The file's text, extracted by GovTribe without its formatting.
Instructions
| Instructions for Services | |
| Labor Categories | Enter ALL proposed labor categories |
| Labor Rates | Use loaded Labor rates which include the percentage of overhead costs that are allocable to the contract. |
| Travel | Use an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips. |
| Cumulative Total | Delete total from any/all unused option periods after completing chart |
| Period Of Performance | If your period of performance for the Base and/or Option Period(s) is less than 12 Months - reflect actual month total in column header |
| Instructions for Supplies | |
| Columns | Complete all columns. If there is no serial/product number enter "N/A" |
| Item(s) | Add/delete rows as applicable (ensure item subtotal includes amounts from added rows). Identify and group items by Brand |
| Options | Complete as applicable. If the option 3 and 4 page does not apply to your requirement, do not submit with your final IGCE. |
| Other Direct Costs (ODCs) | Itemize all applicable ODCs (such as installation or special equipment) Not all requirements will have ODCs. |
| Travel | Use an overall estimated cost for travel. Combine elements as air fare, per diem, and local travel multiplied by the # of trips. |
Services
| Schedule of Items SOL: | | |
| Contractor Name: | Project Title: | Hiawatha National Forest/ West Zone/ FY22 Mowing |
| Quote Date: | Project Manager: | Brenda Rebitzke |
| | Base Period: 6 Months (MAY01-OCT31) | | | Option 1: 6 Months (MAY01-OCT31) | | | Option 2: 6 Months (MAY01-OCT31) | | | Option 3: 6 Months (MAY01-OCT31) | | | Option 4: 6 Months (MAY01-OCT31) | | |
| Item Number | Labor Category | Each | Rate | Total | Each | Rate | Total | Each | Rate | Total | Each | Rate | Total | Each | Rate | Total |
| 01 | SHELTER BAY HIAWATHA PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 02 | GRAND ISLAND LANDING -POWELL POINT - INFO. SITE | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 03 | SLAPNECK M94 PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 04 | BAY DE NOC GRAND NORTH TRAILHEAD | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 05 | FOREST MONUMENT INTERPRETIVE SITE | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 06 | VALLEY SPUR SKI & BIKE TRAILHEAD | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 07 | NORTH H13 PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 08 | SHINGLETON M28 PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 09 | SHINGLETON M94 PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 10 | COUNCIL LAKE CAMP SITE 4 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 11 | MCKEEVER HILLS SKI TRAILHEAD | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 12 | BAY DE NOC GRAND MIDDLE TRAILHEAD | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 13 | COOKSON LAKE CAMP SITE 5 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 14 | PINE MARTEN RUN MIDDLE TRAILHEAD | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 15 | JACKPINE M94 PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 16 | THUNDER LAKE ROAD PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 17 | BAY DE NOC GRAND ISLAND SOUTH TRAILHEAD | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 18 | US2 NEAR 513 PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 19 | US2 E OF GARDEN CORNERS PORTAL SIGN | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 20 | OGONTZ BOAT LAUNCH | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 21 | PENINSULA POINT PICNIC AREA & INTERPRETIVE SITE | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 22 | MOCCASIN LAKE ROADSIDE REST | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| 23 | MUNISING OFFICE AND WORKCENTER | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 | 8 | | $0.00 |
| 24 | RAPID RIVER OFFICE AND WORKCENTER | 10 | | $0.00 | 10 | | $0.00 | 10 | | $0.00 | 10 | | $0.00 | 10 | | $0.00 |
| 25 | MANISTIQUE OFFICE AND WORKCENTER | 5 | | $0.00 | 5 | | $0.00 | 5 | | $0.00 | 5 | | $0.00 | 5 | | $0.00 |
| 26 | SPRING DEBRIS REMOVAL, MUNISING OFFICE AND WORKCENTER | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 |
| 27 | SPRING DEBRIS REMOVAL, RAPID RIVER OFFICE AND WORKCENTER | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 |
| 28 | SPRING DEBRIS REMOVAL, MANISTIQUE OFFICE AND WORKCENTER | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 | 1 | | $0.00 |
| 29 | ON CALL, AS NEEDED | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 | 4 | | $0.00 |
| | $0.00 | | $0.00 | | $0.00 | | $0.00 | | $0.00 |
| Labor Total | 162 | $0.00 | 162 | $0.00 | 162 | $0.00 | 162 | $0.00 | 162 | $0.00 |
| Other Direct Costs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| (ODCs) | | | | | |
Travel $0.00 $0.00 $0.00 $0.00 $0.00
| ODC/Travel Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Period Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cumulative TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |