Solicitation No. 70Z08521RP4500600 Request for Proposal Dockside Repairs of CGC BERTHOLF
ATTACHMENT 2 – SCHEDULE OF ITEMS – PRICES
B.1 – PHASE 1 – 02 NOVEMBER 2020 through 4 December 2020
CLIN 0001 – PHASE 1 DEFINITE ITEMS - These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
| Item No. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| D-01 |
| Tanks (MP Fuel Service), Clean and Inspect |
| 1 |
| JOB |
| $ |
| $ |
| D-02 |
| High Purity Water Tanks, Clean and Inspect |
| 1 |
| JOB |
| $ |
| $ |
| D-06 |
| Steering System Hydraulic Power Unit (HPU), Inspect and Service |
| 1 |
| JOB |
| $ |
| $ |
| D-07 |
| Perform Forward and Aft Captans, Level 1 Overhaul |
| 1 |
| JOB |
| $ |
| $ |
| D-08 |
| Main Propulsion and Generator Exhaust, Install and Repair |
| 1 |
| JOB |
| $ |
| $ |
| D-09 |
| Deck Covering (Polymeric) Repair and Seal |
| 1 |
| JOB |
| $ |
| $ |
| D-10 |
| Deck Covering (Polymeric) Renew |
| 1 |
| JOB |
| $ |
| $ |
| D-11 |
| Ventilation Duct Insulation, Renew |
| 1 |
| JOB |
| $ |
| $ |
| D-12 |
| Tank Sounding Tube, Renew |
| 1 |
| JOB |
| $ |
| $ |
| D-13 |
| HVAC System (Cleaning Gear Locker & Protective Clothing Storeroom), Modify |
| 1 |
| JOB |
| $ |
| $ |
| D-14 |
| Intake Ventilation System, Modify |
| 1 |
| JOB |
| $ |
| $ |
| D-15 |
| Sewage Piping, Clean and Flush |
| 1 |
| JOB |
| $ |
| $ |
| D-16 |
| Sewage Piping, Renew |
| 1 |
| JOB |
| $ |
| $ |
| D-18 |
| Temporary Services – Provide – Home Pier |
| 1 |
| JOB |
| $ |
| $ |
| TOTAL AMOUNT OF DEFINITE ITEMS FOR PHASE 1 |
| $ |
CLIN 0002 – PHASE 1 OPTIONAL ITEMS - Optional items may be awarded if inspection reports reveal the necessity for activation, or if funds are made available, at the price proposed in the Contractor’s proposal and without any other consideration whatsoever. However, after midnight on 11 November 2020, the Contractor shall have the right to refuse to accept the award of such Optional Items.
| Item No. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| O-03 |
| Main Propulsion Diesel Engine, Exhaust Piping, Commercial Cleaning |
| 1 |
| JOB |
| $ |
| $ |
| O-04 |
| Ship Service Diesel Generator, Exhaust Piping, Commercial Cleaning |
| 1 |
| JOB |
| $ |
| $ |
| O-05 |
| Propulsion Gas Turbine, Exhaust Piping, Clean & |
Inspect
| O-17 |
| Sewage Piping Repair |
| O-17(a) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(b) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(c) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(d) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(e) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(f) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(g) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(h) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(i) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-17(j) |
| Sewage Piping Repair |
| 1 |
| JOB |
| $ |
| $ |
| TOTAL AMOUNT OF OPTIONAL ITEMS |
| $ |
| TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS FOR PHASE 1 |
| $ |
CLIN – 0003 – COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (16) entitled “COMPOSITE LABOR HOUR RATE.”
| Labor Hour Rate |
| Estimated Hours |
| Extended Amount |
Composite Labor Hour Rate- Provide the all inclusive mark-up/loading rate for materials and subcontractors: ___%. This rate will be incorporated into the contract and used on change requests.
| $________/HR |
| 1,345 hours |
| $____________ |
*NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.
TOTAL EVALUATED AMOUNT FOR PHASE 1 $________________
B.2 – PHASE 2 – 22 March 2021 THROUGH 23 APRIL 2021
CLIN 0004 – PHASE 2 DEFINITE ITEMS - These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
| Item No. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| D-01 |
| Circuit Breakers (Draw Out), Inspect and Test |
| 1 |
| JOB |
| $ |
| $ |
| D-02 |
| Perform Forward Aft Capstan, Level 1 Overhaul |
| 1 |
| JOB |
| $ |
| $ |
| D-03 |
| Talon Grid, Inspect and Test |
| 1 |
| JOB |
| $ |
| $ |
| D-04 |
| Rudder Stock Grounding Cable, Install |
| 1 |
| JOB |
| $ |
| $ |
| D-05 |
| Deck Covering (Polymeric), Repair and Seal |
| 1 |
| JOB |
| $ |
| $ |
| D-06 |
| Piping & Valve Insulation, Renew |
| 1 |
| JOB |
| $ |
| $ |
| D-07 |
| Surfaces, Preserve |
| 1 |
| JOB |
| $ |
| $ |
| D-08 |
| Tenting Provide |
| 1 |
| JOB |
| $ |
| $ |
| D-09 |
| Deck Covering (Slip Resistant), Flight Deck, Renew |
| 1 |
| JOB |
| $ |
| $ |
| D-10 |
| Deck Covering (Slip Resistant), Renew |
| 1 |
| JOB |
| $ |
| $ |
| D-12 |
| Temporary Services, Provide – Home Pier |
| 1 |
| JOB |
| $ |
| $ |
| TOTAL AMOUNT OF DEFINITE ITEMS FOR PHASE 2 |
| $ |
CLIN 0005 – PHASE 2 OPTIONAL ITEMS - Optional items may be awarded if inspection reports reveal the necessity for activation, or if funds are made available, at the price proposed in the Contractor’s proposal and without any other consideration whatsoever. However, after midnight on 31 March 2021, the Contractor shall have the right to refuse to accept the award of such Optional Items.
| Item No. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| O-11 |
| Sewage System Piping, Repair |
| O-11(a) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(b) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(c) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(d) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(e) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(f) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(g) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(h) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(i) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| O-11(j) |
| Sewage System Piping, Repair |
| 1 |
| JOB |
| $ |
| $ |
| TOTAL AMOUNT OF OPTIONAL ITEMS FOR PHASE 2 |
| $ |
| TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS FOR PHASE 2 |
| $ |
CLIN – 0006 – COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (16) entitled “COMPOSITE LABOR HOUR RATE.”
| Labor Hour Rate |
| Estimated Hours |
| Extended Amount |
Composite Labor Hour Rate- Provide the all inclusive mark-up/loading rate for materials and subcontractors: ___%. This rate will be incorporated into the contract and used on change requests.
| $________/HR |
| 1000 hours |
| $____________ |
*NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required
TOTAL EVALUATED AMOUNT OF PHASE 2 $___________________
TOTAL EVALUATED AMOUNT OF PHASE 1 $___________________
TOTAL EVALUATED AMOUNT OF PHASE 1 & PHASE 2 $___________________