Attachment 2 - QASP.pdf
PDF 421 KB Posted
- Attached to
- SHARP Phone Line Relocation Federal contract opportunity
- Solicitation number
- W9124C-24-Q-0002
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a firm fixed-price contract to engineer, furnish, install, and test Category 6 cabling to relocate and install SHARP phones in seven buildings at Fort Jackson. The contractor is responsible for providing all labor, equipment, supplies, and coordination required for the work. The Government will use 100% inspection, periodic inspection, and customer feedback to monitor the contractor's performance. The QASP defines non-conforming performance levels and the procedures for issuing and tracking contract discrepancy reports. It also outlines the roles and responsibilities of the Contracting Officer and Contracting Officer's Representative, as well as requirements for data analysis, acceptance of services, and contractor reporting. The related federal contract opportunity is Solicitation Number W9124C-24-Q-0002 for the SHARP Phone Line Relocation project at the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 4.30.24.pdf | ||
| Q and A_4.30.24.pdf | ||
| W9124C-24-Q-0002.pdf | ||
| Attachment 1 - PWS SHARP Telephone Relocation.pdf | ||
| Attachment 3 - Fort Jackson Vetting Policy 18 October 2021.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
For
165th BDE SHARP PHONE RELOCATION
FOR BUILDINGS 10570, 10560, 11955, 11954, 11953,
11952 & 11951 November 17th, 2023
AT
FORT JACKSON
Ms. Sherron Gibbs Contracting Officer Contracting Officer’s Representative Mission Contracting Office 165th Infantry Brigade Fort Jackson, South Carolina Fort Jackson, South Carolina
165th SHARP PHONE RELOCATION 2
TABLE OF CONTENTS
Subject Page Number
1. Overview
2. Description of Services
3. Roles and Responsibilities
4. Contract Quality Requirements
5. Government Surveillance
6. Non-Conforming Performance
7. Deduct Plan
8. Data Analysis
9. Acceptance of Services
10. COR Status Report
11. Contractor Manpower Reporting Application (CMRA)
12. Contractor Performance Assessment Reporting System (CPARS)
13. COR/Quality Assurance Surveillance Files
14. QASP Changes
165th SHARP PHONE RELOCATION 3
1. Overview.
1.1. Purpose. The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to ensure it receives the services under this contract as identified in the Performance Work Statement (PWS).
1.2. Intent. The intent of this QASP is to: 1) ensure Contractor performance meets or exceeds contract terms, conditions and specifications; 2) hold the Contractor accountable for quality control; and 3) encourage the Contractor to take appropriate steps to control and improve quality.
Accordingly, the Government will perform surveillance on the contract in accordance with this QASP, but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary to ensure that the rendered services conform to contract requirements. The Government also reserves the right to perform quality assurance at the Subcontractor level and perform quality assurance at the contractor's place of business, if applicable. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor.
2. Description of Services.
2.1. Scope of Work. The contractor shall provide all labor, equipment, supplies, material, and coordination required to engineer, furnish, install, and test (EFI&T) the Category 6 (CAT 6) cabling required to relocate and install the SHARP phones located in buildings 10570, 10560, 11955, 11954, 11953, 11952, and 11951. The contractor shall EFI&T and cutover a completely operational system. Downtime shall not occur without specific Government approval. Any scheduled downtime shall occur during off-duty hours/weekends and shall be kept to a minimum. The system shall be reliable and expandable.
2.2. Type of Contract. The contract is a firm fixed price contract.
3. Roles and Responsibilities. The contractor shall provide all labor, equipment, supplies, material, and coordination required to engineer, furnish, install, and test (EFI&T) the Category 6 (CAT 6) cabling required to relocate and install the SHARP phones located in buildings 10570, 10560, 11955, 11954, 11953, 11952, and 11951. The contractor shall EFI&T and cutover a completely operational system. Downtime shall not occur without specific Government approval.
Any scheduled downtime shall occur during off-duty hours/weekends and shall be kept to a minimum. The system shall be reliable and expandable. The Government shall designate a site point of contact (POC) and provide the Contractor with the name and contact information. The Site POC shall coordinate building access and passes as required after receipt of all required documentation from the Contractor.
3.1. Government.
3.1.1. Contracting Officer (KO). The KO is the only person with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
165th SHARP PHONE RELOCATION 4
3.1.2. Contracting Officer’s Representative (COR). The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies;
coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
4. Contract Quality Requirements.
4.1. Contractor’s Quality Control Program. The Contractor shall ensure services are performed in accordance with this PWS. The Contractor shall identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
4.2. Government Quality Assurance. The Government shall evaluate the Contractor’s performance under this contract in accordance with this QASP. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and minimum acceptable defect rate(s).
5. Government Surveillance.
5.1. Methods of Surveillance. The following Methods of Surveillance will be utilized in monitoring the Contractors’ performance:
5.1.1. 100% Inspection
5.1.3. Periodic Inspection
5.1.4. Customer Feedback. The DA Form 5477, Customer Complaint Record, Attachment 2, will be used to document/record all complaints. The following procedures will be followed when a complaint is received.
• The COR will investigate and determine the validity of the complaint.
• If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical.
165th SHARP PHONE RELOCATION 5
• For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be followed.
5.2. Surveillance Schedule. A Surveillance Schedule will be created each month utilizing the DA 5475, COR Surveillance Schedule, Attachment 3. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. A copy of the Surveillance Schedule will be filed in the Virtual Contracting Enterprise (VCE), COR Management Tool, https://cor.army.mil/, in accordance with the MICC-FSH, VCE, COR’S ONLINE FILE, File Plan (Either as an Attachment to the Monthly COR Status Reports or uploaded separately in the Miscellaneous Documents Section of the CORs’ Online File.).
5.3. Surveillance Instructions/Checklists. Surveillance Checklists, Attachment 4, will be utilized and completed when surveillances are conducted
5.4. Surveillance Documentation. The applicable Surveillance Checklist(s) will be completed when/as Surveillances are conducted. Completed Surveillance Checklist(s) will be filed in the Virtual Contracting Enterprise (VCE), COR Management Tool, https://cor.army.mil/, in accordance with the MICC-FSH, VCE, COR’S ONLINE FILE, File Plan (Either as an Attachment to Monthly COR Status Reports or uploaded separately in the Miscellaneous Documents Section of the CORs’ Online File.).
6. Non-Conforming Performance. Non-conformance occurs when a Contractor fails to meet Contract or Task Order terms, conditions and/or specifications. All instances of non-conformance will be documented and the Contractor will be notified. Resolution of non-conformance discovered at the Subcontractor level will be addressed with the prime Contractor.
Non-conformance is classified as either: Level I (Minor); Level II (Major); or Level III (Critical).
6.1. Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written Contract Discrepancy Report (CDR). However, the Government is still required to document verbal Level I CDRs. The COR may issue verbal Level I CDRs directly to the appropriate level of Contractor management. The COR will notify the KO as soon as practical when a verbal Level I CDR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency. The KO will issue and sign written Level I CDRs, Attachment 5.
6.2. Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, a large number of documented Level I CDRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II CDRs. The KO issues all Level II CDRs in writing, Attachment 5. The COR will notify the KO as soon as practical when a major non-conformance is identified.
6.3. Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the manner in which the services are performed; prevent or impact a vital agency mission https://cor.army.mil/ https://cor.army.mil/
165th SHARP PHONE RELOCATION 6 as a result of performance; or are for repeated or uncorrected Level II CDRs. The Contracting Office Director or Deputy Director issues written Level III CDRs. The COR is responsible for notifying the KO immediately upon discovery of a critical non-conformance.
6.4. Documenting CDRs. Documentation, as a minimum, will include: the Contract or Task Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; Contractor representative who was notified; and the suspense date for Contractor response/corrective action.
6.5. Tracking and Resolving CDRs. All CDRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The COR and KO shall track CDRs to ensure the Contractor indentifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work.
7. Deduct Plan. N/A
8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Status Reports and may be used to make adjustments to surveillance schedules, increase or decrease surveillance, if deemed appropriate. Negative trends noted using Government data/observations could result in issuing the Contractor a Contract Discrepancy Report. Trends noted using Contractor data will not result in a CDR unless the Contractor is not addressing the negative trend.
9. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment of the Contractor. This is accomplished by approving the Contractor’s Receiving Reports in Wide Area Workflow at https://wawf.eb.mil/.
10. COR Status Report. COR Status Reports will be submitted on a Monthly basis to the Contracting Officer via the COR Management Tool. COR Status Reports will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis will contain a summary of: surveillances performed; Customer Feedback, if any; CDRs, if any; an analysis of the Contractors performance; recommended adjustments to surveillance schedules;
and any other pertinent contract information. Completed Surveillance Checklists and CDRs, if any, will be included as attachments to COR Status Reports or uploaded separately in the Miscellaneous Documents Section of the CORs’ Online file.
11. Contractor Manpower Reporting Application (CMRA). In accordance with Office of the Secretary of Defense Memorandum, Enterprise-wide Contractor Manpower Reporting Application, dated 28 Nov 2012, the Contractor must report contractor manpower to the Contractor Manpower Reporting website at https://cmra.army.mil. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
The COR shall verify that the Contactor has complied with the required contractor manpower https://wawf.eb.mil/ https://cmra.army.mil/
165th SHARP PHONE RELOCATION 7 reporting annually and document the results in the VCE, COR Module, CORs’ Online File, CMRA section.
12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback and CDRs, if any) will be used to support CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information.
13. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance File will be maintained in the on-line COR Management Tool per Army Contracting Command Pamphlet, 70-1. Documents will be filed in the COR Management Tool in accordance with the MICC-FSH, VCE, COR’S ONLINE FILE, File Plan.
14. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes.
Sherron Gibbs Supply Management Analyst 165th INF BDE 803-751-1992
Contracting Officer’s Signature Block
Attachments:
1. Performance Requirements Summary (PRS)
2. Customer Complaint Record, DA Form 5477
3. Surveillance Schedule, DA Form 5475
4. Surveillance Checklist(s)
5. Contract Discrepancy Report, DA Form 5479
165th SHARP PHONE RELOCATION 8
Attachment 1
Performance Requirements Summary (PRS)
The contractor shall install new conduit (1 inch) from the existing telecommunications room to the designated laundry rooms at buildings 10570, 10560, 11955. 11954, 11953, 11952, and 11951. The contractor shall bore a 2 (two) inch hole in the wall at the telecommunications room, through the fire-resistance-rated wall at the entrance of each bay and through the laundry room of each location. The contractor shall fire stop walls as required by the National Electrical Code and local codes. The contractor shall route the conduit from the telecommunications room, above the ceiling of each bay, and to the new location in each laundry room. The dual data port shall be placed inside of each laundry room, five (5) feet from the floor and near the entrance door of each laundry room. The contractor shall run, install, and terminate the dual CAT 6 cable from the telecommunication room to the laundry room, using the newly installed one (1) inch conduit. All jacks will be labeled IAW I3A standards. All new laundry room, port locations, will be designated and confirmed by the contact POC.
165th SHARP PHONE RELOCATION 9
Attachment 2
Customer Complaint Record, DA Form 5477
DA FORM 5477
165th SHARP PHONE RELOCATION 10
Attachment 3
Surveillance Schedule, DA Form 5475
DA FORM 5479
Administrator You will need to develop a monthly schedule for conducting surveillance. You can use this form. The date you are going to conduct surveillance would go in the far left column. You would list the PWS, paragraph number for the task you are going to surveill on the top line.
165th SHARP PHONE RELOCATION 11
Attachment 4
Surveillance Checklist(s)
COR Inspection Checklist & Data Report (Fixed Firm Price Contract)
Meeting Contract Requirements
Contractor:
Contract Number:
Service Provided:
COR Name:
Date: YES No N/A
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
Administrator You will need to create a checklist or checklists that you will complete/fill out when you conduct surveillance. You would start each task to be surveilled in the form of a question (Did the Contractor…?). Also, include the PWS, paragraph number for each question.
165th SHARP PHONE RELOCATION 12
Comments:
Comments:
Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:
165th SHARP PHONE RELOCATION 13
Attachment 5
Contract Discrepancy Report, DA Form 5479
DA FORM 5475
| 2024-01-17T14:31:15-0500 | |
| GIBBS.SHERRON.NICOLE.1249799536 |
File details come from the government source that posted it. Updated .