Attachment 2 Scope of Work Building 5 Roof Repair.pdf
PDF 236 KB Posted
- Attached to
- Roof Repair Bldg 5
- Solicitation number
- 12805B20Q0212
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation 12805B20Q0212.pdf | ||
| Attachment 4 ARS-372.pdf | ||
| Attachment 3 ARS-371.pdf | ||
| Attachment 1 Wage Determination KS20200056.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA-ARS Center for Grain and Animal Health Research Manhattan, Kansas
Building #5’s Roof Repair
Crimping the Roof Seams and repairing leaks on Building #5’s Roof 543000B005
Project:
Crimping the seams and resealing the steel ridges of building #5’s roof The roof size is approximately 5,000 SQ.FT.
GENERAL INFORMATION
1.0 Background and Purpose:
The roof was replaced in 2011 and was never fully completed the roof panels were installed but they were never crimped properly at the seams.
2.0 Definitions:
None
CONTRACTOR REQUIREMENTS
3.0 Technical Requirementsfor Removal Tasks:
1. The contractor will roll all the seams with a crimping tool to ensure the seams are interlocked
2. The contractor will ensure all panel fasteners are correctly installed and properly placed.
3. The roofer will ensure that all panel connections are properly secured to the panels.
4. The roofer will inspect all punctures and cut out openings in the panel are properly jointed with correct fasteners installed, and sealant applied to ensure a leak-proof installation.
5. If any panel seams openings or punctures or curbs that require sealant, the roofer will.
select the correct type of sealant apply the right amount and position the sealant in the correct location.
6. All roof jacks will be inspected for serviceability and replaced and resealed, as necessary.
7. All damaged wet missing or loose inner roof insulation panels will be refastened or replaced according to their serviceability.
4.0 Deliverable / Schedule:
1. Period of Performance is sixty (60) days after receipt of the awarded contract order. All designs, drawings, blueprints, or schematics if developed will be presented to the government for approval
2. The contractor must deliver the final deliverable one week 5 days from date of receipt.
a. All materials and equipment will be cleaned up and put away at the end of each workday.
b. The finished roof will be tested for its water shedding abilities and leaks
c. . All “hard copy” deliverables will be submitted on recycled content paper and printed double-sided.
5.0 Reporting Requirements: : The contractor is required to provide written progress reports at 25%, ,and 75%, and a final report upon the completion of the contract The original and 4 copies are required. The progress report shall cover all work completed during the specified period and shall present the work to be accomplished during the subsequent period.
This report shall also identify any problems that arose and a statement explaining how the problem was resolved. This report shall also identify any problems that have arisen but have not been completely resolved and provide an explanation.
Key Deliverables Item No.
Deliverable
Objective
Due
1 Proposed Project Plan
Defining the responsibilities, timeline, risks, and milestones of contract objectives.
No later than five
(5) business days after contract award
2 Weekly Status Report
Report progress documenting tasks & issues weekly.
Weekly, every Friday, by 3:00 pm (EDST) unless until the contract expires
5.0 Government Furnished: Operations and Storage Areas: water, gas, and electricity are available on the site.
6.0 Travel: Travel and reasonable accommodations will be arranged by the contractor’s and any pricing of expenses will be included in the bidding of the contract. Their will be no additional cost for travel or lodging to the Government after the contract has been awarded.
7.0 Contractor’s Key Personnel: Contractors key positions and personal will be determined at first onsite meeting
8.0 Accident Prevention Plan/Site specific Plan
1. Contractor shall submit a "site specific" Safety Plan to the Contracting Officer that describes how the contractor is to comply with all applicable OSHA standards and NFPA codes pertaining to construction work to include, but not limited to:
General Safety and Health Provisions, Occupational Health and Environmental Controls, Personal Protective and Life Saving Equipment, Hand and Power Tools, Welding and Cutting, Electrical, Scaffolds, Fall Protection, Excavations, Demolition, Stairways and Ladders, Toxic and Hazardous Substances, Confined Space Entry, Lockout/Tagout, Respiratory Protection, Hearing Protection. Safety
Plan shall identify Contractor and sub-contractor employees who are authorized/qualified to perform electrical work. No work shall proceed until written approval of the Safety Plan by the Contracting Officer. Safety Plan shall describe how the Contractor and/or sub-contractors are to secure equipment, supplies, tools, and chemical products. Contractor and/or sub-contractor equipment, supplies, tools, and chemical products are always to be under the control of the Contractor. Equipment, supplies, tools, and chemical products found not to be under the control of the Contractor or sub-contractor may be confiscated and delivered to the Contracting Officer.
9.0 Security and COVID 19 Requirements:
1. Request copy of relevant safety plans.
2. Contractor will be required to hold at least weekly safety meetings.
3. Contractor and his employees will be required to follow all requirements of 29
CFR 1926 OSHA Standards for the Construction Industry.
4. All relevant PPE as dictated by the hazards present must be worn by the contractor and all employees working on the job site.
5. Location Monitor will walk the site with an eye to safety.
6. Possible Hazards of this Contract are: Loading overhead lifting working in, around heavy equipment hauling excess materials, and removing rubbish and debris.
7. All workers will abide with CDC and USDA’s guidelines for protecting yourself and others in a working environment.
a. Avoid close contact with others follow the 6ft distancing rules as much as possible.
b. Cover your mouth and nose with a cloth face covering in common areas and when working in close contact with others
c. Wash your hands often; when in common areas, using the rest rooms, before and after eating, blowing you nose coughing or sneezing
d. Clean and disinfect common usage items and areas at the end of every day. This includes tables, doorknobs, light switches, countertops, handles, desks, phones, keyboards, toilets, faucets, and sinks.
e. Monitor your health Watch for fevers, coughs, shortness of breath, or other symptoms of COVID-19. Report any health issues immediately.
f. The Contractors will provide their own bathrooms and wash facilities.
All contractors will report to the front office and will be screened for illness and citizenship or current work visa. They will be issued a contractor’s identification card once proper credentials have been validated
1.0 Performance Requirement Measures: Random inspections and notifying the Contractor of any noted deficiencies. This will not relieve the Contractor from requirements of the Contract.
Performance Objective
Required Task or Deliverable
Performance Standard
Method of Surveillance
Positive/Negative Incentive % for NOT meeting the Task
The roof will To ensure the The roof is is The prime Contractors awarded have good water shedding capabilities and no water leaks.
panel assemblies are secure. All seams are properly crimped and no leaks present. That the roof sheds water appropriately and it protects the shelter from the environment.
security to the structure and will withstand the worst case situations involving the wind and weather, seismic activity, thermal effects, and roof loading onsite contractor and the location monitor will do an on-site inspection for function and craftsmanship we will check specific fastening and panel fitment for which they were designed by the manufacturers recommendations for the proper installation agreement could be terminated early and any future agreements could be terminated.
The contractor will be given two weeks after all work is completed to correct any discrepancies.
6.0 Travel: Travel and reasonable accommodations will be arranged by the contractor’s and any pricing of expenses will be included in the bidding of the contract. Their will be no additional cost for travel or lodging to the Government after the con...
File details come from the government source that posted it. Updated .