This document is a set of civil engineering design drawings and specifications for the U.S. Coast Guard Station Portsmouth Harbor in New Castle, New Hampshire, addressing waterfront repair and restoration work identified as Phase 2.
The project encompasses four primary repair areas: (1) bulkheads and quay walls requiring chinking, repointing, void repair, and concrete closure walls at the north and south locations; (2) rip-rap revetment restoration involving stone placement, bedding layers, and geotextile installation across approximately 380 cubic yards; (3) wave screen/floating dock repairs including pile recoating with coal-tar epoxy, cleat replacement, and galvanic anode installation; and (4) a new timber floating dock replacement with expanded polystyrene float modules designed for 40 PSF uniform live load and 8-inch minimum freeboard. The base bid scope totals approximately 14 individual line items with quantities ranging from 8 each (pile coatings and anodes) to 700 cubic yards (interim stone berm). Two bid options are available: Option 1 provides 150 cubic yards of additional revetment extension at the west end of the quay wall (RPUID 816511), and Option 2 offers installation of eight HDPE pile sleeves for protection (RPUID 50109). Work restrictions limit loading within 15 feet of the existing north quay wall to 100 PSF uniform live load, with vehicles and cranes prohibited. The project specifications reference 2018 International Building Code, AISC Steel Construction Manual 15th Edition, 2024 American Wood Council NDS, Unified Facilities Criteria 4-152-01 and 4-152-07, and OSHA 29 CFR 1910. Design by Lloyd-Collins JV (Bellaire, Texas) and USCG Civil Engineering Unit Providence; drawings issued for bidding November 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
GE
NE
RA
L
CO
VE
R
SH
EE
T
BULKHEADS, RIP-RAP
WAVE SCREEN, AND
FLOATING DOCK
G-001
P1
P1
2G
1.
dw g
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
MICHAEL P. CAROSOTTO, P.E.
MICHAEL P. CAROSOTTO, P.E.
DAVID C. DILL
LL
OY
D
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
U.S. COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
TECHNICAL DIRECTOR
BRANCH CHIEF
APPROVING OFFICIAL DATE
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
U.S. COAST GUARD
CIVIL ENGINEERING UNIT
PROVIDENCE
VICINITY MAP
SCALE: NTS
LOCATION MAP
SCALE: NTS
CG STA PORTSMOUTH HARBOR
NEW CASTLE, ROCKINGHAM COUNTY, NEW HAMPSHIRE
16654142 REPAIR WATERFRONT - PHASE 2
BULKHEADS, RIP-RAP, WAVE SCREEN,
AND FLOATING DOCK - BOATHOUSE
EXCEL
LE
N C E
I N E N G I N E E R I N G
U . S . C O A S T G U
A R
D
CIVIL
ENGINEERING UNIT
PROVIDENCE
SUMMARY OF WORK (BASE BID)
RPUID ITEM QUANTITY (APPROX.)
816511 CHINK AND REPOINT NORTH QUAY WALL 200 LF
816511 PROVIDE CLOSURE WALL AT EAST END OF NORTH QUAY WALL 20 LF
816511, 9383 REPAIR CONCRETE DUMPSTER SLAB AND PAVEMENT 620 SF
816511, 810801 REPLACE NORTH QUAY WALL FENCE 220 LF
816511 REPAIR VOIDS IN SOUTH QUAY WALL 10 CY
816511 REPAIR SINKHOLE BEHIND SOUTH QUAY WALL 60 CY
816511 REPAIR EAST END OF SOUTH QUAY WALL WITH INTERIM STONE BERM 700 CY
857029 RESTORE RIP-RAP REVETMENT 380 CY
857029, 9383 REPAIR PAVING IN WEST PARKING LOT 560 SF
857029, 810801 REPLACE REVETMENT FENCE 180 LF
50109 RECOAT WAVE SCREEN PILES 8 EA
50109 REPLACE WAVE SCREEN CLEAT 1 EA
50109 INSTALL ANODES ON WAVE SCREEN PILES 8 EA
848538 INSTALL TIMBER FLOAT 550 SF
THIS TABLE IS NOT AN EXHAUSTIVE LIST OF ALL SCOPE ITEMS, ESPECIALLY INCIDENTAL WORK, AND IS INTENDED TO BE A GENERAL SUMMARY ONLY. REFER TO THE DRAWINGS CONTAINED HEREIN AND THE PROJECT SPECIFICATIONS
FOR ADDITIONAL INFORMATION AND DETAILS ON THE FULL PROJECT SCOPE OF WORK.
SUMMARY OF WORK (BID OPTIONS)
RPUID ITEM QUANTITY
(APPROX.)
816511 BID OPTION 1: PROVIDE REVETMENT EXTENSION AT
WEST END OF QUAY WALL 150 CY
50109 BID OPTION 2: INSTALL HDPE PILE SLEEVES 8 EA
THIS TABLE IS NOT AN EXHAUSTIVE LIST OF ALL SCOPE ITEMS, ESPECIALLY INCIDENTAL WORK, AND IS INTENDED TO BE A GENERAL SUMMARY ONLY. REFER TO THE DRAWINGS CONTAINED
HEREIN AND THE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION AND DETAILS ON
THE FULL PROJECT SCOPE OF WORK.
DRAWING INDEX
SHEET ID SHEET # SHEET TITLE
G-001 1 COVER SHEET
G-002 2 ABBREVIATIONS
G-003 3 GENERAL NOTES
G-101 4 WORK PLAN
G-901 5 EXISTING CONDITIONS PHOTOS
C-001 6 EXISTING CONDITIONS NOTES
C-101 7 EXISTING SITE PLAN
C-102 8 QUAY WALL REPAIR PLAN
C-301 9 NORTH RIP-RAP REPAIR SECTIONS
C-302 10 QUAY WALL REPAIR SECTIONS
C-501 11 SOUTH QUAY WALL REPAIR DETAILS
C-502 12 MISCELLANEOUS SITE REPAIR DETAILS - 1
C-503 13 MISCELLANEOUS SITE REPAIR DETAILS - 2
S-101 14 WAVE SCREEN REPAIR PLAN
S-102 15 FLOATING DOCK REPLACEMENT
S-501 16 WAVE SCREEN DETAILS
PROJECT INFORMATION
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
GE
NE
RA
L
AB
BR
EV
IA
TI
ON
S
BULKHEADS, RIP-RAP,
WAVE SCREEN, AND
FLOATING DOCK
G-002
P1
P1
2G
2.
dw g
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
LL
OY
D-
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
TIDAL DATA
MLLW NAVD88
USCG ANNOTATION SYMBOLS LEGEND
GRID IDENTIFIER
W.L. AT '##
FLOW
KEYNOTE SYMBOL
SPOT ELEVATION INDICATOR FLOW ARROW
WATER LEVEL IDENTIFIER
X/#
COMMON ABBREVIATIONS
ABBR TERM
ABAND. ABANDONED
& AND
AASHTO AMERICAN ASSOCIATION
OF STATE HIGHWAY AND
TRANSPORTATION
OFFICIALS
L ANGLE
℄ CENTER LINE
DIA. DIAMETER
# NUMBER
⅊ PLATE
BLDG BUILDING
CMP CORRUGATED METAL
PIPE
C.P. CONTROL POINT
CONC. CONCRETE
COND. CONDUIT
CSTO CONFIGURATION
STANDARD TECHNICAL
ORDER
DIP DUCTILE IRON PIPE
DWG DRAWING
EA EACH
EL ELEVATION
ELEC ELECTRICAL
EOI END OF GEOPHYSICAL
INVESTIGATION
EP EDGE OF PAVEMENT
ES ELECTRIC SWITCH
EXST EXISTING
FT FEET
GOVT GOVERNMENT
GRAN. GRANITE
HDG HOT DIP GALVANIZED
HDPE HIGH DENSITY
POLYETHYLENE
HS SIGNIFICANT WAVE
HEIGHT
LB POUND
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
MISC MISCELLANEOUS
MLW MEAN LOW WATER
MLLW MEAN LOWER LOW
WATER
MHW MEAN HIGH WATER
MHHW MEAN HIGHER HIGH
WATER
NAVD NORTH AMERICAN
VERTICAL DATUM
NHDOT NEW HAMPSHIRE
DEPARTMENT OF
TRANSPORTATION
NFPA NATIONAL FIRE
PROTECTION AGENCY
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOAA NATIONAL OCEANIC AND
ATMOSPHERIC
ADMINISTRATION
OC ON CENTER
PSF POUNDS PER SQ. FT.
PT PRESSURE TREATED
PVC POLY-VINYL CHLORIDE
QA QUALITY ASSURANCE
QC QUALITY CONTROL
RCP REINFORCED
CONCRETE PIPE
REV REVISION
SBL SINGLE BLUE LINE
SF SQUARE FEET
SHT SHEET
SQ SQUARE
SS STAINLESS STEEL
SWL SINGLE WHITE LINE
SYL SINGLE YELLOW LINE
TH THRESHOLD ELEVATION
TMB TIMBER EDGE/CURB
TYP TYPICAL
UNO UNLESS NOTED
OTHERWISE;
UTIL UTILITY
W WITH
W/O WITHOUT
WWTD WASTE WATER
TREATMENT
DEPARTMENT
XS EXTRA STRONG
(X) INVERT I.D.
CONNECTION UNKNOWN
USCG DETACHMENTS
ABBR TERM
CEU CIVIL ENGINEERING UNIT
CEUP CEU PROVIDENCE
CG COAST GUARD
STA U.S. COAST GUARD
STATION
USCG UNITED STATES COAST
GUARD
USCG PERSONNEL
ABBR TERM
CO; COMMANDING OFFICER
OIC OFFICER IN CHARGE
KO CONTRACTING OFFICER
COR CONTRACTING OFFICER
DOR DESIGNER OF RECORD
DPM DESIGN PROJECT
MANAGER
APPLICABLE CODES
2018 INTERNATIONAL BUILDING CODE
AMERICAN INSTITUTE OF STEEL CONSTRUCTION: STEEL CONSTRUCTION MANUAL 15TH EDITION
(AISC)
2024 AMERICAN WOOD COUNCIL NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION
(NDS)
AMERICAN INSTITUTE OF TIMBER CONSTRUCTION, TIMBER CONSTRUCTION MANUAL, 6TH EDITION
(TCM)
UNIFIED FACILITIES CRITERIA (UFC)
4-152-01 PIERS AND WHARVES (2024)
4-152-07 SMALL CRAFT BERTHING FACILITIES (2012)
3-301-01 STRUCTURAL ENGINEERING (2023)
29 CFR 1910 OCCUPATIONAL SAFETY AND HEALTH (OSHA)
FACILITY/ASSET NAME:
FACILITY/ASSET # (RPUID):
CONSTRUCTION TYPE:
FACILITY GENERAL INFORMATION
BULKHEADS - NORTH QUAYWALL
816511
DRY STACKED GRANITE BLOCKS
FACILITY/ASSET NAME:
FACILITY/ASSET # (RPUID):
BULKHEADS - SOUTH QUAYWALL
816511
FACILITY/ASSET NAME:
FACILITY/ASSET # (RPUID):
CONSTRUCTION TYPE:
RIP-RAP
857029
ANGULAR STONE
STRUCTURE LENGTH:
FACILITY/ASSET NAME:
FACILITY/ASSET # (RPUID):
CONSTRUCTION TYPE:
WAVE SCREEN
50109
CONCRETE FLOATING DOCK
EXPOSURE CATEGORY: D
WAVE HEIGHT: 3 FT.
UNIFORM LIVE LOAD: 40 PSF
STRUCTURE LENGTH: 180 FT
STRUCTURE HEIGHT: 15-18 FT
CONSTRUCTION TYPE: DRY STACKED GRANITE BLOCKS
STRUCTURE LENGTH: 340 FT
STRUCTURE HEIGHT: 15 FT
280 FT
100 YEAR FLOOD RECURRENCE FLOOD WAVE ZONE (VE ZONE)
100 YEAR RECURRENCE FLOOD ZONE (AE ZONE)
HIGHEST OBSERVED WATER LEVEL (01/02/2010)
MEAN HIGHER HIGH WATER (MHHW)
MEAN HIGH WATER (MHW)
NORTH AMERICAN VERTICAL DATUM (NAVD) 1988
NATIONAL GEODETIC VERTICAL DATUM (NGVD) 1929
MEAN LOW WATER (MLW)
MEAN LOWER LOW WATER (MLLW)
LOWEST OBSERVED WATER LEVEL (02/02/2018)
REFERENCE:
NOAA TIDAL STATION #8423998, FORT POINT, NEWCASTLE, NH
FEMA FLOOD MAP 33015C0279F
19.95' 15.00' 16.95' 11.00' 12.78' 7.82' 9.85' 4.89' 8.95' 4.00' 4.95' 0.00' 4.19' -0.77' 0.33' -4.63' 0.00' -4.96' -2.71' -7.66'
USCG DRAWING VIEW SYMBOLS LEGEND
NORTH
PLAN
TRUE N
X# TITLE
SCALE: X=1'-0"
XX###
X#
X#
X#
X#
X#
XX###
X#
XX###
0 1" 2"1/2"
XX###
X#
X#
XX###
X#
XX###
REVISION #
DRAWING VIEW TITLES REVISION CLOUDS AND DELTAS
GRAPHIC SCALES NORTH ARROWS
DRAWING VIEW INDICATOR EXTERIOR ELEVATION INDICATOR
ENLARGED DETAIL INDICATORS INTERIOR ELEVATION INDICATOR
SECTIONAL VIEW INDICATOR
REV CLOUD
PLAN NORTH
TRUE NORTH
ELEVATION
NUMBER/ID
ELEVATION
DRAWING
SHEET
DRAWING
SHEET
NUMBER/ID
DRAWING
VIEW
NUMBER/ID
DRAWING
VIEW
NUMBER/ID
DRAWING
VIEW
TITLE
DRAWING
SCALE
CONCRETE (PLAN AND/OR SECTION)
DEMOLITION AND REMOVALS (PLAN AND/OR SECTION)
BEDROCK/LEDGE (SECTION)
SOIL/FILL (PLAN AND/OR SECTION)
GROUT (SECTION)
STONE RIPRAP (PLAN AND/OR SECTION)
(UNLESS NOTED OTHERWISE)
MATERIALS IN PLAN & SECTIONS
LOAD RESTRICTED AREA (PLAN)
GRANULAR BACKFILL OR GRAVEL SUBBASE (SECTION)
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US
CG
D
RA
W
IN
G
NU
M
BE
R
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
GENERAL WATERFRONT REPAIR NOTES:
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
GE
NE
RA
L
GE
NE
RA
L
NO
TE
S
BULKHEADS, RIP-RAP
WAVE SCREEN, AND
FLOATING DOCK
G-003
P1
P1
2G
3.
dw g
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
LL
OY
D-
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
US COAST GUARD
CIVIL ENGINEERING
1. THESE DRAWINGS FORM A PART OF THE SPECIFICATIONS. REFER TO THE TECHNICAL SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
2. ALL DIMENSIONS, ELEVATIONS AND CONDITIONS SHALL BE VERIFIED IN THE FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER BEFORE ORDERING MATERIALS AND PROCEEDING WITH THE AFFECTED PART OF THE WORK.
3. THE CONTRACTOR IS ADVISED THAT THE DRAWINGS AND SPECIFICATIONS FORM A PART OF THE CONTRACT DOCUMENTS. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL KEEP A COPY OF THE DRAWINGS AND
SPECIFICATIONS ONSITE AT ALL TIMES DURING THE PROJECT.
4. ELEVATIONS ARE IN FEET BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), UNLESS NOTED OTHERWISE.
5. EXISTING CONDITIONS ARE INTENDED TO PROVIDE GENERAL OVERVIEW OF STRUCTURES BUT DO NOT INCLUDE ALL APPURTENANCES AND CONDITIONS. ALL DIMENSIONS AND DETAILS OF THE EXISTING CONSTRUCTION SHALL BE CHECKED AND VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER BEFORE ORDERING MATERIALS AND PROCEEDING WITH THE AFFECTED PART OF THE WORK.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE ALL WORK WITH THE CONTRACTING OFFICER'S REPRESENTATIVE ON A DAILY
BASIS.
7. THE EXACT SIZE & LOCATION OF ALL EXISTING UTILITIES IMPACTED BY THE WORK SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO START OF CONSTRUCTION. CONTRACTOR SHALL TAKE CARE TO PROTECT ALL UTILITIES IN THE WORK AREA AND ALL CONSTRUCTION SHALL
BE COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
8. METHODS OF DEMOLITION, CONSTRUCTION, AND ERECTION ARE THE CONTRACTOR'S RESPONSIBILITY UNLESS OTHERWISE SPECIFIED.
9. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ENVIRONMENTAL CONTROLS AS REQUIRED BY FEDERAL, STATE AND MUNICIPAL REGULATIONS AND PERMITS. ENVIRONMENTAL CONTROLS SHALL INCLUDE BUT NOT BE LIMITED TO TURBIDITY, PH, AND DUST.
10. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE FEDERAL, STATE AND MUNICIPAL REGULATIONS, INCLUDING THE FEDERAL DEPARTMENT OF LABOR, SAFETY, OCCUPATIONAL SAFETY, HEALTH ACT, U.S. ARMY CORPS OF ENGINEERS, STATE/LOCAL WETLANDS CONTROL, AND
PERMITS.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL COST OF REINSPECTION OR RETEST WHEN PRIOR REJECTION MAKES
REINSPECTION OR RETEST NECESSARY.
12. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE DONE TO STRUCTURES AND VESSELS OR INJURIES TO THE PUBLIC AND FACILITY
PERSONNEL AS A RESULT OF PERFORMING THE WORK.
UTILITY NOTES
1. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT AND SUPPORT EXISTING UTILITIES WITHIN THE AREA OF WORK. ANY
DAMAGE INCURRED SHALL BE REPAIRED IMMEDIATELY TO THE SATISFACTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE, AT THE
CONTRACTORS EXPENSE.
2. ALL UTILITIES WITHIN THE LIMITS OF THE WORK SHALL BE EITHER PROTECTED AND SUPPORTED DURING CONSTRUCTION, OR DISCONNECTED AND REINSTALLED, AS REQUIRED TO COMPLETE THE SCOPE REPAIR WORK. ANY UTILITY COMPONENTS WITHIN THE LIMITS OF WORK THAT ARE DAMAGED DURING CONSTRUCTION, OR NOT SUITABLE FOR REINSTALLATION AS A RESULT OF THE WORK, SHALL BE
REPLACED IN-KIND AT NO ADDITIONAL COST TO THE GOVERNMENT.
4. ALL INCIDENTAL ELECTRICAL WORK REQUIRED TO COMPLETE THE REPAIRS SHALL BE COMPLETED IN ACCORDANCE WITH THE NFPA 70:
NATIONAL ELECTRIC CODE.
5. OUTAGES SHALL BE LIMITED TO THE EXTENT PRACTICAL TO MINIMIZE INTERRUPTIONS TO STATION OPERATIONS. DURING WORK WITHIN THE LIMITS OF THE FUEL SYSTEM, THE FUEL SYSTEM SHALL BE TURNED OFF AND DISCONNECTED AS REQUIRED TO COMPLETE THE WORK, BUT NO LONGER THAN 3 WEEKS. DURING THIS TIME, THE CG WILL BE UTILIZING A LOCAL MARINA FOR REFUELING. IF FUEL OUTAGES LAST LONGER THAN 3 WEEKS, THE CONTRACTOR SHALL PROVIDE TEMPORARY ON-SITE FUEL SERVICE FOR THE VESSELS AT NO ADDITIONAL
COST TO THE GOVERNMENT.
6. NOTIFY THE COR AND THE STATION A MINIMUM OF 5 WORKING DAYS IN ADVANCE OF ANY OUTAGES. ALL OUTAGES, INCLUDING DISCONNECTION OF THE FUEL SERVICES, SHALL BE APPROVED BY THE CONTRACTING OFFICER AND COORDINATED WITH THE COR AND THE
STATION.
MARINE COATING NOTES
1. MARINE COATING FOR RECOATING THE EXISTING GUIDE PILES SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH SPECIFICATION
SECTION 09 97 13.26.
2. COATING SHALL BE BLACK, COMPOSED OF A TWO-PART COAL-TAR EPOXY, OR APPROVED EQUAL, APPLIED TO A MINIMUM 16 MIL
THICKNESS (DRY FILM).
3. COATING SHALL BE APPLIED IN STRICT CONFORMANCE TO APPLICABLE ENVIRONMENTAL PERMITS AND REGULATIONS AND THE UNITED
STATES COAST GUARD'S ENVIRONMENTAL POLICIES AND STANDARDS.
4. IF BID OPTION ITEM 2 IS AWARDED, THE CONTRACTOR SHALL ENSURE THAT THE COATING HAS SUFFICIENTLY CURED AND IS ADEQUATELY
PROTECTED DURING INSTALLATION OF THE PILE SLEEVES.
REVETMENT NOTES
1. THE CONTRACTOR SHALL PROVIDE AND SET NEW BEDDING AND RIPRAP STONES FOR THE RESTORATION OF THE REVETMENT WITHIN THE
CONSTRUCTION LIMITS AS SHOWN ON THE DRAWINGS. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL REGULATORY
REQUIREMENTS WITHIN THE LIMITS SPECIFIED HEREIN AND INDICATED BY THE DRAWINGS.
2. THE RIPRAP STONES SHALL BE PLACED AND NOT DUMPED. THE RIPRAP SHALL BE GRADED AND PLACED INTO POSITION BY EQUIPMENT IN ORDER TO INTERLOCK WITH ADJOINING UNITS WITH MAXIMUM CONTACT POINTS. EACH STONE SHALL BE ADEQUATELY KEYED INTO PROPER
SEATING TO ENSURE A TIGHT FIT, AND THE STABILITY OF THE SLOPE IS MAINTAINED.
3. AT THE NORTH REVETMENT, THE CONTRACTOR SHALL MAY USE EXISTING STONES PRESENT IN THE AREA TO REGRADE THE EXISTING AREA TO ESTABLISH THE SUBSURFACE GRADES PRIOR TO PLACEMENT OF THE BEDDING LAYER. EXISTING STONES MAY BE USED AS THE TOE STONE, PROVIDED THAT THEY ARE OF THE REQUIRED SIZE AND SET TO ESTABLISH THE TOE OF THE RESTORED SLOPE AREA.
4. THE INTENT OF THE BEDDING LAYER AND RIPRAP SLOPE SHOWN IS TO IMPROVE PROTECTION AND STABILIZATION OF THE ERODED SHORELINE AREA, LOCATED ABOVE MEAN HIGH WATER. THE EXISTING SLOPE IN THIS AREA SHALL BE EXCAVATED AND PREPARED TO SET THE TOE STONES, BEDDING LAYER, AND RESTORED SLOPE PROTECTION AS SHOWN ON THE DRAWINGS. IN THE EVENT THAT LEDGE OUTCROPPINGS ARE PRESENT THAT INTERFERE WITH THE PROPOSED BEDDING AND RIPRAP LAYERS SHOWN, THE BEDDING LAYER THICKNESS MAY BE REDUCED, OR TERMINATED IN THE AREA OF INTERFERENCES, TO FACILITATE CONSTRUCTION AND MAINTAIN A CONSISTENT REVETMENT FACE. IF THE BEDDING LAYER IS TERMINATED AT THESE AREAS, THE GEOTEXTILE LAYERS FOR THE SURROUNDING BEDDING SHALL BE TURNED BACK A MINIMUM 18 INCHES TO PREVENT LOSS OF BEDDING MATERIAL.
5. RIPRAP REVETMENT STONES FOR THE NORTH REVETMENT SHALL CONFORM TO NHDOT TABLE 583-1 CLASS III GRADATION. RIPRAP REVETMENT STONES FOR THE SOUTH REVETMENT SHALL CONFORM TO NHDOT TABLE 583-1 CLASS VII GRADATION.
6. BEDDING STONE FOR THE NORTH REVETMENT SHALL CONFORM TO NHDOT #357 STONE, TABLE 703.1.
7. BEDDING STONE FOR THE SOUTH REVETMENT SHALL CONFORM TO NHDOT SECTION 585.2.1 3, CLASS C STONE.
8. THE CONTRACTOR SHALL PLACE TOE STONES, FOLLOWED BY BEDDING STONE, AND RIPRAP STONE.
9. REFER TO SPECIFICATION SECTION 35 31 19.40 FOR ADDITIONAL REQUIREMENTS.
CATHODIC PROTECTION NOTES
1. GALVANIC ANODES FOR THE PILES SHALL BE ALUMINUM ANODES PROVIDED AND INSTALLED IN ACCORDANCE WITH PROJECT
SPECIFICATION SECTION 26 42 13.
2. ANODE SHALL BE A MINIMUM 120-LB ANODE., MEETING THE FOLLOWING CHEMICAL COMPOSITION, AND WITH DIMENSIONS AS SHOWN ON
THE CONTRACT DRAWINGS:
A. ZINC (Zn) 2.80 - 6.50% B. INDIUM (In) 0.01 - 0.02% C. SILICON (Si) 0.08 - 0.20% D. COPPER (Cu) 0.006% (MAX) E. IRON (Fe) 0.120% (MAX)
F. ALUMINUM REMAINDER
3. ANODE CORE SHALL BE A FLAT-BAR TYPE AS SHOWN ON THE DRAWINGS.
GEOTEXTILE NOTES
1. GEOTEXTILE FOR SOIL SEPARATION IN AREAS OF EXCAVATION, SINKHOLE REPAIRS, AND GENERAL CIVIL SITE WORK SHALL BE A CLASS 2
NON-WOVEN GEOTEXTILE IN ACCORDANCE WITH AASHTO M288, SUITABLE FOR SOIL SEPARATION AND SUBSURFACE DRAINAGE USES.
2. GEOTEXTILE FOR RIPRAP REVETMENT LAYERS IN AREAS OF EXCAVATION SHALL BE A CLASS 2 WOVEN GEOTEXTILE IN ACCORDANCE WITH
AASHTO M288, SUITABLE FOR RIPRAP REVETMENT AND SLOPE STABILIZATION USES.
3. JOINTS SHALL BE LAPPED A MINIMUM OF 12 INCHES FOR SOIL SEPARATION, AND MINIMUM OF 36 INCHES FOR REVETMENT LAYERS.
TERMINATIONS SHALL BE TURNED BACK A MINIMUM OF 18 INCHES TO PREVENT LOSS OF CONTAINED OR SEPARATED MATERIAL.
4. REFER TO SPECIFICATION SECTION 31 05 19.13 FOR ADDITIONAL REQUIREMENTS.
DEMOLITION AND EXCAVATION NOTES:
1. WHERE COMPONENTS ARE CALLED OUT ON THESE DRAWINGS AS "REPLACE", "REMOVE AND REPLACE", OR SIMILAR VERBIAGE, CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING COMPONENTS, AND FURNISH AND INSTALL NEW COMPONENTS. WHERE COMPONENTS ARE CALLED OUT ON THESE DRAWINGS AS "REMOVE AND SALVAGE" OR SIMILAR VERBIAGE, CONTRACTOR SHALL REMOVE, STORE AND PROTECTS ITEMS AS NECESSARY, AND REINSTALL THE EXISTING COMPONENTS.
2. CONTRACTOR SHALL REMOVE ALL ITEMS IDENTIFIED FOR REMOVAL OR DEMOLITION IN THIS DRAWING SET AS REQUIRED TO COMPLETE THE REPAIRS. FOR ITEMS TO BE REMOVED AND REINSTALLED, THE CONTRACTOR MAY ELECT TO LEAVE THE SITE FEATURES IN PLACE DURING REPAIRS, PROVIDED THAT THE FEATURES ARE SHORED AS NECESSARY, PROTECTED FROM DAMAGE, AND REMAIN UNDISTURBED THROUGHOUT THE PROJECT. ITEMS THAT ARE DAMAGED OR DISTURBED, SHALL BE REPLACED IN-KIND OR AS INDICATED IN THE DRAWINGS, TO THE SATISFACTION OF THE CONTRACTING OFFICER AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
3. ALL MATERIAL REMOVED/DEMOLISHED AND NOT SALVAGED AND/OR REINSTALLED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF-SITE. REMOVED MATERIAL SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL LOCAL, STATE AND
FEDERAL LAWS.
4. THE CONTRACTOR SHALL PROVIDE CONTROL MEASURES AS REQUIRED BY ENVIRONMENTAL REGULATIONS AND AS REQUIRED TO PREVENT DEBRIS CONTAMINANTS (SOLID, LIQUID OR DISSOLVED) FROM ENTERING THE WATER. UNDERWATER INSPECTIONS MAY BE CONDUCTED BY THE CONTRACTING OFFICER TO ENSURE THE CONTRACTOR HAS REMOVED ALL DEMOLITION AND CONSTRUCTION DEBRIS FROM THE
MUDLINE.
5. CONTRACTOR SHALL PREVENT THE SPREAD OF DUST AND DEBRIS AND AVOID THE CREATION OF A NUISANCE OR HAZARD IN THE SURROUNDING AREA. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS, BUT NOT LIMITED TO, FLOODING OR POLLUTION.
6. CONTRACTOR SHALL VERIFY AND VALIDATE THAT ALL MATERIALS REMOVED FROM THE SITE ARE CONTAMINANT FREE PRIOR TO DISPOSING OR RECYCLING OF ANY MATERIAL; APPROPRIATE REGULATORY TESTING SHALL CONFIRM THAT MATERIALS ARE FREE OF CONTAMINANTS.
7. WHERE PEDESTRIAN/CG PERSONNEL AND DRIVER SAFETY IS ENDANGERED IN THE AREA OF REMOVAL OR EXCAVATION WORK, USE TRAFFIC BARRICADES. ANCHOR BARRICADES IN A MANNER TO PREVENT DISPLACEMENT BY WIND. NOTIFY FACILITY PERSONNEL PRIOR TO
BEGINNING SUCH WORK.
8. CONTRACTOR SHALL IMPLEMENT METHODS TO SEAL ENDS OF EXCAVATIONS IN ORDER TO MINIMIZE WATER INFILTRATION AND MIGRATION OF FINES FROM ADJACENT AREAS INTO THE EXCAVATION. AREAS THAT BECOME DESTABILIZED AND/OR LOSS OF FILL CREATED FROM THE EXCAVATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
9. THE CONTRACTOR IS ADVISED THAT DEWATERING MAY BE REQUIRED TO COMPLETE THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING NECESSARY DEWATERING PERMITS FOR DISCHARGING INTO THE SURFACE WATERS, OR COORDINATING WITH THE CITY OF PORTSMOUTH WWTP FOR DISCHARGING INTO THE PUBLICLY OWNED TREATMENT WORKS (POTW). IT IS ANTICIPATED THAT DISCHARGE METERING, WATER SAMPLING, AND SETTLEMENT OF SUSPENDED SOLIDS WILL BE REQUIRED PRIOR TO DISCHARGING INTO SURFACE WATERS OR POTW. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL CONSTRUCTION-RELATED PERMITS, INCLUDING DEWATERING
PERMITS.
10. THE CONTRACTOR SHALL OBTAIN A PERMIT FROM THE TOWN OF NEW CASTLE FIRE DEPARTMENT FOR WELDING OR TORCH CUTTING WORK PERFORMED AT THE SITE. CONTRACTOR SHALL ALSO OBTAIN A BURN PERMIT FROM STA EPO PRIOR TO WELDING OR TORCH CUTTING.
11. REFER TO SPECIFICATION SECTION 02 41 00 DEMOLITION AND DECONSTRUCTION FOR ADDITIONAL DEMOLITION REQUIREMENTS. REFER TO SPECIFICATION SECTION 31 23 00.00 FOR ADDITIONAL EXCAVATION AND EARTHWORK REQUIREMENTS.
CONCRETE NOTES:
1. CAST-IN-PLACE CONCRETE SHALL APPLY TO FENCE POST FOOTINGS, SOUTH QUAY WALL VOID REPAIR, CLOSURE WALL AT EAST END OF
NORTH QUAY WALL, AND OTHER INCIDENTAL SITE WORK.
2. ALL CONCRETE CONSTRUCTION AND DETAILING SHALL CONFORM TO THE LATEST EDITION OF ACI 318.
3. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 5,000 PSI IN ACCORDANCE WITH THE SPECIFICATIONS. THE CONCRETE FOR THE SOUTH QUAY WALL VOID REPAIR SHALL BE A MARINE-GRADE CONCRETE, INCLUDING A CORROSION INHIBITOR.
4. MAINTAIN 3" CLEAR COVER TO ALL REINFORCING STEEL, UNLESS OTHERWISE NOTED.
5. EXPOSED CONCRETE EDGES SHALL HAVE A 3/4" CHAMFER, UNLESS OTHERWISE INDICATED.
6. CONCRETE SURFACES SHALL BE COVERED AND MOIST CURED FOR A PERIOD OF NOT LESS THAN SEVEN (7) FULL DAYS AFTER CONCRETE
PLACEMENTS.
7. ALL WELDED WIRE REINFORCING SHALL BE IN ACCORDANCE WITH ASTM A1064. ALL REINFORCING BARS SHALL BE IN ACCORDANCE WITH ASTM A615, GRADE 60. REINFORCING BARS FOR THE SOUTH QUAY WALL VOID REPAIR SHALL BE HOT-DIP GALVANIZED IN ACCORDANCE
WITH ASTM A767.
8. ALL REINFORCING SHALL BE FULLY SUPPORTED ON APPROVED PLASTIC CHAIRS AND/OR COATED STEEL.
9. REFER TO SECTION 03 30 00 CAST-IN-PLACE CONCRETE FOR ADDITIONAL REQUIREMENTS.
STRUCTURAL STEEL NOTES:
1. ALL STRUCTURAL STEEL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC STEEL CONSTRUCTION
MANUAL.
2. ALL STRUCTURAL STEEL SHAPES SHALL BE ASTM A572, GRADE 50. ALL STEEL PLATES SHALL BE ASTM A36. ALL STEEL PLATES AND SHAPES, SHALL BE HDG, UNLESS NOTED OTHERWISE.
3. STEEL PIPE SHALL BE ASTM A53 GRADE B. ALL PIPE SHALL BE HDG, UNLESS NOTED OTHERWISE.
4. ALL ABOVE WATER WELDING SHALL BE IN ACCORDANCE WITH SPECIFICATION SECTION 05 12 00 AND THE STRUCTURAL WELDING CODE D1.1 OF THE AMERICAN WELDING SOCIETY (AWS). ELECTRODES SHALL BE E7OXX LOW HYDROGEN IN ACCORDANCE WITH AWS SPECIFICATIONS.
UNDERWATER WELDING SHALL BE IN ACCORDANCE WITH AWS CODE D3.6.
5. ALL BOLTS, THREADED RODS, NUTS AND WASHERS SHALL BE HOT-DIP GALVANIZED, UNLESS NOTED OTHERWISE, IN ACCORDANCE WITH
ASTM A153, OR F2329, AS APPLICABLE.
6. STAINLESS STEEL BOLTS AND THREADED ROD SHALL BE TYPE 316/316L.
7. ALL DISSIMILAR METALS SHALL BE SEPARATED BY PLASTIC SEPARATION SHEETS OR BUSHINGS NOT LESS THAN 1/16 INCH THICK. THE SEPARATION SHEETS SHALL BE NYLATRON-GS, PLASTIC SHEET CONFORMING TO MILITARY SPECIFICATION MIL-P-15035 OR OTHER SUITABLE
MATERIAL TO LIMIT GALVANIC CORROSION.
8. REFER TO SPECIFICATION SECTION 05 12 00 FOR ADDITIONAL STRUCTURAL REQUIREMENTS, SECTION 32 31 13, AND CSTO REFERENCE
DOCUMENT INCLUDED IN SPECIFICATIONS FOR STEEL SECURITY FENCING REQUIREMENTS.
9. ALL REPLACEMENT FENCING SHALL BE USCG CSTO-COMPLIANT 7-FT HIGH CHAINLINK FENCE WITH A 1-FT TOPGUARD (8-FT TOTAL FENCE
HEIGHT). SEE CSTO REFERENCE DOCUMENT INCLUDED IN PROJECT SPECIFICATIONS.
TIMBER FLOATING DOCK NOTES:
1. THE FLOATING DOCKS SHALL BE CONSTRUCTED OF TIMBER, WITH FLOAT MODULES CONSISTING OF EXPANDED POLYSTYRENE BILLETS ENCAPSULATED IN AN HDPE SHELL. ALL DOCKS SHALL BE DESIGNED FOR THE MARINE SALTWATER ENVIRONMENT.
2. FLOATING DOCK SHALL BE CONSTRUCTED FOR A UNIFORM LIVE LOAD OF 40-PSF, MAINTAINING A MINIMUM FREEBOARD OF 8 INCHES UNDER DEAD AND LIVE LOAD CONDITIONS. DOCKS SHALL HAVE A MINIMUM FREEBOARD OF 18-22 INCHES UNDER DEAD LOAD CONDITIONS, INCLUDING ALL PERMANENT DOCK COMPONENTS AND GANGWAY. DOCKS SHALL NOT HAVE MORE THAN A 5 DEGREE LIST AFTER
COMPLETED INSTALLATION.
3. ADDITIONAL FLOATATION SHALL BE USED FOR FLOATING DOCK UNDER GANGWAY LANDING TO PROVIDE LEVEL FLOATATION UNDER
GANGWAY DEAD LOAD.
4. FLOATING DOCK WILL BE EXPOSED TO WIND AND WAVES DURING ERECTION AND WHILE IN SERVICE, AND CONTRACTOR SHALL ANALYZE, DESIGN AND CONSTRUCT ACCORDINGLY. CONTRACTOR SHALL PROVIDE BRACKETED CONNECTIONS AND HARDWARE TO ACCOMMODATE DESIGN LOADS AND FREEBOARD REQUIREMENTS AS OUTLINED ABOVE, AND TO WITHSTAND ENVIRONMENTAL WAVE AND VESSEL WAKE ACTION NORMAL TO THE SITE. THE FOLLOWING IS MINIMUM DESIGN CRITERIA THAT SHALL BE USED FOR THE DOCK SYSTEM:
4.a. UNIFORM LIVE LOAD: 40 PSF 4.b. CURRENT VELOCITY: 0.5 FPS 4.c. SIGNIFICANT WAVE HEIGHT (HS): 2.0 FT 4.d. WAVE PERIOD: 3 SECONDS 4.e. VESSEL IMPACT: 1000 FT-LB AT 10 DEGREES FROM LONGITUDINAL AXIS 4.f. WIND LOAD: 22 PSF ON MOORED VESSEL PROFILES AND EXPOSED FLOAT AREAS.
4.g. MOORED VESSEL: (2) 47-FT MOTOR-LIFE BOAT, ONE LOCATED ON EACH SIDE OF DOCK.
5. PILE GUIDE ASSEMBLIES SHALL BE ROLLER-TYPE, CONSTRUCTED OF HDG HOLLOW STRUCTURAL STEEL OR HDG STEEL ANGLES WITH A
MINIMUM STEEL THICKNESS OF 3/8-INCH.
6. CLEATS SHALL BE 15-INCH HOT-DIPPED GALVANIZED CAST STEEL AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, USING THRU-BOLTED CONNECTIONS. MOORING HARDWARE AND MOORING HARDWARE CONNECTIONS SHALL BE
DESIGNED FOR A 3,500 LB LINE LOAD.
7. REFER TO SPECIFICATION SECTION 35 51 13.00 FOR ADDITIONAL REQUIREMENTS.WORK RESTRICTIONS:
1. THE CONTRACTOR IS ADVISED THAT LOADING WITHIN 15 FEET OF THE EXISTING NORTH QUAY WALL FACE IS LIMITED TO 100 PSF UNIFORM
LIVE LOAD. VEHICLES, CRANES, OR OTHER LOAD HANDLING EQUIPMENT IS PROHIBITED IN THIS AREA. REFER TO SEE SHEET G-101 AND THE
PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND RESTRICTIONS.
SULLIVAN LANE
EXISTING STONE REVETMENT
MHW (EL. 4.0')
STA PORTSMOUTH HARBOR
PISCATAQUA RIVER
BULKHEADS - NORTH QUAY WALL (RPUID 816511) (SHEET C-102, C-301)
- CHINK AND REPOINT QUAY WALL
- REMOVE AND REPLACE EXISTING FENCE (RPUID 810801)
- REPAIR SINKHOLES IN DUMPSTER PAD AREA (RPUID 9383)
- PROVIDE EAST CLOSURE WALL IN DUMPSTER PAD AREA
RIP-RAP (RPUID 857029) (SHEET C-102, C-301)
- RESTORE RIP-RAP REVETMENT
- REMOVE AND REPLACE EXISTING FENCE (RPUID 810801)
- REPAIR SINKHOLES IN WEST PARKING LOT (RPUID 9383)
BULKHEADS - SOUTH QUAY WALL (RPUID 816511) (SHEET C-102, C-302)
- REPAIR VOID IN FACE OF QUAY WALL
- REPAIR SINKHOLE BEHIND QUAY WALL
- PROVIDE REVETMENT EXTENSION AT WEST END OF QUAY WALL (BID OPTION 1)
WAVE SCREEN/FLOAT DOCK (RPUID 50109) (SHEET S-101)
- RECOAT GUIDE PILES FROM MLW TO TOP OF PILES
- REPLACE BROKEN CLEAT
- INSTALL GALVANIC ANODES
- INSTALL HDPE PILE SLEEVES (BID OPTION 2)
BULKHEAD - SOUTH QUAY WALL (RPUID 816511) (SHEET C-102, C-302)
- REPAIR EAST WALL WITH INTERIM STONE BERM
FORT CONSTITUTION
EXISTING STATION ENTRANCE GATE EQUIPMENT SHED
EXISTING BOATHOUSE
HAZARDOUS WASTE STORAGE
EXISTING GABION MATTRESS
LOADING WITHIN 15 FEET OF QUAY WALL
IS LIMITED TO 100 PSF UNIFORM LIVE
LOAD. VEHICLES, CRANES, OR OTHER
LOAD HANDLING EQUIPMENT IS
PROHIBITED IN THIS AREA. (SEE NOTE 2)
FLOATING DOCK - BOATHOUSE (RPUID 848538) (SHEET S-102)
- INSTALL NEW TIMBER FLOAT
ENG BLDG
SAR BLDG
UNH BLDG
MULTI MISSION
BLDG
SHED
OLD OIL HOUSE
KEEPER'S QUARTERS
0+
0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 1+98
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20
2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+004+12
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
GE
NE
RA
L W
OR
K
PL
AN
BULKHEADS, RIP-RAP,
WAVE SCREEN, AND
FLOATING DOCK
G-101
P1
P1
2G
1.
dw g
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
LL
OY
D-
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
US COAST GUARD
CIVIL ENGINEERING
F1 G-901
F3 G-901
F3 G-901
F5 G-901
F7 G-901
D1 G-901
D3 G-901
D5 G-901
D7 G-901
B1 G-901
B3 G-901
B5 G-901
B7 G-901
A1 G-901A3
G-901
A5 G-901 A7
G-901
NOTES
1. CONTRACTOR SHALL COORDINATE STATION ACCESS AND PARKING WITH THE
COR AND OIC. SEE SPECIFICATION SECTION 01 14 00 ADDITIONAL REQUIREMENTS.
2. AREA OF LOAD RESTRICTIONS SHOWN HAS INTERMITTENT AREAS OF
SUBSIDENCE AND SINKHOLES THROUGHOUT. CONTRACTOR SHALL EXERCISE
EXTREME CAUTION WHEN USING THIS AREA WHILE PERFORMING THE WORK.
X# G-901
LEGEND
PHOTO IDENTIFIER (ARROW INDICATES DIRECTION TAKEN)
LOAD RESTRICTED AREA
APPROXIMATE AREA OF WORK
WORK PLAN
AutoCAD SHX Text
SBL
AutoCAD SHX Text
TMB
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SYL
AutoCAD SHX Text
SYL
AutoCAD SHX Text
TMB
AutoCAD SHX Text
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SCALE: 1"=30'
OVERALL OF NORTH QUAYWALL, LOOKING SOUTHEASTF1 NTS
TYPICAL GAPS BETWEEN BLOCKS IN NORTH QUAYWALLF3 NTS
SHIFTED AND DISPLACED BLOCKS IN NORTH QUAYWALLF5 NTS
ROTATION AND BULGING ALONG TOP OF NORTH QUAYWALLF7 NTS
OVERALL OF NORTH REVETMENTD1 NTS
FAILED SOUTH QUAYWALL, LOOKING EASTA1 NTS
DUMPSTER PAD AREA TO BE REPAIREDB1 NTS
EAST CLOSURE WALL REPAIR AREA AT DUMPSTER PADB3 NTS
LOSS OF STONES AND CONCRETE IN SOUTH QUAYWALLB7 NTS
FAILED SOUTH QUAYWALL, LOOKING WESTA3 NTS
CORROSION AND COATING LOSS ON WAVE ATTENUATOR PILESA5 NTS
UNPROTECTED SHORELINE TO WEST OF SOUTH QUAYWALLB5 NTS
GABION MATTRESS REPAIR AT NORTHWEST REVETMENTD3 NTS
TEMPORARY REPAIRS AT NORTH REVETMENTD5 NTS
FORMER BOATHOUSE FLOATING DOCK LOCATIOND7 NTS
BROKEN CLEAT ON WAVE ATTENUATORA7 NTS
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
GE
NE
RA
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
PH
OT
OS
BULKHEADS, RIP-RAP,
WAVE SCREEN, AND
FLOATING DOCK
G-901
P1
P1
2G
1.
dw g
US
CG
, C
EU
P
RO
VI
DE
NC
E
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R
I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
LL
OY
D-
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
US COAST GUARD
CIVIL ENGINEERING
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
SOLICITATION NO.: CONTRACT NO.:
EXISTING QUAYWALL TO BE
CHINKED AND REPOINTED
EXISTING
QUAYWALL GAPS TO
BE CHINKED (TYP)
EXISTING QUAYWALL
GAPS TO BE CHINKED
(TYP)
EXISTING REVETMENT TO BE
STABILIZED WITH RIPRAP
EXISTING GABION
MATTRESSES TO
REMAIN
EXISTING NORTH REVETMENT
TO BE STABILIZED WITH RIPRAP
EXISTING REVETMENT TO BE
STABILIZED WITH RIPRAP AREA OF TIMBER FLOATING
DOCK REPLACEMENT
VOID BELOW DUMPSTER
PAD TO BE REPAIRED
AREA OF RIPRAP STABILIZATION
AT WEST END OF SOUTH
QUAYWALL (BID OPTION ITEM 1)
VOID/MISSING STONES IN SOUTH
QUAYWALL TO BE REPAIRED
AREA OF FAILED SOUTH
QUAYWALL TO BE REPLACED
WITH INTERIM RIPRAP BERM
AREA OF MISSING STONES TO
BE RESET AT SOUTH QUAYWALL
EXISTING FLOATING WAVE
ATTENUATOR GUIDE PILES TO BE
RECOATED (BASE BID) AND
PROTECTED WITH HDPE SLEEVES (BID
OPTION ITEM 2)(TYP)
BROKEN CLEAT TO BE REPLACED ON
EXISTING FLOATING WAVE
ATTENUATOR
AREA OF FAILED SOUTH
QUAYWALL TO BE REPLACED
WITH INTERIM RIPRAP BERM
EXISTING FENCE TO BE
REPLACED (TYP)
OHW
S
D
G
W
X
E
C
U
FM
1. REFERENCE: USCG STATION PORTSMOUTH HARBOR NEWCASTLE, NH
2. FIELD SURVEY PERFORMED BY J.H.H. & S.N.F. (SURVEYING AND MAPPING, LLC) DURING
MARCH, 2025 USING A TOTAL STATION AND A SURVEY GRADE GPS WITH A DATA
COLLECTOR AND A DIGITAL LEVEL. TRAVERSE ADJUSTMENT BASED ON LEAST SQUARE
ANALYSIS.
3. TERRESTRIAL LIDAR SURVEY PERFORMED BY M.J.C. (SURVEYING AND MAPPING, LLC) ON
MARCH 10, 2025 USING A LEICA HDS SCANNER. REGISTRATION ADJUSTMENT BASED ON
LEAST SQUARE ANALYSIS.
4. HORIZONTAL DATUM BASED ON NAD83(2011) NEW HAMPSHIRE STATE PLANE COORDINATE
ZONE (2800) DERIVED FROM REDUNDANT GPS OBSERVATIONS UTILIZING THE KEYNET GPS
VRS NETWORK.
5. VERTICAL DATUM IS BASED ON NAVD88 PER DIFFERENTIAL LEVELS FROM DISK
CONSTITUTION 147 RM 1 (PUBLISHED NAVD88 ELEVATION = 14.69'). THIS DISK WAS ALSO
USED AS CONTROL POINT #3 SHOWN HEREON.
6. HIGHEST OBSERVABLE TIDE LINE IDENTIFIED BY LUKE HURLEY, CWS#232 ON MARCH 1,
2025.
7. PROPER FIELD PROCEDURES WERE FOLLOWED IN ORDER TO GENERATE CONTOURS AT 1'
INTERVALS. ANY MODIFICATION OF THIS INTERVAL WILL DIMINISH THE INTEGRITY OF THE
DATA, AND DOUCET SURVEY WILL NOT BE RESPONSIBLE FOR ANY SUCH ALTERATION
PERFORMED BY THE USER.
8. THE ACCURACY OF MEASURED UTILITY INVERTS AND PIPE SIZES/TYPES IS SUBJECT TO
NUMEROUS FIELD CONDITIONS, INCLUDING; THE ABILITY TO MAKE VISUAL OBSERVATIONS,
DIRECT ACCESS TO THE VARIOUS ELEMENTS, MANHOLE CONFIGURATION, ETC.
9. UNDERGROUND UTILITIES SHOWN HEREON ARE THE RESULT OF A QUALITY LEVEL B
UTILITY DESIGNATION COMPLETED BY DOUCET SURVEY DURING MARCH 2025 AND FROM
DATA OBTAINED FROM RECORD MAPS & DRAWINGS. DOUCET'S UTILITY DESIGNATION WAS
COMPLETED IN ACCORDANCE WITH THE STANDARD PROCEDURES SET FORTH IN ASCE
38-22 AND CONSISTENT WITH APPROPRIATE QUALITY LEVELS. DRAIN & SANITARY SEWER
WERE VISUALLY ALIGNED AND MAPPED AT QUALITY LEVEL C UNLESS OTHERWISE SHOWN.
ALL ABOVEGROUND STRUCTURES, SURFACE FEATURES AND THE LOCATION OF THE MARK
OUT ARE THE RESULT OF AN INSTRUMENT SURVEY COMPLETED BY DOUCET UNLESS
OTHERWISE NOTED. THERE MAY BE OTHER UNDERGROUND UTILITIES, THE EXISTENCE OF
WHICH ARE NOT KNOWN OR CERTIFIED BY THE UNDERSIGNED. DIG-SAFE AND THE
APPROPRIATE AUTHORITIES MUST BE NOTIFIED PRIOR TO CONDUCTING TEST BORINGS,
EXCAVATION OR CONSTRUCTION ACTIVITIES.
10. QUALITY LEVEL D (QLD) RECORD UTILITY INFORMATION IS BASED ON USCG BASE PLAN
DRAWING P1805UPOR AND UTILITY RECORDS MADE AVAILABLE BY COLLINS ENGINEERS,
INC.. THE UTILITY INFORMATION IS ONLY INTENDED TO BE USED TO HELP FACILITATE A
GRAPHIC REPRESENTATION AND DO NOT REPRESENT SURVEY LOCATIONS.
11. APPROXIMATE ABUTTER LINES AS SHOWN HEREON ARE BASED ON NH GRANIT GIS DATA
AND ARE IN THEIR ORIGINAL LOCATION.
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
EXISTING CONDITIONS LEGEND
S-QLD
W-QLD
E-QLD
UTILITY LINES QUALITY LEVEL 'D' (SEE NOTE 10)
U-QLD
FM-QLD
FO
AB
DOUCET
SURVEY A Company
102 Kent Place, Newmarket, NH 03857 (603) 659-6560 Offices in Bedford & Keene, NH and Kennebunk, ME
Locations Nationwide | http://www.sam.biz
DOUCET
SURVEY A Company
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
CI
VI
L
EX
IS
TI
NG
C
ON
DI
TI
ON
S
NO
TE
S
BULKHEADS, RIP-RAP,
WAVE SCREEN, AND
FLOATING DOCK
C-001
P1
P1
2C
1.
dw g
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
LL
OY
D-
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
US COAST GUARD
CIVIL ENGINEERING
APPROXIMATE ABUTTERS LINE (NOTE 11)
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
RETAINING WALL
CHAIN LINK FENCE
CONSTRUCTION FENCE
GUARDRAIL
OVERHEAD WIRE
DRAIN LINE
SEWER LINE (SEE NOTE 9)
SEWER FORCEMAIN LINE (SEE NOTE 9)
WATER LINE (SEE NOTE 9)
GAS LINE (SEE NOTE 9)
ELECTRIC LINE (SEE NOTE 9)
FUEL OIL LINE (SEE NOTE 9)
CABLE/INTERNET LINE (SEE NOTE 9)
ABANDONED SEWER LINE (SEE NOTE 9)
UNIDENTIFIED UNDERGROUND UTILITY (SEE NOTE 9)
UNIDENTIFIED ABOVEGROUND CONDUIT
HIGHEST OBSERVABLE TIDE (SEE NOTE 6)
CONCRETE
RIP RAP
CRUSHED STONE
BRICK
PILE
LEDGE OUTCROP
SINKHOLE
SNOWBANK
SPOT GRADE
DISK FOUND
DISK SET
UTILITY POLE & GUY WIRE
UTILITY POLE STUMP
LIGHT POLE W/ARM
CATCH BASIN
SEWER MANHOLE
WATER SHUTOFF VALVE
GAS REGULATOR VALVE
HAND HOLE
PAD MOUNTED TRANSFORMER
ELECTRIC BOX
ELECTRIC MANHOLE
ELECTRIC METER
TELEPHONE MANHOLE
CABLE BOX
UNIDENTIFIED UTILITY BOX
AIR CONDITIONER
VENT PIPE
SIGN (TWO POSTS)
SQUARE POST
WOODEN POST
BOLLARD
JERSEY BARRIER
MONITORING WELL LOCATION
CAPSTAN
ABANDONED
CORRUGATED METAL PIPE
CONTROL POINT
CONCRETE
CONDUIT
DUCTILE IRON PIPE
END OF GEOPHYSICAL INVESTIGATION
EDGE OF PAVEMENT
ELECTRIC SWITCH
FINISHED FLOOR ELEVATION
GRANITE
REINFORCED CONCRETE PIPE
SINGLE WHITE LINE
SINGLE YELLOW LINE
SINGLE BLUE LINE
THRESHOLD ELEVATION
TIMBER EDGE / CURB
TYPICAL
INVERT I.D. CONNECTION UNKNOWN
ELECTRIC LINE
SEWER LINE
SEWER FORCEMAIN LINE
WATER LINE
UNIDENTIFIED UNDERGROUND UTILITY
EXISTING CONDITIONS NOTES
AutoCAD SHX Text
GR
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
AutoCAD SHX Text
HH
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SYL
AutoCAD SHX Text
EP
AutoCAD SHX Text
ES
AutoCAD SHX Text
FF
AutoCAD SHX Text
TH
AutoCAD SHX Text
GRAN.
AutoCAD SHX Text 100.0
AutoCAD SHX Text
TMB
AutoCAD SHX Text
DIP
AutoCAD SHX Text
RCP
AutoCAD SHX Text (X)
AutoCAD SHX Text
EOI
AutoCAD SHX Text
CMP
AutoCAD SHX Text
EM
AutoCAD SHX Text
COND.
AutoCAD SHX Text C.P.
AutoCAD SHX Text
VP
AutoCAD SHX Text
MW
AutoCAD SHX Text
SBL
ABAND.
FORT CONSTITUTION
SULLIVAN LANE
PISCATAQUA RIVER
ATLANTIC OCEAN
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
CI
VI
L
EX
IS
TI
NG
S
IT
E
PL
AN
BULKHEADS, RIP-RAP,
WAVE SCREEN, AND
FLOATING DOCK
C-101
P1
P1
2C
1.
dw g
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
LL
OY
D-
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
DO
UC
ET
S
UR
VE
Y
NE
W M
AR
KE
T, N
H
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
US COAST GUARD
CIVIL ENGINEERING
EXISTING SITE PLAN
NOTE:
1. SEE SHEET C-001 FOR EXISTING SITE PLAN NOTES AND SYMBOLS.
AutoCAD SHX Text
STORAGE CONTAINER
AutoCAD SHX Text
HORSESHOE PIT
AutoCAD SHX Text
GRAN. QUAY WALL (TYP.)
AutoCAD SHX Text
CONC. BLOCK QUAY WALL
AutoCAD SHX Text
GRAN. BLOCK WALL
AutoCAD SHX Text
STONE PILE (TYP.)
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text
TBM 8965A MAG NAIL SET IN LEDGE OUTCROP ELEV.=14.17'
AutoCAD SHX Text
ANTENNA
AutoCAD SHX Text
COND. (TYP.)
AutoCAD SHX Text
STORAGE CONTAINER
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text
SWING GATE (TYP.)
AutoCAD SHX Text
SLIDING GATE (TYP.)
AutoCAD SHX Text
DUMPSTERS
AutoCAD SHX Text
CONC. BLOCK RET. WALL
AutoCAD SHX Text
PROPANE TANK
AutoCAD SHX Text
ELECTRIC PANEL
AutoCAD SHX Text
PIPE (TYP.)
AutoCAD SHX Text
UTILITY BOX
AutoCAD SHX Text
SECURITY CAMERA POST
AutoCAD SHX Text
WATER UTILITY CABINET
AutoCAD SHX Text
SBL
AutoCAD SHX Text
GATE CONTROL BOX
AutoCAD SHX Text
STONE & BRICK WALL
AutoCAD SHX Text
STONE & BRICK WALL
AutoCAD SHX Text
~HELICOPTER PAD~
AutoCAD SHX Text
FUEL TANKS
AutoCAD SHX Text
DECK
AutoCAD SHX Text
GANGWAY
AutoCAD SHX Text
COLLAPSED QUAY WALL
AutoCAD SHX Text
GANGWAY
AutoCAD SHX Text
TH=12.8'
AutoCAD SHX Text
GANGWAY
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
BOATHOUSE
AutoCAD SHX Text
WALKWAY
AutoCAD SHX Text
GRAN. BLOCK WALL
AutoCAD SHX Text
ENGINEERING BUILDING
AutoCAD SHX Text
SAR BUILDING
AutoCAD SHX Text
UNH BUILDING
AutoCAD SHX Text
KEEPER'S QUARTERS
AutoCAD SHX Text
OLD OIL HOUSE
AutoCAD SHX Text
SHED
AutoCAD SHX Text
MULTI MISSION BUILDING
AutoCAD SHX Text
AUX SHED
AutoCAD SHX Text
BUILDING OVERHANG
AutoCAD SHX Text
QUAY WALL FOOTING
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
GATE CALL BOX
AutoCAD SHX Text
LUMBER PILE
AutoCAD SHX Text
~ROCKY SHORELINE~
AutoCAD SHX Text
~ROCKY SHORELINE~
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
~PAVED PARKING~
AutoCAD SHX Text
~PAVED PARKING~
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
EP
AutoCAD SHX Text
TMB
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SWL
AutoCAD SHX Text
SYL
AutoCAD SHX Text
SYL
AutoCAD SHX Text
~PAVED DRIVE~
AutoCAD SHX Text (A)
AutoCAD SHX Text CB 2467 RIM ELEV.=9.6' SUMP ELEV.=5.4' (2468) 12" RCP INV.=5.6' (A) 12" CMP INV.=5.4'
AutoCAD SHX Text
SMH 1949 RIM ELEV.=13.4' ABANDONED STRUCTURE & LINES
AutoCAD SHX Text
TAX MAP 19, LOT 2-2
AutoCAD SHX Text
TAX MAP 19, LOT 2
AutoCAD SHX Text
TAX MAP 19, LOT 3
AutoCAD SHX Text
(2)ES
AutoCAD SHX Text
(2)ES
AutoCAD SHX Text
ACCESS HATCH (TYP.)
AutoCAD SHX Text
ABAND.
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
ABAND.
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
ABAND.
AutoCAD SHX Text
ABAND.
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
EOI
AutoCAD SHX Text
TMB
AutoCAD SHX Text
EOI
AutoCAD SHX Text
VOLLEYBALL COURT
AutoCAD SHX Text
FF=10.7' (ARCHED DOORWAY IN FORTRESS WALL)
AutoCAD SHX Text
UPPER EDGE OF RIP-RAP
AutoCAD SHX Text
EQUIPMENT SHED
AutoCAD SHX Text
HAZARDOUS WASTE STORAGE
AutoCAD SHX Text
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
SCALE: 1"=30'
35'
0+
0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 1+98
REMOVE AND REPLACE EXISTING FENCE
ALONG NORTH REVETMENT (APPROX. 180 LF)
MHW (EL. 4.0')
CHINK AND REPOINT FACE OF STONE QUAY
WALL (APPROX. 200 LF OF WALL)
REPAIR EXISTING REVETMENT (APPROX.
250 CY OF CLASS III REVETMENT STONE)
(APPROX. 130 CY OF BEDDING STONE)
EXISTING ELECTRICAL
EQUIPMENT PADS
EXISTING SIDEWALK
EXISTING GABIONS TO REMAIN
EXISTING FUEL TANK
ENG BLDG
SAR BLDG
PROVIDE CONCRETE CLOSURE WALL
AND REPAIR SINKHOLES/ VOIDS IN
DUMPSTER PAD AREA
REMOVE AND REPLACE PAVEMENT AT EDGE
OF PARKING LOT TO REPAIR SINKHOLES. SEE
TYPICAL PAVING DETAIL A8 ON SHEET C-502.
ASSUME UP TO 2 CY OF SUPPLEMENTAL FILL
WILL BE REQUIRED BELOW BASE COURSE.
16'
REMOVE AND REPLACE EXISTING FENCE
ALONG NORTH QUAY WALL APPROX. 220 LF)
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+63
REMOVE EXISTING LOOSE BLOCKS AND
PROVIDE CLASS VII RIPRAP TO CREATE
INTERIM BERM FROM STA 2+30 TO STA 3+40
(APPROX. 700 CY)FILL MISSING BOTTOM COURSE
OF WALL WITH REINFORCED
CONCRETE (APPROX. 10 CY)
BID OPTION 1: PROVIDE ADDITIONAL
CLASS VII RIPRAP REVETMENT ALONG
UNPROTECTED SLOPE. LIMITS SHOWN
ARE APPROXIMATE. REVETMENT TO
EXTEND WEST UNTIL TOP OF
REVETMENT (AT EL. +15.0') MEETS
EXISTING GRADE (APPROX. 150 CY)
RESET APPROX. 2 DISPLACED WALL
BLOCKS AT STA 2+40 (APPROX.10 LF)
EXCAVATE AND BACKFILL SINKHOLES
BEHIND QUAYWALL (APPROX. 60 CY)
BOTTOM TWO COURSES OF EXISTING BLOCK
WALL TO REMAIN IN PLACE AND DOWELED INTO
UNDERLYING HARDPAN/LEDGE
REMOVE EXISTING REMNANT BLOCKS FROM FAILED
WALL (TYP, APPROX. 50 BLOCKS) AND USE WHERE
DESIGNATED FOR REUSE AS SHOWN. PLACE
SURPLUS BLOCKS IN DESIGNATED REMNANT
STONE STOCKPILE AREA.
53'-0"±
(SEE NOTE 3)
16'-5"±
(SEE NOTE 3)
20'
REMNANT STONE
STOCK PILE
REUSE EXISTING STONE
BLOCKS TO FORM STEPPED
SIDE SLOPE CONTAINMENT
FOR BERM (TYP)
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20
2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+12
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
CI
VI
L
QU
AY
W
AL
L
RE
PA
IR
P
LA
N
BULKHEADS
AND RIP-RAP
C-102
P1
P1
2C
2.
dw g
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
LL
OY
D-
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
US COAST GUARD
CIVIL ENGINEERING
NORTH QUAY WALL REPAIR
SOUTH QUAY WALL REPAIR
NOTES
1. THE EXISTING ELECTRICAL AND TELECOMMUNICATION UTILITIES LOCATED WITHIN THE LIMITS OF WORK SHALL BE TEMPORARILY SUPPORTED AND PROTECTED DURING THE WORK, OR REMOVED, SALVAGED, AND REINSTALLED. UTILITIES THAT ARE DAMAGED AS A RESULT OF THE WORK SHALL BE REPLACED BY THE
CONTRACTOR, AT NO ADDITIONAL COST TO THE GOVERNMENT.
2. REFER TO THE UTILITY NOTES ON SHEET G-002 AND THE PROJECT SPECIFICATIONS FOR UTILITY AND FUEL
LINE OUTAGE REQUIREMENTS.
3. THE EXCAVATION LIMITS SHOWN ARE APPROXIMATE. THE ACTUAL LIMITS OF EXCAVATION WILL BE BASED ON THE MEANS AND METHODS OF CONSTRUCTION DETERMINED BY THE CONTRACTOR, AS NECESSARY TO PERFORM THE SINKHOLE REPAIRS TO THE MINIMUM LIMITS REQUIRED, AND MAINTAIN A SAFE EXCAVATION
AND STABLE SLOPE.
C-502 A1
C-501 A1
C-501 A6
D1 C-503
AutoCAD SHX Text
SBL
AutoCAD SHX Text
WOOD PILING (TYP. OF AREA)
AutoCAD SHX Text
MULTI-MISSION BLDG
AutoCAD SHX Text C-302
AutoCAD SHX Text E1
AutoCAD SHX Text C-302
AutoCAD SHX Text E5
AutoCAD SHX Text
AutoCAD SHX Text 10'
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SCALE: 1"=20'
AutoCAD SHX Text
AutoCAD SHX Text 10'
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SCALE: 1"=20'
AutoCAD SHX Text C-301
AutoCAD SHX Text E5
AutoCAD SHX Text C-301
AutoCAD SHX Text A5
AutoCAD SHX Text C-301
AutoCAD SHX Text E1
AutoCAD SHX Text C-302
AutoCAD SHX Text A1
AutoCAD SHX Text C-302
AutoCAD SHX Text A5
AutoCAD SHX Text C-301
A1
0.
2.56%
2.99%
2.95% 5.12%
-7.47%
-5.12%
5.12% -11.75%
-694.05%
-557.45%
-44.66%
-53.33%
-25.75%
-29.21%
-45.04%
GEOTEXTILE FILTER FABRIC
(BELOW SUPPLEMENTAL RIP RAP)
EXISTING REVETMENT TO
REMAIN (BELOW MHW)
EXISTING ROCKFILLED
GABION BASKET TO REMAIN
EXISTING GRADE
EXISTING FENCE TO BE REMOVED
AND REPLACED WITH 8-FT HIGH
CHAIN LINK FENCE
MHW = 4.0'
MLW = -4.6'
ELECTRIC AND CABLE UTILITIES TO
REMAIN AND TO BE PROTECTED
DURING CONSTRUCTION, LOCATION
IS APPROXIMATE (SEE NOTE 2)
TOP OF REVETMENT EL. =11.0'
2' THICK CLASS III REVETMENT
SLOPE
APPROXIMATE EXISTING
SLOPE. EXCAVATE AS
NEEDED TO PLACE NEW
REVETMENT
0.
2.43% 2.38%
2.32% 3.04% 3.58% -0.72% 0.74% 0.43% -0.43%
-67.49%
-49.86%
-49.72%
-18.15%
-33.67%
-29.21%
-45.04%
-30.50%
0.
2.43% 2.38%
2.32% 3.04% 3.58% -0.72% 0.74% 0.43% -0.43%
-67.49%
-49.86%
-49.72%
-18.15%
-33.67%
-29.21%
-45.04%
-30.50%
REVETMENT TOE EL. =7.0'
GEOTEXTILE FILTER FABRIC (BELOW BEDDING
LAYER, IN BETWEEN TOP AND BOTTOM
LAYERS, WRAPPING UP TOE STONE, MIN. 18")
3.5' DIA (MIN) TOE
STONE
1' THICK BEDDING LAYER
1V:2H (MIN) 2' THICK CLASS
III REVETMENT SLOPE
EXISTING REVETMENT TO
REMAIN (BELOW MHW)
EXISTING GRADE EXISTING FENCE TO BE
REMOVED AND REPLACED WITH
8-FT HIGH CHAIN LINK FENCE
MHW = 4.0'
MLW = -4.6'
ELECTRIC AND CABLE
UTILITIES TO REMAIN AND TO
BE PROTECTED DURING
CONSTRUCTION, LOCATION IS
APPROXIMATE (SEE NOTE 2) TOP OF REVETMENT EL. =13.0'
APPROXIMATE EXISTING
SLOPE. EXCAVATE AS
NEEDED TO PLACE NEW
REVETMENT
EXTEND GEOTEXTILE TO GRADE
0.
4.99%
1.85% -2.36% -1.29%
4.76%
5.68% -16.28%13.09%8.11% 6.76% 6.73%
-6.73%
-9.49%
-34.86%
-35.36%-28.72%-58.88%-24.47%
-24.63%
-37.95%
-46.71%
-47.69%
-28.01%
0.
EXISTING FENCE TO BE
REMOVED AND REPLACED WITH
8-FT HIGH CHAIN LINK FENCE
EXISTING GRADE
GEOTEXTILE FILTER FABRIC (BELOW BEDDING
LAYER, IN BETWEEN TOP AND BOTTOM LAYERS,
WRAPPING UP TOE STONE, MIN. 18")
EXISTING REVETMENT
TO REMAIN (BELOW MHW)
3.5' DIA (MIN) TOE STONE
1V:2H (MIN) 2' THICK CLASS III
REVETMENT SLOPE2'-6"±
2 (MIN)
REVETMENT TOE EL. =7.0'
MHW = 4.0'
MLW = -4.6'
ELECTRIC AND CABLE UTILITIES TO
REMAIN AND TO BE PROTECTED
DURING CONSTRUCTION, LOCATION IS
APPROXIMATE (SEE NOTE 2)
1' THICK BEDDING LAYER
TOP OF REVETMENT EL. =13.0'
4.99%
1.85% -2.36% -1.29%
4.76%
5.68% -16.28%13.09%8.11% 6.76% 6.73%
-6.73%
-9.49%
-34.86%
-35.36%-28.72%-58.88%-24.47%
-24.63%
-37.95%
-46.71%
-47.69%
-28.01%
APPROXIMATE EXISTING SLOPE.
EXCAVATE AS NEEDED TO PLACE
NEW REVETMENT
REMOVE AND REPLACE
PAVEMENT TO REPAIR SINKHOLE
IN PARKING AREA (SEE NOTE 4)
EXTEND GEOTEXTILE TO GRADE
-9 .9
-8 .2
0.
1.60% 2.14% 5.72%
5.49%
-9.92%
9.92%
8.85%
-45.57%
-44.90%
-28.13%
-8.72%
-6.03%
-49.01%
-44.04%
-28.61%
-9 .9
-8 .2
0.
1.60% 2.14% 5.72%
5.49%
-9.92%
9.92%
8.85%
-45.57%
-44.90%
-28.13%
-8.72%
-6.03%
-49.01%
-44.04%
-28.61%
2'-6"±
EXISTING FENCE TO BE
REMOVED AND REPLACED WITH
8-FT HIGH CHAIN LINK FENCE
GEOTEXTILE FILTER FABRIC (BELOW BEDDING LAYER,
IN BETWEEN TOP AND BOTTOM LAYERS, WRAPPING
UP BACK OF TOE STONE, MIN. 18")
3.5' DIA (MIN) TOE
STONE
1' THICK BEDDING LAYER
1V:2H (MIN) 2' THICK
CLASS III REVETMENT
SLOPE
EXISTING REVETMENT TO
REMAIN (BELOW MHW)
EXISTING GRADE REVETMENT TOE EL. =7.0'
2 (MIN)
MHW = 4.0'
MLW = -4.6'
ELECTRIC AND CABLE UTILITIES TO
REMAIN AND TO BE PROTECTED
DURING CONSTRUCTION, LOCATION IS
APPROXIMATE (SEE NOTE 2)
TOP OF REVETMENT EL. =13.0'
APPROXIMATE EXISTING SLOPE.
EXCAVATE AS NEEDED TO PLACE
NEW REVETMENT
EXTEND GEOTEXTILE TO GRADE
DE
SI
GN
ED
B Y:
DE
SC
RI
PT
IO
N
M
AR
K
ED
IT
ED
B Y:
DA
TE
CH
EC
KE
D
BY
DR
AW
N
BY
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SH
EE
T
OF
US
CG
P
RO
JE
CT
N
UM
BE
R
US
CG
F
IL
EN
AM
E
A/ E
CO
M
PA
NY
CO
NS
UL
TI
NG
A
/E
US
CG
P
RO
JE
CT
M
AN
AG
ER
A/
E
PR
OJ
EC
T
NO
SHEET ID
M
EA
SU
RE
M
EN
T
BA
R:
1"
HA
LF
S
IZ
E
1/ 2"
US
CG
D
RA
W
IN
G
SE
RI
ES
N
UM
BE
R
RE
PA
IR
W
AT
ER
FR
ON
T
- P
HA
SE
CG
S
TA
P
OR
TS
M
OU
TH
H
AR
BO
R
NE
W
C
AS
TL
E
NH
CI
VI
L
NO
RT
H
RI
P-
RA
P
RE
PA
IR
S
EC
TI
ON
S
BULKHEADS
AND RIP-RAP
C-301
P1
P1
2C
1.
dw g
US
CG
C
IV
IL
E
NG
IN
EE
RI
NG
U
NI
T
PR
OV
ID
EN
CE
KI
LV
ER
T
ST
, S
UI
TE
W
AR
W
IC
K, R I 0
DA
VI
D J.
AR
PI
N, P
.E
Z.
JE
NK
IN
S J.
DE
L
TU
FO
M .S
CH
M
ID
D.
O 'C
ON
NO
R
LL
OY
D-
CO
LL
IN
S
JV
BE
LL
AI
RE
, T
EX
AS
(8
) 4
-4
LC
JV
-1
IS
SU
ED
F
OR
B
ID
DI
NG
NO
V
US COAST GUARD
CIVIL ENGINEERING
RIP-RAP SECTION - STA 0+34E1
RIP-RAP SECTION - STA 0+85A1
RIP-RAP SECTION - STA 0+47E5
RIP-RAP SECTION - STA 1+29A5
NOTES
1. THE INTENT OF THE BEDDING LAYER AND RIPRAP SLOPE SHOWN IS TO IMPROVE PROTECTION AND STABILIZATION OF THE ERODED SHORELINE AREA, LOCATED ABOVE MEAN HIGH WATER. THE EXISTING SLOPE IN THIS AREA SHALL BE EXCAVATED AND PREPARED TO SET THE TOE STONES, BEDDING LAYER, AND RESTORED SLOPE PROTECTION AS SHOWN ON THE DRAWINGS. IN THE EVENT THAT LEDGE OUTCROPPINGS ARE PRESENT THAT INTERFERE WITH THE PROPOSED BEDDING AND RIPRAP LAYERS SHOWN, THE BEDDING LAYER THICKNESS MAY BE REDUCED, OR TERMINATED IN THE AREA OF INTERFERENCES, TO FACILITATE CONSTRUCTION AND MAINTAIN A CONSISTENT REVETMENT FACE. IF THE BEDDING LAYER IS TERMINATED AT THESE AREAS, THE GEOTEXTILE LAYERS FOR THE SURROUNDING BEDDING SHALL BE TURNED BACK A MINIMUM 18 INCHES TO PREVENT LOSS OF BEDDING MATERIAL.
2. THE EXISTING ELECTRICAL AND TELECOMMUNICATION UTILITIES LOCATED WITHIN THE LIMITS OF WORK SHALL BE TEMPORARILY SUPPORTED AND PROTECTED DURING THE WORK, OR REMOVED, SALVAGED, AND REINSTALLED. UTILITIES THAT ARE DAMAGED AS A RESULT OF THE WORK SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL COST TO THE GOVERNMENT.
3. EXISTING GRADE LINE IS SHOWN FOR REFERENCE. CONTRACTOR SHALL REMOVE EXISTING REVETMENT STONE, RUBBLE, VEGETATION, AND SOIL WITHIN THE LIMITS OF THE NEW REVETMENT AS NECESSARY TO COMPLETE THE WORK. EXISTING STONE MEETING THE GRADATION REQUIREMENTS MAY BE USED TO SUPPLEMENT THE NEW REVETMENT STONE. EXISTING STONES ALREADY ESTABLISHED IN THE INTENDED TOE STONE LOCATION, AND MEETING THE TOE STONE SIZE REQUIREMENTS, MAY REMAIN IN PLACE.
4. REMOVE EXISTING PAVEMENT AND EXISTING BASE COURSE IN THE LIMITS OF SINKHOLE REPAIRS TO A MINIMUM TOTAL DEPTH OF 10" BELOW TOP OF FINISH PAVEMENT.
This is the start of the file's text. The full file is on GovTribe.