Attachment 2 - Product List FARS 14 May.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- LT2517FARS_Upgrade_FireWorks_Install
About this file
This Excel file is a detailed product list for a Fire Alarm Reserve System (FARS) Upgrade and FireWorks Installation project at Peterson Space Force Base in Colorado. The document contains two primary sections: FY16 and FY17 building room specifications, and a comprehensive CLIN 001 Fire Alarm Update equipment list. The building room specifications include square footage, flooring types (primarily carpet and rubber), installation costs, and total pricing per room, with entries ranging from gymnasium spaces to command posts and administrative areas.
The CLIN 001 equipment section provides an extensive inventory of networking and fire alarm system components, including Cisco switches (Catalyst 9300), SFP transceivers, uninterruptible power supplies, fiber patching cables, FireWorks workstations and servers, LCD monitors, and associated software licenses. The project involves installing and programming equipment across multiple buildings, with specific quantities for each component type. The total project encompasses network infrastructure upgrades, fire alarm system enhancements, and comprehensive system integration, targeting buildings at Peterson Space Force Base with a focus on technical infrastructure modernization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - SOW FARS and FireWorks Final 30 July 2025.docx | DOCX document | |
| Attachment 3 - FARS Cyber Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY16
| Bldg | Rm | Square feet | Square yards | Furniture | Cove Base | Flooring Type | Flooring $$ | Flooring Total | Install | Install Total | Price per sq yd | Total Price for Bldg/Room | |
| *1 | 1000 (Granite Inn) | 1307 | 2085 | 232 | YES | YES | Carpet | $ 41.00 | $ 9,498.33 | $ 36.50 | $ 8,455.83 | $77.50 | $17,954.17 |
| *2 | 5000(Alt DV entrance) | 5300 | 1900 | 211 | YES | YES | Carpet | $ 43.80 | $ 9,246.67 | $ 36.50 | $ 7,705.56 | $80.30 | $16,952.22 |
| *4 | 4000(CE ) | 4102 | 1517 | 169 | YES | YES | Carpet | $ 43.80 | $ 7,382.73 | $ 36.50 | $ 6,152.28 | $80.30 | $13,535.01 |
| *4 | 5100 | 2195 | 244 | YES | YES | Carpet | $ 43.80 | $ 10,682.33 | $ 36.50 | $ 8,901.94 | $80.30 | $19,584.28 | |
| *8 | 101(Gym) | 111 | 1000 | 111 | YES | YES | Rubbber | $ 42.00 | $ 4,666.67 | $ 38.75 | $ 4,305.56 | $80.75 | $8,972.22 |
| *6 | 2000(Comm) | 2102 | 760 | 84 | YES | YES | Carpet | $ 43.80 | $ 3,698.67 | $ 36.50 | $ 3,082.22 | $80.30 | $6,780.89 |
| *7 | 3000(Conference Rm) | 3205 | 540 | 60 | YES | YES | Carpet | $ 43.80 | $ 2,628.00 | $ 36.50 | $ 2,190.00 | $80.30 | $4,818.00 |
| *8 | 1000(AAFES) | 1301 | 875 | 97 | YES | YES | Rubbber | $ 42.00 | $ 4,083.33 | $ 38.75 | $ 3,767.36 | $80.75 | $7,850.69 |
| *9 | 12014 | 1209 | 134 | YES | YES | Carpet | $ 43.80 | $ 5,883.80 | $ 36.50 | $ 4,903.17 | $80.30 | $10,786.97 | |
| *10 | 12110 | 373 | 41 | YES | YES | Carpet | $ 43.80 | $ 1,815.27 | $ 36.50 | $ 1,512.72 | $80.30 | $3,327.99 | |
| *11 | 12111 | 329 | 37 | YES | YES | Carpet | $ 43.80 | $ 1,601.13 | $ 36.50 | $ 1,334.28 | $80.30 | $2,935.41 | |
| 12 | 11000 | 11101 | 377 | 42 | $ 43.80 | $ 1,834.73 | $ 36.50 | $ 1,528.94 | $80.30 | $3,363.68 | |||
| 13 | 2000 | 2302 | 1462 | 162 | YES | YES | Vinyl | $ 42.30 | $ 6,871.40 | $ 36.50 | $ 5,929.22 | $78.80 | $12,800.62 |
| 14 | 1000 | 1312 | 463 | 51 | |||||||||
| 15 | 4000 | 4301 | 615 | 68 | YES | YES | Carpet | $ - 0 | $ - 0 | $0.00 | $0.00 | ||
| 322 | 200 | 22 | YES | YES | Carpet | $ - 0 | $ - 0 | $0.00 | $0.00 | ||||
| 4000 | 304 | 290 | 32 | YES | YES | Carpet | $ - 0 | $ - 0 | $0.00 | $0.00 | |||
| $129,662.15 |
| 16190 | 1799 |
| 489 | |
| 7 | remain |
FY 17
| Bldg | Rm | Square feet | Square yards | Furniture | Cove Base | Flooring Type | Flooring $$ | Flooring Total | Install | Install Total | Price per sq yd | Total Price for Bldg/Room | |
| 1 | 2000 (Gen Robinson) | 2352 | 250 | 28 | YES | YES | Carpet | $ 41.00 | $ 1,138.89 | $ 36.50 | $ 1,013.89 | $77.50 | $2,152.78 |
| 2 | 2000(Command Post) | 2308 | 1420 | 158 | YES | YES | Carpet | $ 41.00 | $ 6,468.89 | $ 36.50 | $ 5,758.89 | $77.50 | $12,227.78 |
| 3 | 3000(MWC) | 3301 | 695 | 77 | YES | YES | Carpet | $ 41.00 | $ 3,166.11 | $ 36.50 | $ 2,818.61 | $77.50 | $5,984.72 |
| 4 | 9000 | 9202 | 1610 | 179 | YES | YES | Carpet | $ 41.00 | $ 7,334.44 | $ 36.50 | $ 6,529.44 | $77.50 | $13,863.89 |
| 5 | 6000 | 6101 | 725 | 81 | YES | YES | Carpet | $ 41.00 | $ 3,302.78 | $ 36.50 | $ 2,940.28 | $77.50 | $6,243.06 |
| 6 | 3000 | 3104 | 625 | 69 | YES | YES | Carpet | $ 41.00 | $ 2,847.22 | $ 36.50 | $ 2,534.72 | $77.50 | $5,381.94 |
| 7 | 3000 | 3105 | 238 | 26 | YES | YES | Carpet | $ 41.00 | $ 1,084.22 | $ 36.50 | $ 965.22 | $77.50 | $2,049.44 |
| 8 | 3000 | 3106 | 1385 | 154 | YES | YES | Carpet | $ 41.00 | $ 6,309.44 | $ 36.50 | $ 5,616.94 | $77.50 | $11,926.39 |
| 9 | 3000 | 3106A | 312 | 35 | YES | YES | Carpet | $ 41.00 | $ 1,421.33 | $ 36.50 | $ 1,265.33 | $77.50 | $2,686.67 |
| 10 | 3000 | 3106B | 120 | 13 | YES | YES | Carpet | $ 41.00 | $ 546.67 | $ 36.50 | $ 486.67 | $77.50 | $1,033.33 |
| 11 | 9000 | 9101 | 821 | 91 | YES | YES | Carpet | $ 41.00 | $ 3,740.11 | $ 36.50 | $ 3,329.61 | $77.50 | $7,069.72 |
| 12 | 9000 | 9101B | 104 | 12 | YES | YES | Carpet | $ 41.00 | $ 473.78 | $ 36.50 | $ 421.78 | $77.50 | $895.56 |
| 13 | 9000 | 9101C | 392 | 44 | YES | YES | Carpet | $ 41.00 | $ 1,785.78 | $ 36.50 | $ 1,589.78 | $77.50 | $3,375.56 |
| 14 | 9000 | 9101D | 173 | 19 | YES | YES | Carpet | $ 41.00 | $ 788.11 | $ 36.50 | $ 701.61 | $77.50 | $1,489.72 |
| 15 | 9000 | 9102 | 340 | 38 | YES | YES | Carpet | $ 41.00 | $ 1,548.89 | $ 36.50 | $ 1,378.89 | $77.50 | $2,927.78 |
| 16 | 10100 | 10103 | 400 | 44 | YES | YES | Carpet | $ 41.00 | $ 1,822.22 | $ 36.50 | $ 1,622.22 | $77.00 | $3,422.22 |
| 17 | 10100 | 10103A | 230 | 26 | YES | YES | Carpet | $ 41.00 | $ 1,047.78 | $ 36.50 | $ 932.78 | $77.00 | $1,967.78 |
| 19 | 10100 | 10103C | 115 | 13 | YES | YES | Carpet | $ 41.00 | $ 523.89 | $ 36.50 | $ 466.39 | $77.50 | $990.28 |
| 20 | 10100 | 10101 | 410 | 46 | YES | YES | Carpet | $ 41.00 | $ 1,867.78 | $ 36.50 | $ 1,662.78 | $77.50 | $3,530.56 |
| 20 | 10100 | 10101A | 163 | 18 | YES | YES | Carpet | $ 41.00 | $ 742.56 | $ 36.50 | $ 661.06 | $77.50 | $1,403.61 |
| 10100 | 10101B | 127 | 14 | YES | YES | Carpet | $ 41.00 | $ 578.56 | $ 36.50 | $ 515.06 | $77.50 | $1,093.61 | |
| 3000 | 3210 | 550 | 61 | YES | YES | Carpet | $ 41.00 | $ 2,505.56 | $ 36.50 | $ 2,230.56 | $77.50 | $4,736.11 | |
| 2000 | 2208 | 358 | 40 | YES | YES | Carpet | $ 41.00 | $ 1,630.89 | $ 36.50 | $ 1,451.89 | $77.50 | $3,082.78 | |
| 11563 | 1106 | $99,535.28 |
CLIN 001 Fire Alarm Update
| Fire Alarm System Upgrade | |||||||
| Equipment | Qty | Total | Location | Install or Program | Brand Name | ||
| Catalyst 9300 24 GE SFP Ports Uplink Switch, Cisco C9300-24S-A | 8 | PSFB | Install and Program | Yes | |||
| 715 WAC 80+ platinum Conf 1 Secondary Power Supply Cisco PWR-C1-715WAC-P/2 | 8 | PSFB | Install and Program | Yes | |||
| 100BA SE SFP for GE MMF SFP port Cisco GLC-GE-100FX | 350 | PSFB | Install | Yes | |||
| 100BA SE SFP for GE S | |||||||
| Cisco GLC-GE-100FX | 15 | PSFB | Install | Yes | |||
| 1000BA SE-LX/LH SFP transceiver module | |||||||
| Cisco GLC-LH SMD | 10 | PSFB | Install | Yes | |||
| 1000BA SE-T SFP | |||||||
| Cisco GLC-TE | 10 | PSFB | Install | Yes | |||
| Uninterruptable Power Supply Trip Lite | |||||||
| SM1500RMXL2UTAA | 7 | PSFB | Install and Program | No | Must have same/equal specs | ||
| Extended Battery Pack | |||||||
| Tripp Lite BP36V42-3U | 7 | PSFB | Install and Program | No | Must have same/equal specs | ||
| Fiber Patching Cables Multi Mode LC to ST (50 feet) | 200 | PSFB | Install | No | |||
| Fiber Patching Cable Single Mode LC to ST (10 feet) | 10 | PSFB | Install | No | |||
| Training | 16 Hrs | PSFB | N/A | N/A | N/A | ||
| Labor | 100 Hrs | PSFB | Install and Program | N/A | |||
| GRAND TOTAL | |||||||
| FireWorks Installation | |||||||
| FW-UL7W - Workstation with 10 LTSC for Standalone configuration | 4 | PSFB | Install and Program | Yes | |||
| FW-UL7S - FireWorks Server with Window 10 LTSC for FireWorks networked configuration, redundant and non-redundant | 2 | PSFB | Install and Program | Yes | |||
| FW-24LCDUL - 22" LCD monitor Touch Screen - 22'' 16:9 LCD 115 Vac 1680x1050 resolution capacitive touch screen with integral speakers. | 2 | PSFB | Install | No | must be compatible with FireWorks | ||
| FW-RCZZFP - New Redundant Server Client license. One Hasp PIN Code. Requires one new FW-CGSUL base package, ordered separately. | 6 | PSFB | Install and Program | Yes | |||
| FW-CGSUL - Color Graphics Software with Common Controls | 1 | PSFB | Program | Yes | |||
| FW-42LCDHMK1 - 42'' wall mount bracket kit - single display, horizontal. | 2 | PSFB | Install | No | |||
| FW- SM1500RMXL2UTAA- Uninterruptable power supply (UPS) | 2 | PSFB | Install and Program | No | |||
| FW-BP36V42-3U - UPS extender | 3 | PSFB | Install and Program | No | |||
| FW- 42U Commuincations server rack | 1 | PSFB | Install | No | |||
| FW- CISCO Switch Model C9300-24S Fire Alarm System Network Switch | 1 | PSFB | Install and Program | Yes | |||
| FW- USB Keyboard | 2 | PSFB | Install | No | |||
| FW- USB Mouse | 2 | PSFB | Install | No | |||
| FW-Labor Hours - Programming, Software Install and Inspection of Operations of Fireworks, Must include the programming of the 3 exisiting workstations to make a fully functional Fireworks system. | 1 | PSFB and CMSS | Install and Program | ||||
| GRAND TOTAL |
File details come from the government source that posted it. Updated .