Attachment 2 Schedule of Items.pdf
PDF 113 KB Posted
- Attached to
- GAOA Treasure Lake Vault Toilet
- Solicitation number
- 127EAX26Q0085
About this file
This is a pricing template for a federal construction contract related to the installation of a vault toilet facility at Treasure Lake. The solicitation is titled "0415 GAOA CONST 4FG TETON CANYON CORR ACCSS DEFR MTNC TREASURE LAKE VAULT TOILET" and requires offerors to provide pricing on all line items to be considered responsive.
The schedule of items consists of four work packages: (1) Mobilization/Transportation to Site (Lump Sum); (2) Precast Concrete Vault Restroom Building (Each); (3) Owl Guard (Each); and (4) Earthwork (Lump Sum). All quantities are listed as in-place quantities with no shrinkage or swell factors applied, and contractors are required to verify quantities independently. Payment for bond premiums must be in accordance with FAR 52.232-5, and such payments under fixed-price construction contracts shall be included under the Mobilization line item rather than added to the contract price. The template requires the offeror to supply contact information including name, phone, address, email, and UEI SAM number.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
1. Offerors must submit pricing on all items to be considered responsive. Must quote on all items.
2. Payment for bond premiums in accordance with FAR 52.232-5. Payments under Fixed-Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.
3. Quantities are provided for information only and are in-place quantities. No shrinkage or swell factors have been applied. Contractor shall verify quantities.
Price Quotation Furnished By:
Name: ______________________________
Phone: ______________________________
Address:_____________________________
E-mail:______________________________
UEI SAM#: __________________________
SCHEDULEOF ITEMS
0415 GAOA CONST 4FG TETON CANYON CORR ACCSS DEFR MTNC TREASURE LAKE VAULT TOILET
ITEM
NUMBER
DESCRIPTION
METHOD
OF MEAS
UNIT
QTY
PRICE
TOTAL
011900 MOBILIZATION/TRANSPORTATION TO
SITE
LSQ LS 1
133402-1 PRECAST CONCRETE VAULT RESTROOM
BUILDING
AQ EA 1
133402-2 OWL GUARD AQ EA 1
312000 EARTHWORK LSQ LS 1
Total
File details come from the government source that posted it. Updated .