This is a Questions and Answers document dated September 25, 2026, for federal contract opportunity 127EAX26Q0085 regarding the installation of a precast concrete vault toilet at Treasure Lake for the General Services Administration (GAOA).
The document clarifies key project parameters and contractor responsibilities. A pre-quote site visit is scheduled for September 29, 2026, at 10:00 a.m. at Treasure Lake Trailhead on Teton Canyon Road (coordinates: 43.756236/-110.947680). The access route is suitable for delivery of fully assembled precast concrete vault restrooms via tractor-trailer and crane-equipped vehicle, though the road width is approximately 20 feet in a high snow area with delivery likely impossible after November 1. Field assembly of the precast system is permitted, with the vault and superstructure typically delivered as separate pieces. CXT Incorporated and Missoula Concrete Construction are identified as the basis of design, though equivalent products from other PCI-certified plants will be reviewed for acceptability. The Government provides staging areas near the project site for equipment, excavated material, and aggregate. Excavated material unsuitable for reuse must be hauled to a disposal area on Government property as designated by the Contracting Officer per Specification 02400. Building permits are not required for federal projects; however, contractors are responsible for obtaining all permits required for transportation and oversize hauling prior to entering federal property.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAOA Treasure Lake Vault Toilet
127EAX26Q0085
Questions and Answers
25 September 2026
1. Will the Government conduct or authorize a pre-quote site visit? If so, please provide the available date/time and any registration requirements
Answer: Yes. September 29, 2026 at 1000. Location will be Treasure Lake Trailhead on Teton Canyon Road (FS009). Lat 43.756236/Lon -110.947680
2. Please confirm whether the access route to the project site is suitable for delivery of a fully assembled precast concrete vault restroom using a tractor-trailer and crane-equipped delivery vehicle.
Answer: Yes
3. Are there any known road width, turning-radius, bridge/load, overhead-clearance, seasonal, or other access restrictions between the public roadway and the installation location that contractors should account for when developing transportation and mobilization pricing?
Answer: Road width is approximately 20’. High snow area. Delivery likely not possible after Nov 1.
4. Please confirm whether the precast restroom is expected to be delivered and installed as a fully assembled structure or whether field assembly of an approved precast system is permissible.
Answer: Field assembly permitted. Typically vault and superstructure are separate pieces.
5. Please confirm whether CXT Incorporated and Missoula Concrete Construction are provided as examples only and whether an equivalent vault restroom manufactured by another PCI-certified plant will be considered acceptable provided all specification and design requirements are met.
Answer: CXT/Missoula are basis of design. Or equal product will be reviewed for acceptability.
6. Are there any Government-furnished staging areas available near the project site for equipment, excavated material, aggregate, or temporary placement of the precast structure during installation?
Answer: Yes
7. Please confirm whether all excavated material unsuitable for reuse must be hauled completely off National Forest property and, if so, whether the Government is aware of an approved disposal location in the vicinity.
Answer: No. Reference Specification 02400 “All waste material above shall be hauled to the disposal area on Government property as designated by the Contracting Officer”
8. Please confirm whether the contractor is responsible for obtaining any permits associated with transportation/oversize hauling, excavation, or installation, or whether there are any Government-provided permits/authorizations applicable to work occurring on Forest Service property.
Answer: Building permits are not required for federal projects. All permitting required for transportation prior to entering federal property are the responsibility of the contractor.