Attachment 2 - SON-9 MUNS B1322-FINAL Aug2026.pdf

PDF 8 MB Posted

Attached to
9 MUNS B1322 - Asbestos Abatement & Carpet Replacement
Solicitation number
FA468626QS026
Issued by

About this file

This is a Statement of Need for carpet replacement and asbestos abatement work at Building 1322, Beale Air Force Base, scheduled for completion by August 2026.

The contractor must replace existing carpet with 212 square yards of 24"x24" carpet tiles in all carpeted areas except those with existing tiles and concrete. Approved carpet tile options include products from J+J Flooring Group (Knit 2711, Boucle 3081), Interface Americas (After Dark 105704 Night Flight), Mohawk (BT437 Shaded Lines), Mannington (Acorn 84334 Entwined), Tarkett (Cedar Deck 36205 Fabricate), Milliken (Empire DES174 City Proper), and Bentley Mills (Backstage 8BC200AA1K 4GS-T). Cove base material consists of 520 linear feet of 4" Tarkett TA9 Indigo with no corners required. Material ordering must follow the Air Force Carpet II Ordering Guide through Tier I Contractors, with no contractor markup or profits allowable on Tier I purchases. The contractor must remove asbestos-containing materials (ACM) from carpeted areas, prep the concrete subfloor, and dispose of all debris per an approved abatement plan. Required submittals include an Asbestos Abatement plan with worker certifications, asbestos air clearance sample results from a California-certified consultant, EPA NESHAP notification (submitted at least 10 business days before work begins), and a hazardous waste manifest. The contractor must comply with all applicable Federal, State, and local regulations including 29 CFR Part 1910.1001, 29 CFR Part 1926.1101, 40 CFR Part 763 Subpart E, Cal OSHA Construction Safety Orders, and California Environmental Health Standards. Work is authorized only during September 29–October 16 and November 10–27, with hours limited to 0700–1600 Monday through Friday. All contractor personnel must complete base entry authorization lists within two weeks and possess two forms of identification or REAL ID. All waste must be removed off-base, and the contractor must maintain good housekeeping practices while complying with AFOSH, COVID-19 safety regulations, and applicable NFPA, AFI, UFC, and ETL fire safety standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement Of Need

B1322 Replace Carpet, Asbestos Abatement

Beale Air Force Base AFB 95903

Aug 2026

General Scope. The Contractor shall furnish all supervision, labor, tools, equipment, materials, operations, incidentals, and deliverables as required to do the following at building 1322:

• Replace the existing carpet with new carpet tiles and cove base in all existing carpeted areas except for areas with existing tiles and concrete.

• Compliance is mandatory to follow ordering procedures outlined in the Air Force Carpet II

Ordering Guide. Per the guide, Contractors are required to contact the Tier I Contractors for material quotes and orders. NOTE: Contractor mark-up/profits are not allowable on items purchase via Tier I contracts.

Carpet Selection 24”x24” Carpet Tile

Carpet Material

J+J Flooring Group: Knit 2711, Boucle 3081 Collection

Interface Americas: After Dark 105704 Night Flight Collection

Mohawk: BT437 Shaded Lines Tile Page 4, 979 Pencil Lead

Mannington: Acorn 84334 Entwined Collection

Tarkett: Cedar Deck 36205 Fabricate Collection Milliken:

Empire DES174 City Proper Collection

Bentley Mills: Backstage 8BC200AA1K 4GS-T

Square Yards 212

Cove Base Material 4” size; Tarkett TA9 Indigo

Linear Feet 520

Number of Corners None

Asbestos Abatement and Submittals

• Remove ACM in all offices and rooms with existing carpet except for areas with existing tiles and concrete.

• Prep concrete subfloor to ensure ACM is removed and new carpet tiles adhere to it.

Grinding may be required if the underlying material is not easily removed.

• Submit an Asbestos Abatement plan with applicable asbestos worker/abatement certifications.

• Remove all debris/waste/ACM materials identified in the asbestos report and dispose per abatement plan.

• Asbestos air clearance sample results, performed under direct supervision of a third-party California-certified asbestos consultant.

• Submit to the United States Environmental Protection Agency (U.S. EPA) written

NESHAP notification of regulated asbestos renovation activities, at least 10 business days before starting renovation or demolition work. A signed copy of the notification form shall be submitted to U.S. EPA at the address below:

US EPA Pacific Southwest, Region 9 75 Hawthorne St.

San Francisco, CA 94105

There is no fee associated with submitting an Asbestos Notification Form to U.S. EPA.

Contractor shall submit a copy of the notification submittal to 9 CES/CEIE (Environmental)

Air Quality/Toxics Program Manager, Susan Stewart, at susan.stewart.7@us.af.mil.

• Submit a hazardous waste manifest to 9 CES/CEIE Environmental Manager, Eric

Maresh, at eric.maresh.3@us.af.mil.

• The Contractor shall also adhere and comply with the following:

o All applicable Federal, State, and local regulations prior to and during commencement of work to include 29 CFR Part 1910.1001, 29 CFR Part

1926.1101, 40 CFR Part 763, subpart E, 15 USC Chapter 53, and 40 CFR Part

61, subpart M, prescribe requirements for identifying, monitoring, removal and disposal of asbestos containing materials (ACM), notifying building occupants of potential asbestos-related hazards, and acquiring specialized asbestos-related training.

o State regulations Cal OSHA Construction Safety Orders—(Title 8 CCR, Ch 4, Subchapter 4, Article 4, Section 1529) and Environmental Health Standards for Management of Hazardous Waste— (Title 22 CCR, Social Security, Division 4.5

Access. The Contractor Manager or alternate shall complete an entry authorization list mailto:susan.stewart.7@us.af.mil mailto:eric.maresh.3@us.af.mil

(EAL) for access to Beale Air Force Base. The request shall be submitted within two (2) weeks of delivery to Pass and Registration via the Government Point of Contact (POC) identified in the inspect and accept information section of the contract. All contractor vehicles must enter the base via Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List (EAL) throughout duration of work performance. Any person in the EAL are required to bring two (2) forms of identification or REAL ID to access the base.

Hours of Operation. All work shall be accomplished between the hours of 0700- 1600, Monday through Friday, or as coordinated with the user. The user shall provide escorts during these carpet operations.

Authorized Work Windows (Special Consideration): Work is strictly authorized only during the following dates to deconflict with AFCOMAC class schedules:

• 29 September – 16 October

• 10 November – 27 November

New Years Day 1 January

Martin Luther King Day 3rd Monday in January

Washington’s Birthday 3rd Monday in February

Memorial Day Last Monday in May

Juneteenth 19 June

Independence Day 4 July

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veterans Day 11 November

Thanksgiving Day 4th Thursday in November

Christmas Day 25 December

If these Holidays fall on Saturday, the preceding Friday will be observed. If these Holidays fall on Sunday, the following Monday will be observed.

Any other day designated by Federal

Statute Any other day designated by

Executive Order

Any other day designated by the President’s Proclamation

Down-days. (i.e., Family Day) declared by the AETC Commander are considered duty days and are not included in the definition of a holiday.

Administrative Days. The Wing Commander may order a base closure due to weather or other unforeseen circumstances. Contractor employees shall not report to work if the base is closed, but work shall be accomplished as soon as possible after reopening the base.

Work Items. The contractor shall comply with all applicable Federal, State, and local NEC construction standards. Current Air Force Occupational Safety and Health (AFOSH) and

COVID-19 safety regulations also apply.

The Contractor shall comply with IAW all NFPA, AFI, UFC and ETL standards for fire safety.

All waste material is to be removed off base by the contractor. The Contractor will practice good housekeeping during the project.

Figure 1: Hallway

Figure 2: Room 1, Rear POV

Figure 3: Room 1, Entrance POV

Figure 4 Room -2, POV 1

Figure 5 Room - 2 POV 2

Figure 6 Room 2 POV 3

Figure 7 Room -2 POV 4

Figure 8 Room 3 POV 1

Figure 9 Room 3 POV 2

Figure 10 Room 3 POV 3

Figure 11 Room 4 POV 1

Figure 12 Room 4 POV 2

Figure 13 Room 4 POV 3

Figure 14 Room 4 POV 4

B L

D G

F

L O

O R

P

A

N

A C

C P

H A

S E

I

B

D G

F

L O

O R

P

A

N

A C

C P

H A

S E

Statement of Need (SON) -B1322 Replace Carpet, Asbestos Abatement with Photos
Beale_1322_1_dimlines
Beale_1322_2_dimlines

File details come from the government source that posted it. Updated .