Attachment 2 Schedule Of Items.docx

DOCX document 17 KB Posted

Attached to
USDA Forest Service NFsNC, Grandfather Ranger District, Caldwell County, NC has a requirement for Boone Fork Stream Enhancement
Solicitation number
12455020R0021
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12455020R0021 Attachment 2 Schedule of Items

Boone Fork Watershed Improvement Project 2020

Description
Measure
Quantity
Unit
Unit Price
Totals

ITEM 1. Boone Fork Watershed Improvement Project 2020

1A. EQUIPMENT & LABOR

Track hoe w/ hydraulic thumb & operator
AQ
110
hours
Mobilization - Trackhoe
LS
2
each
Skid Steer w/ bucket
AQ
8
hours
Mobilization - Skid Steer
LS
1
each

1B. EROSION & SEDIMENT CONTROL

Provide & maintain pump-around (3"trash pump)
LS
1.00
each
Seed all disturbed soil
CQ
2.00
acre
Erosion control COIR-700 matting (6-8' wide)
AQ
150
linear foot

1C. MATERIALS

River stone (Deep Cove AOP bottom)
AQ
20
ton
Gravel (clean, Deep Cove AOP road approaches)
AQ
16
ton
Rip-rap stone (culvert outlets)
AQ
16
ton
Boulders (48'x24'x18')
AQ
45
ton
Woven geotextile fabric for log vanes (6-8' wide)
AQ
240
linear foot
Culvert (24" diameter, galvanized, 40' long, ditch relief)
AQ
3
each
Culvert removal & haul off site
AQ
1
each

Project Costs:

Any work shown on drawings or in specifications that is not included in bid items is incidental to other items.

Payment will be made on actual work (AC) performed, for Lump Sum (LS) or “CQ” designating Contract Quantity.