United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
RENOVATE AAO OFFICES
PACIFIC WEST AREA
ALBANY, CA
Date: February 7, 2023
STATEMENT OF WORK
1.0 CONTRACT PROJECT:
a. Project Title: Renovate AAO Offices
b. Project Location: Pacific West Area 800 Buchanan St, Albany, CA
2.0 PROJECT CONTACT PERSONS:
a. CONTRACTING OFFICER (CO):
Lam Pham
USDA-ARS-PWA
Email: lam.pham@usda.gov Tel. No.: 510-559-6307
b. LOCATION MONITOR (LM):
Ken Cushman
USDA-ARS-PWA
800 Buchanan Street Albany, CA 94710 Email: ken.cushman@usda.gov Tel. No.: 510-529-5921
c. CONTRACTING OFFICERS REPRESENTATIVE (COR):
Peter Lane
USDA-ARS-PWA
Email: peter.lane@usda.gov Tel. No.: 510-559-6340
d. AREA SAFETY AND HEALTH MANAGER Ken Cushman
USDA-ARS-PWA
Email: ken.cushman@usda.gov Tel. No.: 510-529-5921
e. ENGINEERING PROJECT MANAGER (EPM) Peter Lane
USDA-ARS-PWA
800 Buchanan St. Albany, CA 94710
Email: peter.lane@usda.gov Tel. No.: 510-559-6340 mailto:ken.cushman@usda.gov mailto:peter.lane@usda.gov mailto:ken.cushman@usda.gov mailto:peter.lane@usda.gov
3.0 PROJECT DESCRIPTION:
The Area Administrative Office (AAO) for the Pacific West Area (PWA) of the Agricultural Research Service (ARS) is renovating offices spaces as part of an office consolidation.
Renovate offices according to the project specifications and drawings. Work includes carpet, hard flooring, painting, interior wall remodeling, mechanical, electrical, IT and other work as described in the project specifications and drawings.
4.0 PROJECT REQUIREMENTS:
a. Do not disturb hazardous materials and report condition immediately to the Contracting Officer’s Representative (COR) regarding potentially hazardous conditions that are uncovered. Stop work in the area of the questionable material or condition until identification and direction is provided.
b. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e., IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.
c. Access the site between 8:00 am and 4:00 pm Monday through Friday excluding federal holidays. Contractor staff must sign-in on the first day of arrival and then sign-out on the final day of the project, upon completion. All Contractor personnel on-site must be US Citizens or permanent residents.
4.1 Background & Site Description:
The Western Regional Research Center (WRRC) building has several federal tenants, including the AAO offices. The AAO provide administrative support to all ARS locations within PWA. The AAO is consolidating and reducing office space in the WRRC building to better meet mission needs and current personnel numbers. This project will renovate the new or existing AAO offices to enable this office move. A separate contract will provide and install integrated workstations and standalone office furniture.
4.1 Bid Schedule:
Provide all labor, equipment and materials to perform this Statement of Work and Schedule of Items.
Description Units Quantity Total
All work not otherwise specified LS 1 Room 2020 sound wall LS 1
3025/3025A cover metal partition wall LS 1 3032 flooring and base LS 1
4.2 Description of Work:
See attached plans and specifications.
4.3 Government Furnished Equipment\Services
a. Government will furnish a reasonable amount of electricity and water.
5.0 GENERAL REQUIREMENTS:
5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
The Contractor shall obtain building permit from the City of Albany and coordinate inspections.
5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Government. All disturbances of existing systems shall be thoroughly coordinated with the Government to prevent disturbances that might jeopardize on-going operations and research. Government reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Government prior to starting demolition operations.
Contractor shall legally dispose all any materials removed that will not be retained.
5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.
5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the Location Monitor and Engineering Project Manager for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements.
Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval.
5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor.
5.6 Protection of Work and Property/Safety Requirements:
a. Contractor shall furnish an Injury-Illness Prevention Plan (IIP) (APP) in accordance with California and OSHA requirements ten days after contract award. SSSP / APP shall be approved by the Government before construction work commences.
b. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the Location Monitor.
c. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.
d. Contractor is responsible for verifying location of any underground utilities and is responsible for any damaged caused to such utilities.
5.7 Temporary Facilities:
a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b. Should the Contractor require any power or utility shutdowns during construction, the
Contractor shall obtain approval for such shutdown from the Location Monitor and Engineering Project Manager fourteen (14) calendar days prior to the need.
5.8 Materials and Equipment:
a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.
b. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the Government.
c. Government will not furnish any labor or equipment to unload or move materials or supplies.
5.9 Cleanup: The construction site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the Location Monitor.
5.10 Warranty:
a. Submit data concerning the standard one year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.
5.11 Final Payment/Contract Closeout: The following documents are REQUIRED PRIOR TO
FINAL PAYMENT (other documents may also be required):
a. General contractor’s minimum one (1) year warranty on work.
b. Release of liens
c. Final Invoice
6.0 Project Schedule:
All work except 1025/2020 doors must be completed within 45 calendar days from Notice to
Proceed. The 1025/2020 doors must be completed within 5 calendar days after furniture is installed by 15 June 2023.
Do not start construction in room 3025 and 3025A until room 3032 is complete. Allow
Government 5 calendar days to relocate from 3025 and 3025A to 3032.
7.0 Attachments
- Furniture plan
8.0 Figures
Room 2020, SE corner facing NW
Room 2020, SE corner facing W
Room 2020, NW corner facing E
Room 2020, SW corner facing E
Room 2022, doorway facing E
Room 2023, doorway facing W
Room 2023, mid-room facing E
Room 2024, doorway facing E
Room 2024, mid-room facing W
Room 3025, doorway facing W
Room 3025A, mid-room facing W
Room 3032, hallway facing S
LFH
WB
WB
LFH
WB
WB
LFH
WB
WB
LFH
WB
WB
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Agricultural Research Service
2/1 0/2
3 1 5:
P
ET
ER
.L
AN
E C:
\U
SE
RS
\P
ET
ER
.L
AN
E\
ON
ED
RI
VE
US
DA
\A
LB
AN
Y\
FY
M
OV
E
OU
T\
RE
NO
VA
TI
ON
S\
DR
AW
IN
GS
\A
AO
R
EN
OV
AT
IO
N
X1 7.D
W G;
02/10/2023
P. LANE
P. LANE
K. CUSHMAN
G-01
005001
RENOVATE AAO OFFICES
USDA AGRICULTURAL RESEARCH SERVICE
PACIFIC WEST AREA
ALBANY, CA
PROJECT LOCATION
PROJECT LOCATION
800 BUCHANAN ST
ALBANY, CA
AREA MAP
LOCATION MAP
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVER SHEET
A-01 2ND FLOOR PLAN
A-02 3RD FLOOR PLAN
A-03 IT/AV PLAN
A-04 GENERAL NOTES AND SPECIFICATIONS
2ND FLOOR KEY MAP
3RD FLOOR KEY MAP
PROJECT LOCATION
PROJECT
LOCATION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2030A
AutoCAD SHX Text 2030B
AutoCAD SHX Text 2006A
AutoCAD SHX Text 2006B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2200C
AutoCAD SHX Text 2200D
AutoCAD SHX Text 2200F
AutoCAD SHX Text 2200A
AutoCAD SHX Text 2201A
AutoCAD SHX Text 2201F
AutoCAD SHX Text 2201D
AutoCAD SHX Text 2201C
AutoCAD SHX Text 2200B
AutoCAD SHX Text 2201B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3015A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3002A
AutoCAD SHX Text 3004A
AutoCAD SHX Text 3006A
AutoCAD SHX Text 3010A
AutoCAD SHX Text 3030A
AutoCAD SHX Text
AutoCAD SHX Text 3025A
AutoCAD SHX Text 3023A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3200C
AutoCAD SHX Text 3200D
AutoCAD SHX Text 3200F
AutoCAD SHX Text 3200A
AutoCAD SHX Text 3201A
AutoCAD SHX Text 3201F
AutoCAD SHX Text 3201D
AutoCAD SHX Text 3200G
AutoCAD SHX Text 3201G
AutoCAD SHX Text 3201C
11'-9" 12'
'-6
12' 12' 24'-6"
'-6
17 17
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Agricultural Research Service
2/1 0/2
3 1 5:
P
ET
ER
.L
AN
E C:
\U
SE
RS
\P
ET
ER
.L
AN
E\
ON
ED
RI
VE
US
DA
\A
LB
AN
Y\
FY
M
OV
E
OU
T\
RE
NO
VA
TI
ON
S\
DR
AW
IN
GS
\A
AO
R
EN
OV
AT
IO
N
X1 7.D
W G;
RENOVATE AAO
OFFICES
PACIFIC WEST AREA
800 BUCHANAN ST
ALBANY, CA
2ND FLOOR PLAN
02/10/2023
P. LANE
P. LANE
K. CUSHMAN
A-01
005002
ABBREVIATIONS AND NOTES
CPT-1: CARPET
CLN-1: CLEAN EXISTING CARPET
RB-1: RUBBER BASE
PNT-1: PAINT ALL INTERIOR WALLS
PNT-2: SPOT/TOUCH UP PAINT
NIC: NOT IN CONTRACT
KEY NOTES
1. FILL IN (2) INTERIOR WINDOWS, EACH APPROX 44" x 44". MATCH EXISTING WALLS
AND PAINT.
2. SWITCH DOORS AND LOCK HARDWARE BETWEEN ROOM 1025 AND 2020. THIS ITEM
MUST BE COMPLETE AFTER FURNITURE INSTALL IN ONE DAY TO MAINTAIN
SECURITY
3. FILL IN INTERIOR DOOR. MATCH EXISTING WALLS AND PAINT.
4. REMOVE LOOSE 12X12 CEILING TILES, APPROX QTY 6
5. REPLACE 2x4 CEILING TILES (ROOM 2020 = 4, 2022 = 5, 2024 = 4, 2025 = 3)
6. REMOVE CEILING FAN AND REPLACE 1 SECTION OF CEILING GRID. REMOVE
WIRING BACK TO JUNCTION BOX.
7. REPLACE 1 SECTION OF CEILING GRID
8. REMOVE WALL-MOUNTED WOOD FURNITURE SUPPORT. MATCH EXISTING WALLS
AND PAINT.
9. INSTALL SOUND REDUCING DRYWALL ON FURRING STRIPS UP TO CONCRETE
BEAM. MODIFY CEILING GRID AND TILES AS REQUIRED TO MATCH NEW SURFACE.
REATTACH AC UNIT AND OTHER SURFACE MOUNTED CONDUIT AND WIRES TO
NEW WALL.
10. SCRAPE AND REMOVE BUBBLING DRYWALL/PATCH COMPOUND
15. RELOCATE THERMOSTAT FROM SOUTH WALL TO WEST WALL BY DOOR
16. NOT USED
17. PATCH CONCRETE FLOOR WITH NONSHRINK GROUT. PATCH AND REPAIR WALL
TO MATCH ADJACENT WALLS. RADIATOR WILL BE REMOVED AND STEAM PIPING
PLUGGED BY OTHERS.
2ND FLOOR PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
6' -3
32"
32"
32"
5'
32"
7'
'-4
5'-10"
30"
85' -8
9 9
9'
70"
70"
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Agricultural Research Service
2/1 0/2
3 1 5:
P
ET
ER
.L
AN
E C:
\U
SE
RS
\P
ET
ER
.L
AN
E\
ON
ED
RI
VE
US
DA
\A
LB
AN
Y\
FY
M
OV
E
OU
T\
RE
NO
VA
TI
ON
S\
DR
AW
IN
GS
\A
AO
R
EN
OV
AT
IO
N
X1 7.D
W G;
RENOVATE AAO
OFFICES
PACIFIC WEST AREA
800 BUCHANAN ST
ALBANY, CA
IT/AV PLAN
02/10/2023
P. LANE
P. LANE
K. CUSHMAN
A-04
005004
2ND FLOOR ELECTRICAL AND IT PLAN
3RD FLOOR ELECTRICAL AND IT PLAN
NETWORK LEGEND
NETWORK DROP TO REMAIN
NETWORK DROP TO BE RELOCATED
RELOCATED NETWORK DROP NEW LOCATION
NETWORK DROP TO CHANGE HEIGHT
32"
3 NUMBER OF NETWORK CABLES. ALL IF NOT SPECIFIED
HEIGHT FROM FLOOR TO BOTTOM OF NETWORK
BOX. 15" IF NOT SPECIFIED.
KEY NOTES
1. PARTIAL LENGTH OF WALL MOUNTED ELECTRICAL RACEWAY WILL BE REMOVED BY OTHERS.
2. PROVIDE AND INSTALL ON-FLOOR WIREWAY. PROVIDE THE FOLLOWING AT END OF THE WIREWAY:
2.1. FOUR OUTLETS WITH ELECTRICAL PIGTAIL. PIGTAIL WILL BE CONNECTED TO ELECTRICAL SYSTEM
BY OTHERS.
2.2. THREE NETWORK DROPS. TERMINATE IN JACK.
2.3. COILED ENDS OF 3 HDMI CABLES AND 1 ETHERNET CABLE PER BELOW.
3. PROVIDE AND INSTALL WALL CHANNEL FROM FLOOR TO DROP CEILING.
4. PROVIDE QTY=1, 50' ROUTED HDMI CABLE FROM END OF ON-FLOOR WIREWAY TO CEILING AT LOCATION
INDICATED. COIL CABLE ENDS IN CEILING AND ON FLOOR.
5. PROVIDE QTY=2, 25' ROUTED HDMI CABLES FROM END OF ON-FLOOR WIREWAY TO CEILING AT
LOCATION INDICATED. COIL CABLE ENDS IN CEILING AND ON FLOOR.
6. PROVIDE QTY=1, 50' ROUTED CAT-6 ETHERNET CABLE FROM END OF ON-FLOOR WIREWAY TO CEILING
AT LOCATION INDICATED. COIL CABLE ENDS IN CEILING AND ON FLOOR.
7. CEILING MOUNTED SINGLE GANG OUTLET AT LOCATION INDICATED FOR PROJECTOR WILL BE
PROVIDED BY OTHERS.
8. PROVIDE QTY=1, ROUTED USB AND QTY 1, ROUTED HDMI THROUGH CEILINGS AT LOCATIONS SHOWN.
TERMINATE IN FEMALE PLUGS IN BOXES. ON SOUTH WALL, MOUNT 15" ABOVE FLOOR. ON NORTH
WALL, MOUNT 32" ABOVE FLOOR ADJACENT TO NEW ELECTRICAL OUTLET.
9. REMOVE PHONE JUNCTION BOXES AND ASSOCIATED PLYWOOD AND SURFACE MOUNTED CONDUIT UP
TO ELECTRICAL CHASE
10. REMOVE 3 SURFACE MOUNTED TELEPHONE BOXES
11. COVER EXISTING JUNCTION BOX WITH FACEPLATE
12. USE PATCH NETWORK CABLE PLUGGED INTO EXISTING TERMINATIONS. ROUTE CABLE THROUGH
SURFACE MOUNTED CONDUIT TO IN-FLOOR RACEWAY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3025A
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Agricultural Research Service
2/1 0/2
3 1 5:
P
ET
ER
.L
AN
E C:
\U
SE
RS
\P
ET
ER
.L
AN
E\
ON
ED
RI
VE
US
DA
\A
LB
AN
Y\
FY
M
OV
E
OU
T\
RE
NO
VA
TI
ON
S\
DR
AW
IN
GS
\A
AO
R
EN
OV
AT
IO
N
X1 7.D
W G;
RENOVATE AAO
OFFICES
PACIFIC WEST AREA
800 BUCHANAN ST
ALBANY, CA
GENERAL NOTES AND
SPECIFICATIONS
02/10/2023
P. LANE
P. LANE
K. CUSHMAN
A-05
005005
GENERAL NOTES
ALL MEASUREMENTS ARE APPROXIMATE. FIELD VERIFY.
REVIEW AND FIELD VERIFY ALL LOCATIONS WITH GOVERNMENT.
THE CONTRACTOR SHALL OBTAIN BUILDING PERMIT FROM THE CITY OF ALBANY AND
COORDINATE INSPECTIONS.
CARPET
REMOVE AND DISPOSE OF EXISTING CARPET. REUSE EXISTING THRESHOLDS.
PREPARE SURFACE AND INSTALL PER MANUFACTURER'S RECOMMENDATIONS
CARPET TO BE SHAW DATELINE TODAY 54823 WITH COLOR RECAPS 00210 OR
APPROVED EQUAL.
- FIBER: NYLON
- CONSTRUCTION: LOOP
- STITCHES PER INCH: 10
- DYE METHOD: SOLUTION DYED
- TUFTED WEIGHT: 28 OZ/YD3
- AVERAGE DENSITY: 8064 OZ/YD3
- FINISHED PILE THICKNESS: 0.125"
- TOTAL THICKNESS: 0.28"
- ROLL SIZE: 12'
CARPET CLEANING
VACUUM AND DEEP CLEAN CARPET. PRETREAT AND REMOVE SPOTS AND STAINS. USE
SOLUTION AND EXTRACT WITH A DEEP CLEANING SYSTEM. DRY CARPET.
SHEET LINOLEUM
REMOVE AND DISPOSE OF EXISTING FLOORING. REUSE EXISTING THRESHOLDS.
CONFORM TO ASTM F1303, TYPE I, GRADE 1, CLASS A-NON-ASBESTOS FORMULATED
FIBROUS BACKING OR CLASS B-NONFOAMED PLASTIC BACKING (MINIMUM WEAR LAYER
THICKNESS 0.5 MM 0.020 INCH AND MINIMUM OVERALL THICKNESS 0.080 INCH) AND A
MINIMUM 6 FEET WIDE. AS REQUIRED, PROVIDE WELDING RODS AS RECOMMENDED BY
THE MANUFACTURER FOR HEAT WELDING OF JOINTS.
PREPARE SURFACE AND INSTALL PER MANUFACTURER'S RECOMMENDATIONS
PROVIDE COLOR SAMPLES FOR SELECTION
RUBBER BASE
REMOVE AND DISPOSE OF EXISTING BASE. SIZE NEW: 6" COVE
PAINT
- COLOR AND SHEEN TO MATCH ROOM 2025. MATCH MULTIPLE SAMPLES UNTIL
APPROVED BY GOVERNMENT.
- PAINT TO BE ON MASTER PAINT INSTITUTE (MPI) #145 APPROVED PRODUCT LIST
- FOR INTERIOR PAINT AND SPOT/TOUCH UP PAINT, REMOVE SCREWS, NAILS,
HOOKS, REPAIR MINOR JOINTS, CRACKS, HOLES, SURFACE IRREGULARITIES AND
OTHER MINOR DEFECTS WITH PATCHING PLASTER OR SPACKLING COMPOUND
AND SAND SMOOTH.
- FOR INTERIOR PAINT AND SPOT/TOUCH UP PAINT, CLEAN SURFACES AS
RECOMMENDED BY PAINT MANUFACTURER
- WHERE INDICATED TO PAINT INTERIOR WALLS, PAINT DOORS AND INTERIOR TRIM
TO MATCH EXISTING
INTERIOR CONSTRUCTION
FILL IN OR REMOVE WINDOWS AND DOORS AS INDICATED OR CONSTRUCT WALLS AND
INFALL AS INDICATED. USE 2x4 WOOD OR METAL STUDS, 5/8" GYPSUM WALLBOARD, TAPE AND TEXTURE TO MATCH ADJACENT WALLS ON BOTH SIDES OF WALL. COAT
WITH TWO COATS OF PAINT.
SOUND REDUCING DRYWALL TO BE QUIETROCK 530 OR APPROVED EQUAL, 5/8" THICK
WITH RATED STC IN FULL WALL ASSEMBLIES TO BE MINIMUM OF 52.
ELECTRICAL WIRING
CONNECT GOVERNMENT PROVIDED WIRING PIGTAILS FOR NEW CUBICLE
WORKSTATIONS. COORDINATE CONNECTION WITH FURNITURE INSTALLERS. HARD
WIRE CONNECTION AT APPROXIMATE LOCATION INDICATED ON FURNITURE
ELECTRICAL PLAN.
ROUTE WIRE THROUGH WALLS. WHERE WALLS ARE NOT STUD FRAMING, USE
SURFACE MOUNTED CONDUIT.
ALL ELECTRICAL TO BE DONE BY LICENSED ELECTRICIAN.
HDMI/USB CABLE AND CONNECTIONS
USE FEMALE-FEMALE CABLE OR PROVIDE FEMALE-MALE CONNECTORS WITH
MALE-MALE CABLE. CABLE AND CONNECTIONS TO BE SHIELDED, RATED TO HDMI 2.1a /
USB 3.0 AND IN-WALL USE.
ROUTE WIRE THROUGH WALLS. WHERE WALLS ARE NOT STUD FRAMING, USE
SURFACE MOUNTED CONDUIT.
DEMONSTRATE FUNCTIONALITY TO GOVERNMENT.
NETWORK WIRING
THE TELECOMMUNICATIONS INSTALLER SHALL BE A FIRM WHICH IS REGULARLY AND
PROFESSIONALLY ENGAGED IN THE BUSINESS OF THE APPLICATIONS, INSTALLATION,
AND TESTING OF THE SPECIFIED TELECOMMUNICATIONS SYSTEMS AND EQUIPMENT.
PROVIDE CAT-6e CABLES, SURFACE MOUNTED CONDUIT, JUNCTION BOXES, FACEPLATES, TERMINATIONS AND OTHER ACCESSORIES AS REQUIRED. MAINTAIN
EXISTING LABELS AND RELABEL AS DIRECTED BY GOVERNMENT. TEST IN
ACCORDANCE WITH TIA-568 AND PROVIDE RESULTS TO GOVERNMENT. ASSIST
GOVERNMENT IN DATA VERIFICATION TESTS.
ALL NETWORK CABLES CONNECT TO SWITCHES IN ROOM 3016.
ROUTE WIRE THROUGH WALLS AND CEILING EXCEPT WHERE INDICATED. WHERE
WALLS ARE NOT STUD FRAMING, USE SURFACE MOUNTED CONDUIT.
IN ROOM 2020, EXISTING CABLES HAVE BEEN CUT AND ARE NOT LABELED. TEST AND
LABEL CABLES TO CORRESPOND WITH LABELS AT SWITCH.
ON-FLOOR CONDUIT AND CONFERENCE TABLE WIRING AND CONNECTIONS
CONDUIT TO BE SOUTHWEST SOLUTIONS CONNECTRAC ON-FLOOR WIREWAY SYSTEM
OR APPROVED EQUAL WITH THE FOLLOWING CHARACTERISTICS:
- LOW PROFILE EXTRUDED ALUMINUM CHANNEL WITH DURABLE, CLEAR ANODIZED
ALUMINUM FINISH
- LAY DIRECTLY ON FINISHED FLOOR AND FASTENED TO CONCRETE SUBFLOOR
- REMOVABLE WIREWAY TOP CAP
- ADA COMPLIANT
- ON-FLOOR COMPONENT 9" WIDE AND 0.86" HIGH. INSIDE DIMENSIONS 3.1" x 0.6".
- AT END OF WIRE-WAY, QUAD RECEPTACLE AND TELECOM OPENINGS, PART
NUMBER PM-RECM-QD-1111
- WALL CHANNEL PART NUMBER AC-WC-144-AL
O ff ic e
Fu rn itu re
G ro up
Fi rs t S tr ee t N .W
. B ui ld in g
W as hi ng to n, D
.C un ic or
.g ov
/o fg
Ò
| / |
| United States Department of Agriculture |
| Agricultural Research Service |
| AAO Renovation 11x17 Drawings.pdf |
| Sheets and Views |
| AAO Renovation 11x17-Cover |
| AAO Renovation 11x17-Page 1 |
| AAO Renovation 11x17-Page 2 |
| AAO Renovation 11x17-Page 3 |
| AAO Renovation 11x17-Page 4 |
File details come from the government source that posted it. Updated .