Attachment 2 Schedule of Items Ouray Pumping.pdf

PDF 126 KB Posted

Attached to
GMUG Ouray RD Vault Toilet Pumping
Solicitation number
1240LP26Q0070
Issued by

About this file

This is a pricing schedule template for the Ouray Ranger District Vault Pumping project. The schedule requires vendors to provide unit pricing for septic vault pumping services at six locations within the Ouray Ranger District. The services include pumping operations at Blue Lakes Trailhead (2 vaults, 1 pump cycle), Thistledown Campground (2 vaults, 3 pump cycles), Angel Creek Campground (2 vaults, 2 pump cycles), Middle Fork Upper (1 vault, 2 pump cycles), Middle Fork Lower (2 vaults, 2 pump cycles), and Columbine Pass Staging (2 vaults, 2 pump cycles), totaling 11 vaults across six service locations with 12 total pump cycles required.

Vendors must complete this template by entering their company name, Unique Entity Identifier, unit price for each pump operation, and calculated total prices for each line item. The template provides blank fields for the "Amount Per Pump" unit cost and "Total Price" for each service location, with a final row for the overall contract total. This is a blank template requiring vendor completion and submission as part of their proposal response.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 – Schedule of Itmes/Price Schedule

Project Description: Ouray Ranger District Vault Pumping

Vendor Name: Unique Entity Identifier:

Item

Service

Times to Pump

Amount Per Pump

Total Price

Pumping at Blue Lakes Trailhead 2 Vaults

Pumping at Thistledown Campground

Angel Creek Campground

Middle Fork Upper 1 Vault

0005 Middle Fork Lower

2 $ $

0006 Columbine Pass Staging

Total

File details come from the government source that posted it. Updated .