About this file

This is a Quality Assurance Surveillance Plan (QASP) for a Performance Based Service Contract governing the harvesting of corn silage for NCAH (National Center for Animal Health). The QASP establishes Government surveillance methods to ensure the Contractor performs in accordance with specified performance metrics and that the Government receives acceptable quality services and only pays for services that meet contract requirements.

The document defines roles and responsibilities for the Contracting Officer and Contracting Officer's Representative (COR). The COR assigns fields to harvest and placement locations for silage bags while maintaining technical oversight of contractor performance. Quality assurance surveillance employs three methods: customer feedback through formal written complaints maintained in a log, periodic inspections during harvest of fields, harvesting processes, and bagging operations, and 100% inspection through forage test analysis on each bag when opened. Required services include chopping at optimum dry matter (63-68% DM with acceptable quality level of 62-70%), achieving consistent particle size of ¾" (85% or greater at ¾" with none larger than 1½"), ensuring tight packing with no evidence of large air pockets, tracking accurate weights by truck/wagon load and by field with legible records, and maintaining personnel safety with no damage to Government property. Surveillance methods include forage moisture tests, visual evaluations of chopped silage and bag construction, certified weight scales, and observation of safety reports. The COR maintains a complete Quality Assurance file with all records retained for the contract's duration.

View the file

Other files for this federal contract opportunity

Other files attached to Corn Silage Chopping, newest first.
File Type Posted
Attachment 2 - Wage Determination.pdf PDF
C05_Attachment 1 - Revised Statement of Work 1232SA26Q0457.pdf PDF
SF-30.pdf PDF
C05_CSS_Commercial Products and Services .08.25.26 1232SA26Q0457.pdf PDF
RFQ_1232SA26Q0457 Revised .06.26.2026.pdf PDF
RFQ__1232SA26Q0457 .06.02.2026.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 3 - Wage Determination.pdf PDF
RFQ_1232SA26Q0457.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

FOR

Harvesting NCAH Corn Silage

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued there under. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.

The QASP has been developed by the requiring activity. It is designed to provide direction to personnel performing contract surveillance activities. Personnel surveying the contract terms and conditions and SOW requirements will periodically review the QASP throughout the life of the contract.

The Contracting Officer’s Representative (COR) will assign fields to harvest and placement location of silage bags.

2. SCOPE

The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to ensure the products/results specified in the PR&C or task order are delivered on time and meet the requirements of the PR&C or task order. The QASP is not intended to duplicate the Contractor’s Management Plan.

3. GOVERNMENT RESOURCES

The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.

Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.

4. RESPONSIBILITIES:

The Government resources shall have responsibilities for the implementation of this QASP as follows:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that ensures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the project and ensures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

5. METHODS OF QA SURVEILLANCE

The below listed methods of surveillance shall be used in the administration of this QASP.

Customer Feedback – Customer feedback may be obtained from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR. The COR shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file.

Periodic Inspection – The COR shall conduct periodic inspections during the harvest to include inspection of fields, harvesting process and bagging operations to verify compliance with specifications as outlined in Statement of Work. These may include visual appraisal of chopped silage prior to bagging, bag construction/tension, testing of moisture content, review of documented weight and safety records.

100% Inspection – Forage Test Analysis will be run on each bag when opened to assess dry matter content, nutrient content and particle size.

6. LEVELS AND STANDARDS OF SERVICE

The standards of services are held to and comply with the standards specified in the PR&C, commercial/industry, and military/government standards.

7. IDENTIFIED QA SURVEILLANCE ITEMS

Required Services (Tasks)

Performance Standards

Acceptable Quality Levels

Methods of

Surveillance

*Chop at optimum Dry Matter (DM)

*Assure consistent chopped particle size

*Assure silage is tightly packed to eliminate air pockets

*Track, record, and provide verified weight (tons) of silage harvested by truck/wagon load

*Track, record, and provide verified weight (tons) of silage harvested per field

Safety – personnel and government property

63-68% DM

Particle size of ¾”

No evidence large quantity of air or air pockets.

Track accurate weight of silage hauled by each truck or wagon used.

Track accurate weight of silage harvest by field.

No personnel safety issues or damage to government property and/or equipment

62-70%

85% or greater at the ¾” size with none larger than 1 ½” size

No evidence large quantity of air or air pockets.

Records legible and easy to understand

Records legible and easy to understand

No reported safety issues

Forage Moisture Test and/or forage probe

Visual evaluation of chopped silage prior to bagging

Visual evaluation of bag tension and construction (i.e.

bulges, wrinkles, etc.)

Certified weight scale

Review of weight/load documents during harvest.

Observation and safety reports

8. DOCUMENTATION

The COR shall, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract.