Attachment 2 - Repair Interior Finishes Vosler B2602 - Specs.pdf
PDF 321 KB Posted
- Attached to
- Repair Interior Finishes Vosler
- Solicitation number
- FA301023R0033
About this file
This document contains specifications for interior finishes repair work at Vosler Center under solicitation number FA301023R0033 from the Department of the Air Force Air Education and Training Command. The specifications cover resilient flooring accessories, carpet tiling, rubber wall base, paint, corner guards, and high impact surface mount corner guards. Key requirements include carpet, flooring, and wall products from manufacturers holding Tier 1 contracts with the Air Force Furnishings Commodity Council including Bentley Mills, Engineered Floors, Interface Americas, Mannington, Milliken, Mohawk, and Tarkett. The specifications provide product data, samples, and instructions for preparation, installation and cleaning of these interior finishes.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR INTERIOR FINISHES B2602
VOSLER CENTER
08 JUNE 2023
PROJECT NUMBER:
MAHG231026
KEESLER AIR FORCE BASE
BILOXI, MISSISSIPPI
Keesler AFB 508 L Street Keesler AFB, MS 39534
FA301023R0033
Attachment #2
09 65 01_1/2
SECTION 09 65 01
RESILIENT FLOORING ACCESSORIES
PART I - GENERAL
1.01 DESCRIPTION
A. The work required under this Section consists of all resilient flooring accessories and related items to complete the work as indicated and the Drawings and described in the Specifications.
1.02 MANUFACTURER
A. For purposes of designating type and quality for the work under this Section, Drawings and Specifications for resilient accessories are based on products manufactured or furnished by Armstrong Cork Company, Mannington, Tarkett, or equal.
1.03 HANDLING AND STORAGE
A. Deliver materials to job site in manufacturer's original unopened containers clearly marked with manufacturer's brand name, color, and pattern numbers, and production run color code.
B. Take care to prevent damage and freezing during delivery, handling and storage. Store materials at site for at least 24 hours before installation.
PART 2 - MATERIALS
2.01 ACCESSORIES
A. Provide 1/8 inch thick x 1-1/4 inch wide vinyl transition strips at all areas where flooring transitions from one (1) type to another, at all doorways, and at all locations where the direction of flooring changes orientation. Transition strips shall be kept to a minimum and only used where conditions require. The Contracting Officer (CO) shall have final authority over locations and quantities of transition strips.
B. Provide shop drawing of carpet tile pattern plan, to include transition strips, to the CO for approval.
PART 3 - EXECUTION
3.01 PREPARATION
A. Prepare existing surfaces as recommended by manufacturer.
B. All cracks, rough areas, low areas, or other surface defects shall be filled with plastic compound made for this use as recommended by flooring manufacturer. High areas shall be ground down with abrasive machine.
C. Verify the acceptability of surfaces to receive finishes and notify the Architect in writing of any conditions which would prevent the proper installation of the flooring or ease. Commencement of installation will constitute acceptance of all conditions affecting installation.
3.02 CONDITIONS
09 65 01_2/2
A. Maintain temperature of spaces where flooring materials are both stored and are to be installed at not less than 70 F nor more than 90 F for at least 24 hours before, and 48 hours after, installation.
Thereafter, maintain temperature above 55 F.
B. Where solvent based adhesives are used, safety spark-proof fans shall be provided and operated when ventilation is inadequate. Smoking shall be prohibited.
3.03 INSTALLATION
A. Mix and apply adhesive in accordance with manufacturer's instructions. Cover area evenly and only to the extent which can be covered with resilient material in recommended working time of adhesive.
Remove adhesive that dries or films over. Apply with trowel, notched according to manufacturer's recommendations. Clean and rework trowel notches as necessary to insure proper application of adhesives. Do not soil adjacent materials or areas with adhesive.
B. Install transition strips and other accessories as flooring installation progresses, and in accordance with the manufacturer's recommendations.
3.04 CLEANING AND WAXING
A. After transition strip has sufficiently seated, the entire surface shall be thoroughly cleaned as recommended by the manufacturer to remove all cement spots, dirt and other soiling, so that surface will be entirely satisfactory for waxing. The use of solvents is prohibited.
END OF SECTION
09 65 13_1/3
SECTION 09 65 13
RUBBER WALL BASE
PART 1 GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Rubber wall base
1.2 SUBMITTALS
A. Submit under provisions of the Statement of Work.
B. Product Data: Manufacturer's data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation methods.
C. Verification Samples: For each finish product specified, two samples, representing actual product and finish.
D. Extra Stock: Submit extra stock equal to 2% of total installed.
1.3 QUALITY ASSURANCE
A. Manufacturer Qualifications: Minimum 5 year experience manufacturing similar products.
B. Installer Qualifications: Minimum 2 year experience installing similar products.
C. Performance: Fire performance meeting requirements of building code and local authorities.
1.4 PRE-INSTALLATION MEETINGS
A. Convene minimum two weeks prior to starting work of this section.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver and store products in manufacturer's unopened packaging bearing the brand name and manufacturer's identification until ready for installation.
B. Handling: Handle materials to avoid damage.
1.6 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits.
1.7 SEQUENCING
A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
PART 2 PRODUCTS
2.1 Rubber Wall Base – Specification based on Mohawk Group / Elemental Edges Wall Base, Rubber Wall Base product – submittal required by Contractor - must meet or exceed the criteria
09 65 13_2/3 put forth in this specification.
2.2 Manufacturer: Mohawk Group, Or Approved Equal
2.3 Product Description:
1.2.1 Architectural Base : AWB04 - tapered
wave. color: dove - # 053
a. 1.2.2 Physical Characteristics:
i. Rubber Wall Base: Elemental Edges Wall Base, 5.5" height.
2.0 PRODUCT PERFORMANCE AND TECHNICAL DATA
A. Meets or exceeds the performance requirements for resistance to heat/light aging, chemicals, and dimensional stability when tested to the methods, as described, in ASTM F-1861.
B. Flexibility: Will not crack, break, or show any signs of fatigue when bent around a 1/4" (6.4
mm) diameter cylinder.
C. Chemical resistance (ASTM F 925): Passes – 5% acetic acid, 70% isopropyl alcohol, mineral oil, 5% sodium hydroxide solution, 5% hydrochloric acid solution, 5% sulfuric acid solution, 5% household ammonia solution, and 5.25% household bleach solution.
D. Resistance to light (ASTM F 1515): ΔE< 8
E. Fire Resistance: Rubber Wall Base
1. ASTM E 84/NFPA 255 (Flame/Smoke) – Class A, < 450
2. ASTM E 648 (NFPA 253): Critical Radiant Flux –
Class I PART 2 EXECUTION
2.1 EXAMINATION
A. Do not begin installation until substrates have been properly prepared.
B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.
2.2 PREPARATION
A. Clean surfaces thoroughly prior to installation.
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
2.3 INSTALLATION
A. Install in accordance with manufacturer's instructions and in proper relationship with adjacent construction. Test for proper operation and adjust until satisfactory results are obtained.
B. Comply with recommendations of Carpet and Rug Institute 'Specifier's Handbook'. PROTECTION Protect installed products until completion of project.
Touch-up, repair or replace damaged products before Substantial Completion.
09 65 13_3/3
09 68 13_1/6
SECTION 09 68 13
TILE CARPETING
PART1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including the Statement of Work
(SOW).
1.2 SUMMARY
A. Section includes modular, carpet tile.
1.3 PREINSTALLATION MEETINGS
A. Pre-installation Conference:
1. Review methods and procedures related to carpet tile installation including, but not limited to, the following:
a. Review delivery, storage, and handling procedures.
b. Review ambient conditions and ventilation procedures.
c. Review subfloor preparation procedures, to include concrete testing and remediation per material manufactures requirements, to be included in installation.
d. Follow manufacturer's modular carpet installation guidelines and/or Carpet & Rug Institute Installation Standard (the most recent version), where applicable.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include manufacturer's written specifications and lab documents for any physical testing, to include any concrete substrate remediation requirement.
2. Include installation recommendations for each type of substrate as specified in carpet manufacturer's installation guidelines and/or Carpet & Rug Institute Installation Standard (the most recent version), where applicable.
3. Include carpet maintenance recommendations as outlined by carpet manufacturer.
4. Carpet Manufacturer shall also submit a plan for recycling the specified carpet at the end of the useful life of the carpet.
B. Samples: For each of the following products and for each color and texture required.
Label each Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules.
1. Carpet Tile: Full-size Sample.
2. Exposed Edge, Transition, and Other Accessory Stripping: 12-inch long Samples.
C. Product Schedule: For carpet tile. Use same designations indicated on Drawings.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
B. Product Test Reports: For carpet tile, for tests performed by a qualified independent testing agency.
C. Substrate Test Reports: for material required Ph and moisture content in concrete.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: For carpet tiles to include in maintenance manuals. Include the
09 68 13_2/6 following:
1. Methods for maintaining carpet tile, including cleaning and stain-removal products and procedures and manufacturer's recommended maintenance schedule.
2. Precautions for cleaning materials and methods that could be detrimental to carpet tile.
1.7 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Carpet Tile: Full-size units equal to 5 percent of amount installed for each type indicated, but not less than 10.67 sq. yd.
1.8 QUALITY ASSURANCE
A. Contractor must comply with mandatory use Air Force Furnishings Commodity Council Tier 1 contracts manufacturers. The Carpet Program is covered under North American Industry Classification System (NAICS) code 314110 - Carpet and Rug Mills. The Product Service Code (PSC) for the Carpet Program is 7220 – Floor Coverings.
1.9 DELIVERY, STORAGE, AND HANDLING
A. Comply with carpet manufacturer's installation recommendations and the Carpet & Rug
Institute Installation Standard (the most recent version), where applicable.
1.10 FIELD CONDITIONS
A. Comply with carpet manufacturer's installation recommendations and the Carpet & Rug Institute Installation Standard (the most recent version) for temperature, humidity, and ventilation limitations.
B. Environmental Limitations: Do not deliver or install carpet tiles until spaces are enclosed and weather-tight, wet work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at occupancy levels during the remainder of the construction period.
C. HVAC system should be operational and running prior to carpet installation and remain running after carpet installation.
D. Do not install carpet tiles over concrete slabs until slabs have cured and are sufficiently dry to allow bond between adhesive and concrete. Concrete slabs should have moisture and have pH readings that are within the specified tolerance of the adhesive to be used.
Any required substrate remediation shall be included in installation.
E. Where demountable partitions or other items are indicated for installation on top of carpet tiles, install carpet tiles before installing these items.
1.11 WARRANTY
A. Special Warranty for Carpet Tiles: Manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period.
1. Warranty does not include deterioration or failure of carpet tile due to unusual traffic, failure of substrate, vandalism, or abuse.
2. If substrate remediation is performed, warranty shall be per material manufacturers guidelines.
3. Failures include, but are not limited to, more than 10 percent face fiber loss, edge
09 68 13_3/6 raveling, dimensional instability, excess static discharge, loss of tuft bind strength, delamination, and where face fiber is 100 percent solution dyed, inability to remove acid based stains, lack of colorfastness to light, and lack of colorfastness to atmospheric contaminants.
4. Carpet and fiber must be manufactured and warrantied by same manufacturer.
5. Warranty Period: Lifetime Commercial Limited Warranty.
2.1 MANFACTURERS:
A. Carpet Tile/plank: Shall comply with mandatory use Air Force Furnishings Commodity Council carpet ordering. Carpet shall be acquired by a small business installer, dealer, or contractor using the following mandatory manufacturers holding Tier 1 contracts:
Approved manufacturers:
1. Bentley Mills:
Contract #: FA8003-23-C-0009 POC: Mindy Dever Office: 626-934-2461 Mobile: 859-536-7846 Email: mindy.dever@bentleymills.com
2. Engineered Floors:
Contract #: FA8003-23-C-0004 POC: Debra Ramsey Phone: 800-241-4586 x88392 Email: contract.team@engineeredfloors.com
3. Interface Americas:
Contract #: FA8003-23-C-0005 POC: Jay Lanier Phone: 800-634-6032 / 336-749-1304 Email: james.lanier@interface.com Website: https://www.interface.com/US/en-US/homepage
4. Mannington:
Contract #: FA8003-23-C-0006 POC: Jody Steger Phone: 800-2412262 Email:
Website: www.manningtoncommercial.com
5. Milliken:
Contract #: FA8003-23-C-0008 POC: Tammy Drake Phone: 706-880-5727 Email: GovOrders@millican.com
6. Mohawk:
Contract: FA8003-23-C-0003 POC: Sergio Blanco Phone: 800-554-6637 Email: contract_compliance@mohawkind.com, Strategic Account Code: 14459 mailto:mindy.dever@bentleymills.com mailto:contract.team@engineeredfloors.com mailto:james.lanier@interface.com https://www.interface.com/US/en-US/homepage http://www.manningtoncommercial.com/ mailto:GovOrders@millican.com mailto:contract_compliance@mohawkind.com
09 68 13_4/6
7. Tarkett:
Contract #: FA8003-23-C-0007 POC: Angie Micik Phone: 706-260-3094 Email: angie.micik@tarkett.com
B. Contractor to provide selections from the following Manufacturer’s pattern / style, or equal, for Base selection:
1. Contractor to choose one of the following: Bentley Mills: Drumline 4DMT40AA1K;
Engineered Floors: Indew; Interface Americas: Brescia; Mannington: Exchange 2; Millikin: Nordic Stories; Mohawk: BT355 Riot QS Tile; Tarket: Squareup II 11649. List Manufacturer, pattern and style (include manuf. Product numbers).
2. All selections must comply with the mandatory use Air Force Furnishings
Commodity Council Tier 1 contracts.
C. Color must be chosen by owner. Confirm pattern / style and color with Contracting Officer. Install per manufacturer recommendations and instructions. Provide attached cushion backing in compliance with NSF/ANSI 140 sustainability standards. Provide low VOC wet adhesive, moisture proof, thermoplastic hard or thermoset backing option with a maximum thickness no greater than 0.250” for modular carpet tile.
2.2 INSTALLATION ACCESSORIES
A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer.
B. Trowelable Adhesives: Water-resistant, mildew-resistant, nonstaining, premium grade pressure-sensitive type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet tile and is recommended by carpet tile manufacturer for releasable installation.
1. Adhesives shall have a VOC content of 50 g/L or less when calculated according to
40 CFR 59, Subpart D (EPA Method 24).
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for maximum moisture content, alkalinity range, installation tolerances, and other conditions affecting carpet tile performance. Examine carpet tile for type, color, pattern, and potential defects prior to installation. See manufacturer's requirements for substrate conditions and ambient conditions and remediation requirements, to be included in the installation of material.
B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following:
1. Slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond. Determine adhesion and dryness characteristics by performing moisture and pH tests as recommended by carpet tile manufacturer and any remediation required shall be included in the installation.
2. Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits.
3. Lightweight concrete and gypcrete subfloors may require a primer. Provide and install primer as recommended by the flooring manufacture to reduce surface porosity.
4. Where previous surface treatments are unknown, or where other concerns exist as to the ability of the adhesive to bond to the substrate, a 24 hour bond test is mailto:angie.micik@tarkett.com
09 68 13_5/6 recommended.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. General: Comply with Carpet & Rug Institute Installation Standard (the most recent version), "Site Conditions; Floor Preparation," and with carpet tile manufacturer's written installation instructions for preparing substrates indicated to receive carpet tile installation, to include any remediation required by manufacturer.
B. Use trowelable leveling and patching compounds that contain a cementitious base with a latex additive, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider and protrusions more than 1/32 inch unless more stringent requirements are required by manufacturer's written instructions.
C. Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by carpet tile manufacturer.
D. Broom and vacuum clean substrates to be covered immediately before installing carpet tile.
3.3 INSTALLATION
A. General: Comply with Carpet & Rug Institute Installation Standard (the most recent version), "Carpet Modules," and with carpet tile manufacturer's written installation instructions, to include any required substrate remediation.
B. Installation Method: Glue down; install every tile with full-spread, releasable, pressure-sensitive adhesive or with a non-spreadable dry adhesive system, such as LokDots. Any non-spreadable adhesive system must adhere the carpet to the substrate.
C. Maintain dye lot integrity. Do not mix dye lots in same area unless the specific carpet tile style is manufactured as a merge-able dye lot product.
D. Cut and fit carpet tile to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet tile manufacturer.
E. Extend carpet tile into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.
F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on finish flooring as marked on subfloor. Use nonpermanent, non-staining marking device.
G. Install pattern parallel to walls and borders.
H. Roll the entire installation with a 75 lb. roller once installation is completed.
3.4 CLEANING AND PROTECTION
A. Perform the following operations immediately after installing carpet tile:
1. Remove excess adhesive, and other surface blemishes using cleaner recommended by carpet tile manufacturer.
2. Remove yarns that protrude from carpet tile surface.
3. Vacuum carpet tile using commercial machine with face-beater element.
B. Protect installed carpet tile to comply with Carpet & Rug Institute Installation Standard (the most recent version), "Protecting Indoor Installations."
C. When construction or move-in activities will continue where new carpet is installed, provide non-staining building material paper to protect carpet. Do not use plastic sheeting as it can trap moisture, and self-sticking plastic sheeting can transfer adhesive residue to carpet that will attract soil.
D. When heavy objects are moved over carpet within 24 hours of installation, use plywood
09 68 13_6/6 over carpet to prevent buckling and wrinkling.
E. Protect carpet tile against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by carpet tile manufacturer.
09 91 00_1/6
SECTION 09 91 00
PAINT
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Interior Primer.
B. Interior Paint.
C. Wall Preparation.
1.2 REFERENCES
A. MPI (APL) - Master Painters Institute.
B. SCAQMD 1168 - South Coast Air Quality Management District Rule #1168; October 3, 2003.
C. SSPC (PM1) - Steel Structures Painting Manual, Vol. 1, Good Painting Practice; Society for Protective Coatings; 1993, Third Edition.
D. SSPC (PM2) - Steel Structures Painting Manual, Vol. 2, Systems and Specifications;
Society for Protective Coatings; 1995, Seventh Edition.
E. 40 CFR 59, Subpart D - National Volatile Organic Compound Emission Standards for
Architectural Coatings; U.S. Environmental Protection Agency; current edition.
1.3 DEFINITIONS
A. Paints are available in a wide range of sheens or glosses, as measured by a gloss meter from a 60 degree angle from vertical, as a percentage of the amount of light that is reflected. The following terms are used to describe the gloss of our products.
1. Flat - Less than 5 units.
2. Matte - 0 - 10 units.
3. Eggshell - 10 - 25 units.
4. Satin - 20 - 35 units.
5. Semi-Gloss - 35 - 70 units.
1.4 SUBMITTALS
A. Submit samples in accordance with the Statement of Work.
B. Coordinate with Section 01305 - Submittals, for submittal procedures.
C. Product Data: Provide a complete list of all products to be used, with the following information for each:
1. Manufacturer's name, product name and/or catalog number, and general product category.
2. Cross-reference to specified paint system(s) that the product is to be used in;
include description of each system.
D. Samples: Submit three paper samples, 5 inches by 7 inches (127mm x 178mm) in size, illustrating selected colors for each color and system selected with specified coats cascaded.
E. Manufacturer's Instructions: Indicate special surface preparation procedures.
F. Maintenance Data: Submit data on cleaning, touch-up, and repair of painted and coated surfaces.
1.5 QUALITY ASSURANCE
09 91 00_2/6
A. Manufacturer Qualifications: a single manufacturer with a minimum of ten (10) years’ experience will supply all primary products specified in this section.
B. Installer Qualifications: All products listed in this section are to be installed by a single installer with a minimum of five (5) years demonstrated experience in installing products of the same type and scope as specified.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store products in manufacturer's unopened packaging until ready for installation.
B. Store and dispose of solvent-based materials, and materials used with solvent- based materials, in accordance with requirements of local authorities having jurisdiction.
C. Disposal:
1. Never pour leftover coating down any sink or drain. Use up material on the job or seal can and store safely for future use.
2. Do not incinerate closed containers.
3. For specific disposal or recycle guidelines, contact the local waste management agency or district. Recycle whenever possible.
1.7 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
1.8 WARRANTY
A. At project closeout, provide to the Contracting Officer an executed copy of the
Manufacturer's standard form outlining the terms and conditions of and any exclusions to their Limited Warranty against Manufacturing Defect.
1.9 EXTRA MATERIALS
A. At project closeout, supply the Contracting Officer one gallon of each product for touch-up purposes.
B. At project closeout, provide the color mixture name and code to the
Contracting Officer for accurate future color matching.
2.1 MANUFACTURERS
A. Acceptable Manufacturer:
1. Benjamin Moore & Co Approved Manufacturers
2. Sherwin Williams
3. Coronado Paints
4. Equal to.
2.2 MATERIALS – GENERAL
A. Volatile Organic Compound (VOC) Content:
1. Provide coatings that comply with the most stringent requirements specified in the following:
a. 40 CFR 59, Subpart D--National Volatile Organic Compound Emission
Standards for Architectural Coatings.
09 91 00_3/6
b. Determination of VOC Content: Testing and calculation in accordance with 40 CFR 59, Subpart D (EPA Method 24), exclusive of colorants added to a tint base and water added at project site; or other method acceptable to authorities having jurisdiction.
B. Compatibility: Provide materials that are compatible with one another, and the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.
2.3 MIXING AND TINTING
A. Except where specifically noted in this section, all paint shall be ready-mixed and pre-tinted. Agitate all paint prior to and during application to ensure uniform color, gloss, and consistency.
B. Thinner addition shall not exceed manufacturer's printed recommendations. Do not use kerosene or other organic solvents to thin water-based paints.
C. Where paint is to be sprayed, thin according to manufacturer's current guidelines.
2.4 INTERIOR PRIMERS - NEW CONSTRUCTION
A. Gypsum Board, Plaster:
1. Latex:
a. One (1) Coat - Ultra Spec® 500 Interior Latex Primer #N534 (MPI listed Product, Categories 50, 50-X, 149, 149-X)
B. Ferrous Metals:
1. Alkyd:
a. One (1) Coat - Super Spec® HP Alkyd Metal Primer #P06.
2.5 INTERIOR PRIMERS - PREVIOUSLY PAINTED SURFACES
A. Previously Painted:
a. One (1) Coat - Ultra Spec® 500 Interior Latex Primer #N534 (MPI listed Product, Categories 50, 50-X, 149, 149-X)
B. Ferrous Metals:
1. Alkyd:
a. One (1) Coat - Super Spec® HP Alkyd Metal Primer #P06.
2.6 INTERIOR FINISH COAT
A. Eggshell Finish:
1. Latex:
B. Two (2) Coats – Ultra Spec® 500 Interior Eggshell Finish N538 (MPI Listed Product
Categories 52, 52-X Green) C. Satin/Semi-Gloss Finish:
1. Latex:
a. Two (2) Coats – Ultra Spec® 500 Interior Semi-Gloss Finish N539 (MPI Listed
Product Categories 43, 43-X Green)
b. Two (2) Coats Ultra Spec® 500 Interior Gloss Finish N540 (MPI Listed Product
Categories 54, 54-X Green) D. High Gloss Finish:
1. Latex:
a. Two (2) Coats Ultra Spec® 500 Interior Gloss Finish N540 (MPI Listed Product
Categories 54, 54-X Green) E. High Gloss Finish (Metals):
a. Two (2) Coats Super Spec HP® D.T.M. Acrylic Gloss Enamel P28
09 91 00_4/6
(MPI Listed #114, 154)
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin installation until substrates have been properly prepared.
B. Ensure that surfaces to receive paint are dry immediately prior to application.
C. Ensure that moisture-retaining substrates to receive paint have moisture content within tolerances allowed by coating manufacturer. Where exceeding the following values, promptly notify Contracting Officer and obtain direction before beginning work.
1. Concrete and Masonry: 13 percent. Allow new concrete to cure a minimum of 28 days.
2. Exterior Wood: 17 percent.
3. Interior Wood: 15 percent.
4. Interior Finish Detail Woodwork, Including Trim, and Casework: 10 percent.
5. Plaster and Gypsum: 15 percent.
6. Concrete Slab-On-Grade: Perform calcium chloride test over 24 hour period or other acceptable test to manufacturer. Verify acceptable moisture transmission and pH levels.
D. Examine surfaces to receive coatings for surface imperfections and contaminants that could impair performance or appearance of coatings, including but not limited to, loose primer, rust, scale, oil, grease, mildew, algae, or fungus, stains or marks, cracks, indentations, or abrasions.
E. Correct conditions that could impair performance or appearance of coatings in accordance with specified surface preparation procedures before proceeding with coating application.
3.2 PREPARATION – GENERAL
A. Clean surfaces thoroughly prior to coating application.
B. Do not start work until surfaces to be finished are in proper condition to produce finished surfaces of uniform, satisfactory appearance.
C. Stains and Marks: Remove completely, if possible, using materials and methods recommended by coating manufacturer; cover stains and marks which cannot be completely removed with isolating primer or sealer recommended by coating manufacturer to prevent bleed-through.
D. Remove Mildew, Algae, and Fungus using materials and methods recommended by coating manufacturer.
E. Remove dust and loose particulate matter from surfaces to receive coatings immediately prior to coating application.
F. Remove or protect adjacent hardware, electrical equipment plates, mechanical grilles and louvers, lighting fixture trim, and other items not indicated to receive coatings.
G. Move or protect equipment and fixtures adjacent to surfaces indicated to receive coatings to allow application of coatings.
H. Protect adjacent surfaces not indicated to receive coatings.
I. Prepare surfaces in accordance with manufacturer's instructions for specified coatings and indicated materials, using only methods and materials recommended by coating manufacturer.
09 91 00_5/6
3.3 SURFACE PREPARATION
A. Concrete and Concrete Masonry: Clean surfaces free of loose particles, sand, efflorescence, laitance, form oil, curing compounds, and other substances which could impair coating performance or appearance.
B. Existing Coatings:
1. Remove surface irregularities by scraping or sanding to produce uniform substrate for coating application; apply one coat primer of type recommended by coating manufacturer for maximum coating adhesion.
2. If presence of lead in existing coatings is suspected, cease surface preparation and notify Contracting Officer immediately.
C. Gypsum Board: Repair cracks, holes and other surface defects with joint compound to produce surface flush with adjacent surfaces.
D. Metals - Aluminum, Mill-Finish: Clean and etch surfaces with a phosphoric acid- water solution or water based industrial cleaner. Flush with clean water and allow to dry, before applying primer coat.
E. Metals - Ferrous, Unprimed: Remove rust or scale, if present, by wire brush cleaning, power tool cleaning, or sandblast cleaning; remove grease, oil, and other contaminants which could impair coating performance or appearance by solvent cleaning, with phosphoric-acid solution cleaning of welds, bolts and nuts; spot-prime repaired welds with specified primer.
F. Metals - Ferrous, Shop-Primed: Remove loose primer and rust, if present, by scraping and sanding, feathering edges of cleaned areas to produce uniform flat surface; solvent-clean surfaces and spot-prime bare metal with specified primer, feathering edges to produce uniform flat surface.
G. Metals - Galvanized Steel (not passivated): Clean with a water-based industrial strength cleaner, apply an adhesion promoter followed by a clean water rinse. Alternately, wipe down surfaces using clean, lint-free cloths saturated with xylene or lacquer thinner;
followed by wiping the surface dry using clean, lint-free cloths.
H. Metals - Galvanized Steel, Passivated: Clean with water-based industrial strength cleaner. After the surface has been prepared, apply recommended primer to a small area. Allow primer to cure for 7 days, and test adhesion using the "cross-hatch adhesion tape test" method in accordance with ASTM D 3359. If the adhesion of the primer is positive, proceed with a recommended coating system for galvanized metal.
I. Wood:
1. Seal knots, pitch streaks, and sap areas with sealer recommended by coating manufacturer; fill nail recesses and cracks with filler recommended by coating manufacturer; sand surfaces smooth.
2. Apply primer coat to back of wood trim and paneling.
3.4 APPLICATION – GENERAL
A. Apply each coat to uniform coating thickness in accordance with manufacturer's instructions, not exceeding manufacturer's specified maximum spread rate for indicated surface; thins, brush marks, roller marks, orange-peel, or other application imperfections are not permitted.
B. Allow manufacturer's specified drying time, and ensure correct coating adhesion, for each coat before applying next coat.
C. Inspect each coat before applying next coat; touch-up surface imperfections with coating material, feathering, and sanding if required; touch-up areas to achieve flat, uniform surface without surface defects visible from 39”.
D. Remove dust and other foreign materials from substrate immediately prior to applying each coat.
09 91 00_6/6
E. Where paint application abuts other materials or other coating color, terminate coating with a clean sharp termination line without coating overlap.
F. Where color changes occur between adjoining spaces, through framed openings that are of same color as adjoining surfaces, change color at outside stop corner nearest to face of closed door.
G. Re-prepare and re-coat unsatisfactory finishes; refinish entire area to corners or other natural terminations.
3.5 CLEANING
A. Clean excess coating materials, and coating materials deposited on surfaces not indicated to receive coatings, as construction activities of this section progress; do not allow to dry.
B. Re-install hardware, electrical equipment plates, mechanical grilles and louvers, lighting fixture trim, and other items that have been removed to protect from contact with coatings.
C. Reconnect equipment adjacent to surfaces indicated to receive coatings.
D. Relocate to original position equipment and fixtures that have been moved to allow application of coatings.
E. Remove protective materials.
3.6 PROTECTION
A. Protect completed coating applications from damage by subsequent construction activities.
B. Repair to Contracting Officer's acceptance coatings damaged by subsequent construction activities. Where repairs cannot be made to Contracting Officer's acceptance, re- apply finish coating to nearest adjacent change of surface plane, in both horizontal and vertical directions.
10 26 13_1/4
SECTION 10 26 13
160 HIGH IMPACT CORNER GUARD
PART 1 - GENERAL
1.01 SUMMARY
A. Corner guard system for wall protection
1.02 SECTION INCLUDES
A. 160 High Impact Surface Mount Corner Guard System
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM) B. National Building Code of Canada (NBC) C. National Fire Protection Association (NFPA) D. Society of Automotive Engineers (SAE) E. Underwriters Laboratory (UL) F. Underwriters Laboratory of Canada (ULC) G. Uniform Building Code (UBC)
1.04 SYSTEM DESCRIPTION
A. Performance Requirements: Provide corner guard system that conform to the following requirements of regulatory agencies and the quality control of IPC Door and Wall Protection Systems, InPro Corporation.
1. Fire Performance Characteristics: Provide UL Classified corner guards conforming with NFPA Class A fire rating. Surface burning characteristics, as determined by UL-723 (ASTM E-84), shall be flame spread of 10 and smoke development of 350 - 450. Provide ULC (Canada) listed corner guards conforming to the requirements of the National Building Code of Canada 2010, Subsection 3.1.13. Surface burning characteristics, as determined by CAN/ULC- S102.2, shall be flame spread of 15 and smoke developed of 35.
2. Self-Extinguishing: Provide corner guards with a CC1 classification, as tested in accordance with the procedures specified in ASTM D-635-74, Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Self-Supporting Plastics in a Horizontal Position, as referenced in UBC 52-4-1988.
3. Impact Strength: Provide rigid vinyl profile materials that have an Impact Strength of 30.2 ft-lbs/inch of thickness as tested in accordance with the procedures specified in ASTM D-256-90b, Impact Resistance of Plastics.
4. Chemical and Stain Resistance: Provide corner guards that show resistance to stain when tested in accordance with applicable provisions of ASTM D-543.
5. GREENGUARD Certified: Provide GREENGUARD Certified material.
Profiles shall meet the requirements of GREENGUARD Certification Standards for Low-Emitting Products and GREENGUARD Product Emission Standard for Children & Schools.
6. Fungal and Bacterial Resistance: Provide rigid vinyl that does not support fungal or bacterial growth as tested in accordance with ASTM G- 21 and ASTM G-22.
10 26 13_2/4
7. Color Consistency: Provide components matched in accordance with SAE J-1545 - (Delta E) with a color difference no greater than 1.0 units using CIE Lab, CIE CMC, CIE LCh, Hunter Lab or similar color space scale systems.
1.05 SUBMITTALS
A. Product Data: Manufacturer’s printed product data for each type of corner guard specified.
B. Detail Drawings: Mounting details with the appropriate adhesives for specific project substrates.
C. Samples: Verification samples of corner guard, 8" (203mm) long, in full size profiles of each type and color indicated.
D. Manufacturer’s Installation Instruction: Printed installation instructions for each corner guard.
1.06 DELIVERY, STORAGE AND HANDLING
A. Deliver materials in unopened factory packaging to the jobsite B. Inspect materials at delivery to assure that specified products have been received.
C. Store in original packaging in a climate controlled location away from direct sunlight.
1.07 PROJECT CONDITIONS
A. Environmental Requirements: Products must be installed in an interior climate controlled environment.
1.08 WARRANTY
A. Standard IPC Limited Lifetime Warranty against material and manufacturing defects.
PART 2 - PRODUCTS
2.01 MANUFACTURER
A. Acceptable Manufacturer: IPC Door and Wall Protection Systems, InPro Corporation, PO Box 406 Muskego, WI 53150 USA; Telephone:
800-222-5556, Fax: 888-715-8407, Internet address: http://www.inprocorp.com
B. Provide all corner guards and wall protection from a single source.
2.02 MANUFACTURED UNITS
A. Corner Guard System 160 High Impact Corner Guard Profile 2" (51mm) x 2" (51mm), 90 degree 4’ (1.22m), 8' (2.44m) and 9' (2.74m) standard heights Custom heights available Custom Angles – Provide vinyl covers and retainers with custom angles. Custom angles shall be between 112.5° and 157.5°. Provide flexible top caps to bend to retainer angle.
2.03 MATERIALS
A. Vinyl: Snap on cover of .080" (2mm) thickness shall be made from chemical and stain-resistant unplasticized polyvinyl chloride (uPVC) with the addition of http://www.inprocorp.com/
10 26 13_3/4 impact modifiers. No plasticizers shall be added (plasticizers may aid in bacterial growth).
B. Aluminum: Continuous aluminum retainer of .070" (1.8mm) thickness shall be fabricated from 6063-T5 aluminum, with a mill finish.
2.04 COMPONENTS
A. Top caps and bottom caps shall be made of injection molded thermoplastics.
B. Fasteners: All mounting system accessories appropriate for substrates indicated on the drawings shall be provided.
C. Optional flexible top caps shall be made of injection molded Biopolymer Flex PVC.
2.05 FINISHES
A. Vinyl Covers: Colors of the corner guard to be selected by the architect from the IPC finish selection. Surface shall have a pebblette texture.
B. Molded Components: Top caps and bottom caps shall be of a color matching the corner guards. Surface shall have a pebblette texture.
PART 3 - EXECUTION
3.01 EXAMINATION
A. Examine areas and conditions in which the corner guard systems will be installed.
1. Complete all finishing operations, including painting, before beginning installation of corner guard system materials.
B. Wall surface shall be dry and free from dirt, grease and loose paint.
3.02 PREPARATION
A. General: Prior to installation, clean substrate to remove dust, debris and loose particles.
3.03 INSTALLATION
A. General: Locate corner guard as indicated on the approved detail drawings for the appropriate substrate and in compliance with the IPC installation instructions. Install corner guard level and plumb at the height indicated on drawings.
B. Installation of 160 High Impact Surface Mount Corner Guard:
1. Position the aluminum retainer against the wall, allowing 5/16" (8mm) from the bottom of the aluminum to the top of the cove base or baseboard for the bottom cap.
2. Aluminum Retainer Installation Drywall installation: Secure the aluminum retainer to the wall using 1-1/4" phillips round head self-tapping screws. Use 6 screws per 4' (1.22m) length, 10 screws per 8' (2.44m) length, or 12 screws per 9' (2.74m) length. The aluminum retainer is pre-slotted to aid in the installation.
Concrete installation: Drill 1/4" holes into the ends of the retainer for top and bottom caps. Use the slotted tabs of the top caps as a template for hole location.
Transfer the location of all mounting holes to the wall. Drill 1/4" (6.5mm) holes and position ALLIGATOR anchors into the holes on the wall. Mount the retainer with #10 x 1-3/4" phillips pan head screws and tighten to secure the retainer to the wall.
3. Top and Bottom Cap Installation Drywall installation: Overlap the aluminum with the mounting tabs of the top cap and attach them to the aluminum retainer using two, 1-3/4"
10 26 13_4/4
Phillips flat head self-tapping screws per cap. Concrete installation: Overlap the aluminum with the mounting tabs of the top and bottom caps and attach them to the aluminum retainer using two, #8 x 1-1/2" Phillips flat head screws per cap.
When installing flexible top caps on custom angle corner guards, use cup washers and flat head screws to fasten the top caps to the retainer.
4. Position the vinyl cover on the aluminum retainer to check the fit. Adjust the top cap on the aluminum retainer to obtain a tight fit with the vinyl cover. Starting at the top, push the vinyl cover over the aluminum, by pressing over the length until the vinyl snaps securely into place.
3.04 CLEANING
A. At completion of the installation, clean surfaces in accordance with the IPC clean-up and maintenance instructions.
| 1.02 MANUFACTURER |
| 1.03 HANDLING AND STORAGE |
| PART 2 - MATERIALS |
| PART 3 - EXECUTION |
| 3.02 CONDITIONS |
| 3.03 INSTALLATION |
| 3.04 CLEANING AND WAXING |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.4 PRE-INSTALLATION MEETINGS |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.6 PROJECT CONDITIONS |
| 1.7 SEQUENCING |
| PART 2 PRODUCTS |
| 2.0 PRODUCT PERFORMANCE AND TECHNICAL DATA |
| 2.1 EXAMINATION |
| 2.2 PREPARATION |
| 2.3 INSTALLATION |
| 1.2 SUMMARY |
| 1.3 PREINSTALLATION MEETINGS |
| 1.4 ACTION SUBMITTALS |
| 1.5 INFORMATIONAL SUBMITTALS |
| 1.6 CLOSEOUT SUBMITTALS |
| 1.7 MAINTENANCE MATERIAL SUBMITTALS |
| 1.8 QUALITY ASSURANCE |
| 1.9 DELIVERY, STORAGE, AND HANDLING |
| 1.10 FIELD CONDITIONS |
| 1.11 WARRANTY |
| 2.1 MANFACTURERS: |
| 1. Bentley Mills: |
| 2. Engineered Floors: |
| 3. Interface Americas: |
| 4. Mannington: |
| 5. Milliken: |
| 6. Mohawk: |
| 7. Tarkett: |
| 2.2 INSTALLATION ACCESSORIES |
| PART 3 EXECUTION |
| 3.2 PREPARATION |
| 3.3 INSTALLATION |
| 3.4 CLEANING AND PROTECTION |
| 1.2 REFERENCES |
| 1.3 DEFINITIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| 1.7 PROJECT CONDITIONS |
| 1.8 WARRANTY |
| 1.9 EXTRA MATERIALS |
| PART 2 PRODUCTS |
| 2.2 MATERIALS – GENERAL |
| 2.3 MIXING AND TINTING |
| 2.4 INTERIOR PRIMERS - NEW CONSTRUCTION |
| 2.5 INTERIOR PRIMERS - PREVIOUSLY PAINTED SURFACES |
| 2.6 INTERIOR FINISH COAT |
| PART 3 EXECUTION |
| 3.2 PREPARATION – GENERAL |
| 3.3 SURFACE PREPARATION |
| 3.4 APPLICATION – GENERAL |
| 3.5 CLEANING |
| 3.6 PROTECTION |
| 1.02 SECTION INCLUDES |
| 1.03 REFERENCES |
| 1.04 SYSTEM DESCRIPTION |
| 1.05 SUBMITTALS |
| 1.06 DELIVERY, STORAGE AND HANDLING |
| 1.07 PROJECT CONDITIONS |
| 1.08 WARRANTY |
| PART 2 - PRODUCTS |
| 2.02 MANUFACTURED UNITS |
| 2.03 MATERIALS |
| 2.04 COMPONENTS |
| 2.05 FINISHES |
| PART 3 - EXECUTION |
| 3.02 PREPARATION |
| 3.03 INSTALLATION |
| 3.04 CLEANING |
File details come from the government source that posted it. Updated .