Attachment 2 Proposal Form-Hanel Maintenance.pdf

PDF 210 KB Posted

Attached to
HANEL LIFT SYSTEM Annual Maintenance
Solicitation number
W9127Q-23-R-0005
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2: Proposal Form W9127Q-23-R-0005 Hanel Lift Maintenance Svs

PROPOSAL FORM

HANEL LIFT MAINTENANCE SERVICES

REQUIREMENT: This requirement is to provide the Mississippi Army National Guard (ARNG) with Annual Maintenance Services for three (3) Hanel Parts Tower(s). Contractor shall provide all personnel, equipment, tools, materials/parts, supervision, and quality control necessary to perform annual Maintenance Services on three (3) Hanel Parts Tower(s) located at the MS- AVCRAD Gulfport, Mississippi. Contractor shall be responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications. Each CLIN is for services for all three (3) units.

CLIN Description Qty U/M PER HR or EA Amount

0001 ANNUAL PREVENTIVE MAINTENANCE SVS ‐ Base Year 3 JOB $_____________ $______________

LABOR HOUR breakdown per system HR $_____________

0002 REPAIR PARTS for HANEL LIFT MAINTENANCE ‐ Base Year 1 JOB NTE‐TBD

CPU 2 per System 1 EA $_____________

Display per System 1 EA $_____________

Memory cards per System 1 EA $_____________

Freight 1 EA $_____________

1001 ANNUAL PREVENTIVE MAINTENANCE SVS ‐ Option Year 1 3 JOB $_____________ $______________

LABOR HOUR breakdown per system HR $_____________

1002 REPAIR PARTS for HANEL LIFT MAINTENANCE ‐ Option Year 1 1 JOB NTE‐TBD

CPU 2 per System 1 EA $_____________

Display per System 1 EA $_____________

Memory cards per System 1 EA $_____________

Freight 1 EA $_____________

2001 ANNUAL PREVENTIVE MAINTENANCE SVS ‐ Option Year 2 3 JOB $_____________ $______________

LABOR HOUR breakdown per system HR $_____________

2002 REPAIR PARTS for HANEL LIFT MAINTENANCE ‐ Option Year 2 1 JOB NTE‐TBD

CPU 2 per System 1 EA $_____________

Display per System 1 EA $_____________

Memory cards per System 1 EA $_____________

Freight 1 EA $_____________

Attachment 2: Proposal Form W9127Q-23-R-0005 Hanel Lift Maintenance Svs

3001 ANNUAL PREVENTIVE MAINTENANCE SVS ‐ Option Year 3 3 JOB $_____________ $______________

LABOR HOUR breakdown per system HR $_____________

3002 REPAIR PARTS for HANEL LIFT MAINTENANCE ‐ Option Year 3 1 JOB NTE‐TBD

CPU 2 per System 1 EA $_____________

Display per System 1 EA $_____________

Memory cards per System 1 EA $_____________

Freight 1 EA $_____________

4001 ANNUAL PREVENTIVE MAINTENANCE SVS ‐ Option Year 4 3 JOB $_____________ $______________

LABOR HOUR breakdown per system HR $_____________

4002 REPAIR PARTS for HANEL LIFT MAINTENANCE ‐ Option Year 4 1 JOB NTE‐TBD

CPU 2 per System 1 EA $_____________

Display per System 1 EA $_____________

Memory cards per System 1 EA $_____________

Freight 1 EA $_____________

TOTAL for MAINTENCE SERVICES for 3 HANEL SYSTEM TOTAL $ _____________

ACKNOWLEDGEMENT OF AMENDMENTS

The Offeror acknowledges receipt of amendments to this Solicitation Notice

Amendment No. Date:

Company Name.

Signature of person authorized to sign Name and title of Signing authority

**Proposal is valid for minimum of 60 days after proposal’s closing date/time.”

Note: In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this notice, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised offers solely to amend offers due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.

File details come from the government source that posted it. Updated .