Attachment 2 Scope of Work.pdf
PDF 168 KB Posted
- Attached to
- Irrigation Pipline Install Federal contract opportunity
- Solicitation number
- 12805B20Q0038
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 ARS-371.pdf | ||
| Attachment 1 Wage Determination MT20200057.pdf | ||
| Attachment 6 Project Map.pdf | ||
| Attachment 5 FAR Deviation Accelerated Payments to Small Business.pdf | ||
| Attachment 4 ARS-372.pdf | ||
| Solicitation 12805B20Q0038.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Project: Field 7 Irrigation Pipeline
GENERAL INFORMATION
1.0 Scope of Work: Replace a section of open irrigation ditch with 3500 feet of buried pipeline (21-inch diameter) to improve efficiency of water delivery, reduce water loss and reduce maintenance.
2.0 Background: A section of open irrigation ditch is not conveying water well, has four aged intake/discharge structures, four direction changes (two are 90-degree turns) and is losing water to seepage. Changing to buried pipe will cut intake/discharge and number of turns by half and eliminate seepage and ditch maintenance. The pipeline will be 4% shorter than existing ditch and readily tied in with any future replacement of in-line open ditch with pipeline. The line will go through existing easements with the railroad and utilities.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
• Install new intake structure with trash rack, over-sized culvert, and new head wall at new pipe intake
• Install 3500 feet of 21-inch PIP 80 PSI pipeline buried to 30-inch minimum cover
• 21" gasketed elbow with concrete thrust block
• 21x12-inch tee with 140x12-foot spur line and 12-inch alfalfa valve riser and hood in corner of flood field
• 21x4-inch pump-out riser with saddle
• Discharge structure with 21-inch head gate to throttle discharge flow, and rip rap
• Labor to install pipe, modify ditches, accommodate railroad and utility crossings through rights of way, remove trees and install casing spacers
4.0 Government Furnished: Government is responsible for permitting and right-of-way fees
5.0 Deliverables / Schedule: Fully functional and completed pipeline and ditch work to allow irrigation of all fields.
6.0 Travel: None
7.0 Contractor’s Key Personnel: Experience with engineering and installation of agricultural-scale open-ditch and pipeline irrigation systems.
8.0 Security Requirements: Site access can be accommodated without special requirements
9.0 Data Rights: None
10.0 Section 508 – Electronic and Information Technology Standards: No IT acquired