12455020R0021 Attachment 2 Schedule of Items
Boone Fork Watershed Improvement Project 2020
| Description |
| Measure |
| Quantity |
| Unit |
| Unit Price |
| Totals |
ITEM 1. Boone Fork Watershed Improvement Project 2020
1A. EQUIPMENT & LABOR
| Track hoe w/ hydraulic thumb & operator |
| AQ |
| 110 |
| hours |
| Mobilization - Trackhoe |
| LS |
| 2 |
| each |
| Skid Steer w/ bucket |
| AQ |
| 8 |
| hours |
| Mobilization - Skid Steer |
| LS |
| 1 |
| each |
1B. EROSION & SEDIMENT CONTROL
| Provide & maintain pump-around (3"trash pump) |
| LS |
| 1.00 |
| each |
| Seed all disturbed soil |
| CQ |
| 2.00 |
| acre |
| Erosion control COIR-700 matting (6-8' wide) |
| AQ |
| 150 |
| linear foot |
1C. MATERIALS
| River stone (Deep Cove AOP bottom) |
| AQ |
| 20 |
| ton |
| Gravel (clean, Deep Cove AOP road approaches) |
| AQ |
| 16 |
| ton |
| Rip-rap stone (culvert outlets) |
| AQ |
| 16 |
| ton |
| Boulders (48'x24'x18') |
| AQ |
| 45 |
| ton |
| Woven geotextile fabric for log vanes (6-8' wide) |
| AQ |
| 240 |
| linear foot |
| Culvert (24" diameter, galvanized, 40' long, ditch relief) |
| AQ |
| 3 |
| each |
| Culvert removal & haul off site |
| AQ |
| 1 |
| each |
Project Costs:
Any work shown on drawings or in specifications that is not included in bid items is incidental to other items.
Payment will be made on actual work (AC) performed, for Lump Sum (LS) or “CQ” designating Contract Quantity.