Attachment 2 - SONET Migration Pricing.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Amendment 2 – SONET to DWDM Migration
Solicitation number
FA461025Q0003
Issued by

About this file

This document is an attachment that includes pricing templates for the migration of up to 525 circuits from Synchronous Optical Network (SONET) to Dense Wavelength Division Multiplexing (DWDM) Optical Transport Network (OTN) at Vandenberg Space Force Base (VSFB). The pricing templates cover the base requirement for 450 circuits as well as two bid options for an additional 50 and 25 circuits. The templates include estimated labor and material costs for the Ciena equipment and services required to complete the migration.

The related federal contract opportunity is a solicitation (FA461025Q0003) issued by the Department of the Air Force Space Command (Air Force Space Command) for the SONET to DWDM migration project at VSFB. The description indicates that the DWDM OTN architecture is operational and ready for the migration of the 1879 total circuits from the current end-of-life SONET infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base CLINs SONET / DWDM Migration (FIRST 450 CIRCUITS) IN ADDITION TO THIS SHEET, PLEASE REVIEW AND COMPLETE TAB 2 FOR BID OPTION PRICING.

GOVERNMENT RESERVES THE RIGHT TO AWARD OR NOT AWARD THE BID OPTIONS.

IF AWARDED, BID OPTIONS WILL BE INCLUDED IN THE TOTAL EVALUATED PRICE.

Ciena Services / EquipmentUnitEst $$ / Unit# Units/HoursItem/Labor Cost
Circuits to migrate450
Labor$0
Program ManagerHR$0
Project ManagerHR$0
Network Solutions EngineerHR$0
Test TechnicianHR$0
Any other Labor Needed (PLEASE NOTATE LABOR CATEGORY)HR$0
Installation Related Materials$0
6 ft Cat6 shieldedEA$0
10 ft Cat6 shieldedEA$0
30 ft Cat6 shieldedEA$0
6 ft Fiber single mode LC connectorsEA$0
10 ft Fiber single mode LC connectorsEA$0
30 ft Fiber single mode LC connectorsEA$0
Other materials as requiredEA$0
Test Equipment RentalEA$0
Total Cost$0

Bid Options

SONET / DWDM Migration (Bid Option 1 - Additional 50 Circuits (PWS 3.10))
Ciena Services / EquipmentUnitEst $$ / Unit# Units/HoursItem/Labor Cost
Circuits to migrate50
Labor$0
Program ManagerHR$0
Project ManagerHR$0
Network Solutions EngineerHR$0
Test TechnicianHR$0
Any other Labor Needed (PLEASE NOTATE LABOR CATEGORY)HR$0
Installation Related Materials$0
6 ft Cat6 shieldedEA$0
10 ft Cat6 shieldedEA$0
30 ft Cat6 shieldedEA$0
6 ft Fiber single mode LC connectorsEA$0
10 ft Fiber single mode LC connectorsEA$0
30 ft Fiber single mode LC connectorsEA$0
Other materials as requiredEA$0
Test Equipment RentalEA$0
Total Cost$0
SONET / DWDM Migration (Bid Option 2 - Additional 25 Circuits (PWS 3.10))
Ciena Services / EquipmentUnitEst $$ / Unit# Units/HoursItem/Labor Cost
Circuits to migrate25
Labor$0
Program ManagerHR$0
Project ManagerHR$0
Network Solutions EngineerHR$0
Test TechnicianHR$0
Any other Labor Needed (PLEASE NOTATE LABOR CATEGORY)HR$0
Installation Related Materials$0
6 ft Cat6 shieldedEA$0
10 ft Cat6 shieldedEA$0
30 ft Cat6 shieldedEA$0
6 ft Fiber single mode LC connectorsEA$0
10 ft Fiber single mode LC connectorsEA$0
30 ft Fiber single mode LC connectorsEA$0
Other materials as requiredEA$0
Test Equipment RentalEA$0
Total Cost$0