink

B2-3617 Exam Lav 100 120

B2-3617 Toilet Lav2 100 120

B2-3619 NMR Sink 100 120

B2-3640 NMR Sink 100 120

B2-3643 NMR Sink 100 120

B2-3650 NMR Sink 100 120

B2-4625 Toilet Lav 100 120

B2 NMR Control Room Sink 100 120

Table 2: Dialysis Rooms

Room Locations:

3-1408 3-3444 3-3636 3-3676 3-5650 5-3420 5-3640 5-5454

3-1648 3-3448 3-3640 3-3684 3-5652 5-3424 5-3664 5-5456

3-3412 3-3456 3-3650 3-5618 3-5660 5-3438 5-3684 5-5458

3-3420 3-3617 3-3652 3-5624 3-5664 5-3444 5-5436 5-5460

3-3424 3-3618 3-3660 3-5628 3-5672 5-3448 5-5444 5-5464

3-3432 3-3624 3-3664 3-5636 3-5676 5-3458 5-5448

3-3436 3-3628 3-3672 3-5640 3-5684 5-3636 5-5452

File details come from the government source that posted it. Updated .