Attachment 2 Scope of Work.pdf

PDF 168 KB Posted

Attached to
Irrigation Pipline Install Federal contract opportunity
Solicitation number
12805B20Q0038
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

View the file

Other files for this federal contract opportunity

Other files attached to Irrigation Pipline Install, newest first.
File Type Posted
Attachment 3 ARS-371.pdf PDF
Attachment 1 Wage Determination MT20200057.pdf PDF
Attachment 6 Project Map.pdf PDF
Attachment 5 FAR Deviation Accelerated Payments to Small Business.pdf PDF
Attachment 4 ARS-372.pdf PDF
Solicitation 12805B20Q0038.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Project: Field 7 Irrigation Pipeline

GENERAL INFORMATION

1.0 Scope of Work: Replace a section of open irrigation ditch with 3500 feet of buried pipeline (21-inch diameter) to improve efficiency of water delivery, reduce water loss and reduce maintenance.

2.0 Background: A section of open irrigation ditch is not conveying water well, has four aged intake/discharge structures, four direction changes (two are 90-degree turns) and is losing water to seepage. Changing to buried pipe will cut intake/discharge and number of turns by half and eliminate seepage and ditch maintenance. The pipeline will be 4% shorter than existing ditch and readily tied in with any future replacement of in-line open ditch with pipeline. The line will go through existing easements with the railroad and utilities.

CONTRACTOR REQUIREMENTS

3.0 Technical Requirements/Tasks:

• Install new intake structure with trash rack, over-sized culvert, and new head wall at new pipe intake

• Install 3500 feet of 21-inch PIP 80 PSI pipeline buried to 30-inch minimum cover

• 21" gasketed elbow with concrete thrust block

• 21x12-inch tee with 140x12-foot spur line and 12-inch alfalfa valve riser and hood in corner of flood field

• 21x4-inch pump-out riser with saddle

• Discharge structure with 21-inch head gate to throttle discharge flow, and rip rap

• Labor to install pipe, modify ditches, accommodate railroad and utility crossings through rights of way, remove trees and install casing spacers

4.0 Government Furnished: Government is responsible for permitting and right-of-way fees

5.0 Deliverables / Schedule: Fully functional and completed pipeline and ditch work to allow irrigation of all fields.

6.0 Travel: None

7.0 Contractor’s Key Personnel: Experience with engineering and installation of agricultural-scale open-ditch and pipeline irrigation systems.

8.0 Security Requirements: Site access can be accommodated without special requirements

9.0 Data Rights: None

10.0 Section 508 – Electronic and Information Technology Standards: No IT acquired