Attachment 2 -Schedule of Items.pdf

PDF 109 KB Posted

Attached to
Buffalo Gap Campground water line repairs
Solicitation number
1240LU26Q0071
Issued by

About this file

This document is a Schedule of Items for a federal construction contract. The Medora Ranger District/Dakota Prairie Grasslands is soliciting work for Buffalo Gap Campground Water Valve Repair under Workplan Acquisition Plan/Requisition No. 723722/1167009. The contract encompasses two line items, both priced as lump sum (LS): Item 0001 covers mobilization, and Item 0002 covers furnishing and installing curb stop valves, which includes three 1-inch ball valves and three valve boxes extensions on a 6-foot bury depth. The anticipated delivery date for completion of this construction work is June 15, 2026, with a performance period running from May 15, 2026 through June 15, 2026. The award is anticipated to be structured as a firm fixed price contract. No pricing information is provided in this schedule document, and no specific set-asides, contract vehicles, or response deadlines are identified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

NUMBER DESCRIPTION PAY

UNIT

EST

QTY Total

0001 MOBILIZATION LS 1

FURNISH & INSTALL CURB STOP VALVES, INCLUDES

3 - 1-IN. BALL VALVES AND 3 VALVE BOXES

EXTENSION , ON A 6 FT. BURY.

LS 1

Total$

LS = Lump Sum Award anticipated to be a firm fixed price contract.

SCHEDULE OF ITEMS

MEDORA RANGER DISTRICT / DAKOTA PRAIRIE GRASSLANDS

BUFFALO GAP CAMPGROUND WATER VALVE REPAIR

WORKPLAN ACQUISITION PLAN/REQUISITION NO: 723722 / 1167009

SCHEDULE OF ITEMS

Period of Performance (Required for Services and A&E) 05/15/2026-06/15/2026

Anticipated Delivery Date (Required for Supply and Construction) 6/15/2026

CONTRACT (NO OPTIONS)

File details come from the government source that posted it. Updated .