- Request for Quote (RFQ) # 12905B23Q0041 Renovate Area Administrative Offices, Albany, CA
- Solicitation number
- 12905B23Q0041
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12905B23Q0041 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12905B
ALBANY CA 94710
800 BUCHANAN STREET
USDA ARS PWA AAO ACQ/PER PROP
03/13/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/13/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Question: During the site walk, we asked to confirm that cleaning of the existing carpets is required. This was not confirmed. Please advise if it is required to clean the existing carpet in offices that do not call for new carpet.
Answer: Clean carpet in rooms identified on the finish schedules on sheets A-01 and A-02
Question: Please confirm that all existing radiators will remain in place or will be removed by others. Removal of existing radiators is not in scope.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LAM V. PHAM
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12905B23Q0041/0001
Answer: Removal of radiators is not in scope.
The Government will remove the radiator in room
2020. All other radiators will remain in place.
See keynote 17 on sheet A-01.
Question: For rooms 3025 and 3025A, note 14 calls for a furred-out wall over the existing wall.
There are existing electrical outlets and electrical strips on this wall. Will we need to demo the existing outlets and move them into the furred wall?
Answer: Government will remove surface mounted outlets and raceway and replace onto new wall or validate that outlets to remain are non-function and not connected. See revised A-02. Gov¿t will confirm outlets integrated in metal divider wall are non-functional before project commences.
Question: In some of the rooms there are existing electrical outlets installed in the floor base.
Please advise on how to address these outlets where the requirement is to remove and reinstall floor base.
Answer: Maintain existing outlets. Cut base around outlet and replace with outlet cover. See revised A-05
Question: For room 2020, note 10 calls to scrap and remove bubbling drywall and patch. During the site walk this scope was called into question.
Please advise if this is still part of the scope of work, or if it no longer applies.
Answer: This no longer applies. Government will patch as required. Contractor to paint with rest of wall. See revised A-01.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12905B23Q0041/0001
Question: In Room 2020, keynote 9, it states to install new furred wall up to concrete beam and modify ceiling grid and tiles as required. During the site walk, it was stated the new wall is to be installed up to the existing ceiling only and not beyond. The existing ceiling will not require adjustment for the new furred wall. Please confirm.
Answer: New sound wall will only go up to ceiling grid. Furring is optional. Contractor to place rigid insulation between wall and concrete beam to increase sound deadening. See revised A-01.