ATTACHMENT 2 Schedule of Items.pdf
PDF 337 KB Posted
- Attached to
- Cheoah and Tusquitee Ranger Districts Water Testing and Monitoring at Nantahala National Forest NC
- Solicitation number
- 12444126Q0010
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for the Cheoah and Tusquitee Ranger District Water Sampling and Testing project, covering a base year and four option years from 02/01/2026 to 01/31/2031. The contract involves comprehensive water testing services including annual nitrate testing at five site locations, bacterial (coliform) testing, monthly iron testing at the Cheoah Admin Complex, weekly fecal coliform sampling at Cheoah Pt. Beach and Jackrabbit Beach during specific seasonal periods, and water system chlorination and residual testing at multiple locations including the Cheoah District Office, Work Center, Residences, and Cherokee Lake Recreation Area.
The schedule includes optional items for additional bacterial testing and emergency water system repairs, with the contractor required to submit written estimates for emergency repairs to the Contracting Officer's Representative (COR) and secure approval before proceeding. All parts replaced during emergency repairs will be paid for by the government at the contractor's invoice cost, and the Forest Service reserves the right to furnish any parts needed for repairs. The estimated quantities vary by test type, with 5 annual nitrate tests, 40 bacterial tests, 12 monthly iron tests, 52 weekly fecal coliform tests, and 83 chlorination and residual testing events per year.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM
NUMBER
DESCRIPTION
PAY
UNIT
EST
QTY
Unit Cost Total Cost
0001 Collection of Samples for Testing of Potable Water 0001AA Annual Nitrate Testing for five (5) site locations EACH 5 $ - 0001AB Bacterial (Coliform Testing) per Sample EACH 40 $ -
0001AC
Monthly Iron Testing
• Cheoah Admin Complex
EACH 12 $ -
0002 Swimming Area Water Testing
0002AA
Weekly Sampling & Testing For Fecal Coliform at:
•Cheoah Pt. Beach (April 15 – Oct. 31) •Jackrabbit Beach (May 1-September 30)
EACH 52 $ -
Operation of Water Systems and testing for Chlorine Residual
0003AA
Water System Chlorination and Residual Testing at:
•Cheoah District Office, Work Center, & Residences
(Year-Round) •Cherokee Lake Recreation Area (April 1-October 31)
EACH 83 $ -
*0004 Optional Item (Paid by GPC):
Additional Bacterial (Coliform) per SAMPLE As required by test results Item 0001AB
EACH 1 $ -
*0005 Optional Item (Paid by GPC):
Water System Emergency Repairs After the first hour listed in Item 0001AC
HOUR 1 $ -
*0006 Water System Emergency Repairs (Paid by GPC) Includes first hour per TRIP
HOUR 1 $ -
Total -$
SCHEDULE OF ITEMS
PROJECT TITLE: Cheoah and Tusquitee Ranger District Water Sampling and Testing
Base Year: 02/01/2026 - 01/31/2027
* The Contractor must submit a written estimate for all emergency repairs to the COR and secure approval prior to proceeding. All parts replaced will be paid for by the Government at Contractor’s invoice cost. The Forest Service reserves the right to furnish any parts needed for the repairs.
SCHEDULE OF ITEMS
PROJECT TITLE: Cheoah and Tusquitee Ranger District Water Sampling and Testing
ITEM
NUMBER
DESCRIPTION
PAY
UNIT
EST
QTY
Unit Cost Total Cost
1001 Collection of Samples for Testing of Potable Water
1001AA Annual Nitrate Testing for five (5) site locations EACH 5 $ - 1001AB Bacterial (Coliform Testing) per Sample EACH 40 $ -
1001AC
Monthly Iron Testing
• Cheoah Admin Complex
EACH 12 $ -
1002 Swimming Area Water Testing
1002AA
Weekly Sampling & Testing For Fecal Coliform at:
•Cheoah Pt. Beach (April 15 – Oct. 31) •Jackrabbit Beach (May 1-September 30)
EACH 52 $ -
Operation of Water Systems and testing for Chlorine Residual
1003AA
Water System Chlorination and Residual Testing at:
•Cheoah District Office, Work Center, & Residences
(Year-Round) •Cherokee Lake Recreation Area (April 1-October 31)
EACH 83 $ -
*1004 Optional Item (Paid by GPC):
Additional Bacterial (Coliform) per SAMPLE As required by test results Item 0001AB
EACH 1 $ -
*1005 Optional Item (Paid by GPC):
Water System Emergency Repairs After the first hour listed in Item 0001AC
HOUR 1 $ -
*1006 Water System Emergency Repairs (Paid by GPC) Includes first hour per TRIP
HOUR 1 $ -
Total -$
Option Year 1: 02/01/2027 - 01/31/2028
SCHEDULE OF ITEMS
* The Contractor must submit a written estimate for all emergency repairs to the COR and secure approval prior to proceeding. All parts replaced will be paid for by the Government at Contractor’s invoice cost. The Forest Service reserves the right to furnish any parts needed for the repairs.
ITEM
NUMBER
DESCRIPTION
PAY
UNIT
EST
QTY
Unit Cost Total Cost
2001 Collection of Samples for Testing of Potable Water
2001AA Annual Nitrate Testing for five (5) site locations EACH 5 $ - 2001AB Bacterial (Coliform Testing) per Sample EACH 40 $ -
2001AC
Monthly Iron Testing
• Cheoah Admin Complex
EACH 12 $ -
2002 Swimming Area Water Testing
2002AA
Weekly Sampling & Testing For Fecal Coliform at:
•Cheoah Pt. Beach (April 15 – Oct. 31) •Jackrabbit Beach (May 1-September 30)
EACH 52 $ -
Operation of Water Systems and testing for Chlorine Residual
2003AA
Water System Chlorination and Residual Testing at:
•Cheoah District Office, Work Center, & Residences
(Year-Round) •Cherokee Lake Recreation Area (April 1-October 31)
EACH 83 $ -
*2004 Optional Item (Paid by GPC):
Additional Bacterial (Coliform) per SAMPLE As required by test results Item 0001AB
EACH 1 $ -
*2005 Optional Item (Paid by GPC):
Water System Emergency Repairs After the first hour listed in Item 0001AC
HOUR 1 $ -
*2006 Water System Emergency Repairs (Paid by GPC) Includes first hour per TRIP
HOUR 1 $ -
Total -$
* The Contractor must submit a written estimate for all emergency repairs to the COR and secure approval prior to proceeding. All parts replaced will be paid for by the Government at Contractor’s invoice cost. The Forest Service reserves the right to furnish any parts needed for the repairs.
Option Year 2: 02/01/2028 - 01/31/2029
ITEM
NUMBER
DESCRIPTION
PAY
UNIT
EST
QTY
Unit Cost Total Cost
3001 Collection of Samples for Testing of Potable Water
3001AA Annual Nitrate Testing for five (5) site locations EACH 5 $ - 3001AB Bacterial (Coliform Testing) per Sample EACH 40 $ -
3001AC
Monthly Iron Testing
• Cheoah Admin Complex
EACH 12 $ -
3002 Swimming Area Water Testing
3002AA
Weekly Sampling & Testing For Fecal Coliform at:
•Cheoah Pt. Beach (April 15 – Oct. 31) •Jackrabbit Beach (May 1-September 30)
EACH 52 $ -
Operation of Water Systems and testing for Chlorine Residual
3003AA
Water System Chlorination and Residual Testing at:
•Cheoah District Office, Work Center, & Residences
(Year-Round) •Cherokee Lake Recreation Area (April 1-October 31)
EACH 83 $ -
*3004 Optional Item (Paid by GPC):
Additional Bacterial (Coliform) per SAMPLE As required by test results Item 0001AB
EACH 1 $ -
*3005 Optional Item (Paid by GPC):
Water System Emergency Repairs After the first hour listed in Item 0001AC
HOUR 1 $ -
*3006 Water System Emergency Repairs (Paid by GPC) Includes first hour per TRIP
HOUR 1 $ -
Total -$
* The Contractor must submit a written estimate for all emergency repairs to the COR and secure approval prior to proceeding. All parts replaced will be paid for by the Government at Contractor’s invoice cost. The Forest Service reserves the right to furnish any parts needed for the repairs.
Option Year 3: 02/01/2029 - 01/31/2030
ITEM
NUMBER
DESCRIPTION
PAY
UNIT
EST
QTY
Unit Cost Total Cost
4001 Collection of Samples for Testing of Potable Water
4001AA Annual Nitrate Testing for five (5) site locations EACH 5 $ - 4001AB Bacterial (Coliform Testing) per Sample EACH 40 $ -
4001AC
Monthly Iron Testing
• Cheoah Admin Complex
EACH 12 $ -
4002 Swimming Area Water Testing
4002AA
Weekly Sampling & Testing For Fecal Coliform at:
•Cheoah Pt. Beach (April 15 – Oct. 31) •Jackrabbit Beach (May 1-September 30)
EACH 52 $ -
Operation of Water Systems and testing for Chlorine Residual
4003AA
Water System Chlorination and Residual Testing at:
•Cheoah District Office, Work Center, & Residences
(Year-Round) •Cherokee Lake Recreation Area (April 1-October 31)
EACH 83 $ -
*4004 Optional Item (Paid by GPC):
Additional Bacterial (Coliform) per SAMPLE As required by test results Item 0001AB
EACH 1 $ -
*4005 Optional Item (Paid by GPC):
Water System Emergency Repairs After the first hour listed in Item 0001AC
HOUR 1 $ -
*4006 Water System Emergency Repairs (Paid by GPC) Includes first hour per TRIP
HOUR 1 $ -
Total -$
* The Contractor must submit a written estimate for all emergency repairs to the COR and secure approval prior to proceeding. All parts replaced will be paid for by the Government at Contractor’s invoice cost. The Forest Service reserves the right to furnish any parts needed for the repairs.
Option Year 4: 02/01/2030 - 01/31/2031
File details come from the government source that posted it. Updated .