SF 30 12455020R0021 Amendment 3.pdf
PDF 92 KB Posted
- Solicitation number
- 12455020R0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Attachment 4 BooneFork_WatershedImprovement_2020_Specification 05282020.docx | DOCX document | |
| Revised Attachment 2 BooneFork_WatershedImprovement_2020_ScheduleOfItems 05282020.docx | DOCX document | |
| Revised Attachment 3 BooneFork_WatershedImprovement_2020_ProjectDescription 05282020.docx | DOCX document | |
| Pe-Bid Site Visit Sign In sheet.pdf | ||
| Amendment 2 12455020R0021.pdf | ||
| Amendment 1 12455020R0021 Boone Fork Stream Enhancement.pdf | ||
| Attachment 3 Project Description.docx | DOCX document | |
| Attachment 2 Schedule Of Items.docx | DOCX document | |
| SF 1442 Continued.docx | DOCX document | |
| Attachment 4 Specifications.docx | DOCX document | |
| SF 1442 Boone Fork Stream Enhancement.pdf | ||
| Attachment 5 Experience Questionaire.docx | DOCX document | |
| Attachment 1 Wage Determination.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12455020R0021 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHEVILLE NC 28801-9999
160A ZILLICOA ST
NATIONAL FOREST IN NORTH CAROLINA
USDA FS
05/28/20200003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/05/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Boone Fork Stream Enhancement amendment to publish:
Pre-bid Site Visit sign in sheet
Revised Attachment 2 SOI
Revised Attachment 3 Project Description
Revised Attachment 4 Specifications
These revised Attachments address concern brought up during pre-bid meeting:
1. What are the Specifications on the Ditch Relief Culverts?
2. The skid steer will not do the job as described as well as an all-terrain dump truck.
Consider replacing skid steer with an AT Dump Truck.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CYNTHIA L. ROBERTS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 828-257-4228 clroberts@fs.fed.us
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12455020R0021/0003
Proposal due date is June 15,2020 1:00pm via e-mail to Cynthia.l.roberts@usda.gov